• 제목/요약/키워드: construction works

Search Result 1,812, Processing Time 0.024 seconds

A Study on the Introduction of a Rigging and Slinging Certificate System to Reduce a Struck by Object Accidents (건설현장 물체에 맞음 사고 저감을 위한 줄걸이 작업 전문 자격제도 도입에 관한 연구)

  • Yeom, Chun Ho;Lee, Jinho;Park, Hyeon
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.92-100
    • /
    • 2018
  • According to 'The Analysis of Industrial Accidents in 2016' by Ministry of Employment and Labor, the number of deaths caused by accidents in the construction field is 391, accounting for 47% of 826 industrial fatalities in all industries. The breakdown of the 391 fatalities of the construction industry shows that 'struck by an object' accident had 30 fatalities, the 3rd in frequency following falling (235) and crashing (32) accidents. This study aims to explore ways to reduce the 'struck by an object' accident with emphasis on safety education and certificate system for rigging and slinging works. This study reviews literature on rigging and slinging works and analyzes 'struck by an object' accidents. The rules and regulation on the rigging and slinging works are also reviewed both for Korea and other countries with best practices in construction safety such as Singapore, Japan, U.K., and U.S. The rigging and slinging certificate systems of those countries are also reviewed to find any advantage in the construction safety management. In addition, a pilot rigging and slinging certificate system was executed in one of domestic construction site followed by two surveys: one on the riggers who participated in the pilot operation and the other on general managers in domestic construction sites. Based on the analysis of the 'struck by an object' accidents and pilot operation, this study proposes a rigging and slinging certificate system to reduce accidents, enhancing safety condition of construction sites. The certificate system was proposed in a way to accommodate working practice of construction sites. Depending on rigging careers and a crane load capacity, riggers are eligible to apply either basic or master certificate which makes difference in the level of rigging works. The safety condition of rigging and slinging work could be substantially enhanced if workers, managers, supervisors, administrators, and policy makers work together consistently.

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

Reshoring effects on deflections of multi-shored flat plate systems under construction

  • Kang, Su-Min;Eom, Tae-Sung;Kim, Jae-Yo
    • Structural Engineering and Mechanics
    • /
    • v.45 no.4
    • /
    • pp.455-470
    • /
    • 2013
  • RC flat plates that have no flexural stiffness by boundary beams may be governed by a serviceability as well as a strength condition. A construction sequence and its impact on the distributions of construction loads among slabs tied by shores are decisive factors influencing immediate and long term performances of flat plate. Over-loading and tensile cracking in early-aged slabs significantly increase the deflection of a flat plate system under construction. A reshoring work may be helpful in reducing slab deflections by controlling the vertical distributions of construction loads in a multi-shored flat plate system. In this study, a change of construction loads by reshoring works and its effects on deflections of flat plate systems under construction are analyzed. The slab construction loads with various reshoring schemes are defined by a simplified method, and the practical calculation of slab deflections with considering construction sequences and concrete cracking effects is applied. From parametric studies, the reshoring works are verified to reduce construction loads and slab deflections.

Continuous Overlap Pile by Using Concrete Guide for Soil Sheeting Works (콘크리트 가이드를 이용한 흙막이용 겹침연속말뚝)

  • Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.12-13
    • /
    • 2021
  • As construction projects are gradually getting larger and focusing on building skyscraper with the development of construction technology and the concentration of population in cities, the choice of the soil sheeting works is very important in terms of securing safety and economic feasibility. Further research is planned on the developed concrete guide-based continuous over lap pile method through the introduction of a system that automates vertical management, continuous improvement and supplementation so that the basement soil sheeting wall can be utilized as a building structure.

  • PDF

Study on the Safe Evacuation Management in a Power Supply Disturbed Emergency

  • Suzuki, Nobuyuki;OHASHI, Tsubasa;WHORLOW, James R
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.87-91
    • /
    • 2015
  • For construction projects it is imperative that site management gives the highest priority to planning safe site evacuation for all foreseeable emergencies, including earthquakes and typhoons which are often experienced in Japan. This is especially important and even more critical for high risk projects involving underground works, such as Tunneling & Pneumatic Caissons. Based on the safety regulation of underground works, a back-up power supply system must be provided during the construction period at all times. Often, fluorescent lamps with re-chargeable batteries are provided for infrequent emergency cases, however these have a questionable useable life span and thus need careful maintenance and periodical replacement. In this paper we focused on using the phosphorescence materials to indicate the evacuation direction. As a result, it was confirmed that the phosphorescence materials were considered useful in reducing panic and facilitating a controlled evacuation in the event of a total black-out due to power failure.

  • PDF

The Actual State of Demolition and Pilot Dismantling in Apartment Building (해체공사의 수행실태 및 공동주택 분별해체 시험시공)

  • Kim, Hyo-Jin;Sohn, Jeong-Rak;Park, Seong-Sik;Yoon, Yung-Sang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.113-118
    • /
    • 2007
  • Now a performance process of Demolition works is 'Before-Removal & After-Classification' method in Korea. This method is short of demolition time, but construction wastes contained substances lower recycling rate of construction, raise expenses of reclamation & treatment. Then the government has decided upon a positive 'Before-Classification & After-Removal' method, and substantially raise a recycling rate of construction wastes. Therefore, this study makes an investigation into state of internal and external demolition field through evaluating technological level, we make a proposal of dismantling method from there. Also, we put dismantling to the test in an apartment by proposed work process. As the result, it made a term of works increased for removing interior material. To solve this problem, we need to develop tools and methods of construction that can remove efficiently. From now on, we continuously need to study a breakdown system of dismantling, analysis of dismantling process and general system by inspecting entire demolition process. And we have to study details for making a specific thesis of method of removing interior material which was based on developing a suitable partial demolition machine and dismantling works.

  • PDF

On the Blasting Accidents in Construction Works (한국의 건설재해(화약 사고를 중심으로))

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.11 no.4
    • /
    • pp.4-8
    • /
    • 1993
  • This paper was reported on the seminar of Korean-Japanese professional engineers. The first of all, it was described the comparative rifle between Korea, Japan & USA on fatal accident on the construction works. Next, it was described that some accidents was occured in typical reason and it will help us to prevent the future accident.

  • PDF

A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work (중대재해사례와 직업강도를 고려한 건축공사 위험성 평가)

  • Lee, Jong-Bin;Go, Seong-Seok;Jang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Deduction of the Primary Management Works for Reduction of the Environmental Loads at the Construction Phases (건축시공단계 환경부하 저감을 위한 우선 관리공종 도출)

  • Jo, Ahra;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.144-145
    • /
    • 2013
  • With the increasing public concerns on sustainability in construction industry around the world, a variety of standards for sustainable construction have been developed and implemented. However, most of the them focuses operation and maintenance phases and do not have been approached integrally in terms of all construction phases. Especially, considering the quantities of environmental loads occurred intensively at the construction phases, it should not be overlooked. Therefore, the purpose of this study is to deduct primary management works for reduction of the potential environmental loads at the construction phases. In order to assess them quantitatively, we conduct a survey from professionals who are in the relevant fields and analyze these data using Fuzzy-AHP.

  • PDF