• Title/Summary/Keyword: construction type

Search Result 5,307, Processing Time 0.031 seconds

Basic study for development of bottom-up infill module for high rise building (고층 건축물을 위한 bottom-up Infill module 개발 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.164-165
    • /
    • 2015
  • Modular construction technique is an adaptation of factory-based mass production concept in ordinary manufacturing industries to construction industry and it assumes that panels, units, etc. are fabricated in factories and assembled in construction sites. Given its structural limitations, modular construction technique is primarily used in low-story buildings whose maximum height is usually five stories, but researchers are actively studying possible adaptation of modular construction technique to high-rise building designs these days as in the case of infill-type modular construction design. Infill-type modular construction technique, most frequently used in high-rise building construction projects, completes frame construction first in reinforced concrete structures and fills unit modules in such structures. However, infill-type modular construction technique leads to longer construction schedule accompanying increase in construction cost, cost overrun due to additional of temporary work, and possible damage to units in the wake of facility construction. Accordingly, this study is performed as a basic study for the development of bottom-up infill-type modular construction technique intended to construct structural frames and fill in units sequentially in a bid to address such drawbacks of current infill-type modular construction technique.

  • PDF

Outdoor Weathering Test for used Construction Urethane Type Sealants (건축용 우레탄 실란트의 옥외폭로시험평가 방법 개발)

  • Lee, Sang Kook;Bae, Kee Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.69-70
    • /
    • 2017
  • In Korea, silicone type sealant is widely used for construction site. Before the silicone type, urethane type is one of the main type sealants. However, the weathering property is less than the silicone type, the urethane type is replace by the silicone one. Still the urethane type is used for the inside of the buildings for the perimeter of the window. The silicone type sealants are better in weathering property than those of the urethane type sealants. Except the weathering property urethane type sealant has its own advantage like movement property, low cost and so forth. There are many research results for the outdoor weathering of the sealants, but in Korea there are no results for the outdoor weathering for construction sealants. This research is focused on the outdoor weathering of the urethane sealants, how to measure the degradation, and compare the products which used in Korea. The outdoor weathering test is usually time consuming, thus we designed specialized device for accelerating the result.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

A Trend Analysis of Small Type House Construction Cost in Multi-Family Housing (공동주택 소형평형 공사비 트렌트 분석)

  • Park, Wonyoung;Cha, Yongwoon;Park, Taeil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.261-262
    • /
    • 2021
  • Increasing construction costs are required due to increasing the supply of small type houses with changes in multi-family housing trends. However, a sharp rise in the construction cost of small type houses can raise the sale price, threatening the stability of national housing. Therefore, this study aims to estimate the change in the construction cost of small type houses from the basic construction cost of the sale price ceiling system and suggest an improvement plan.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • v.16 no.2
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.

An Study on the Development of Waterproofing Execution Technology With high Temperature and Spray Equipments of Piston Type (피스톤 방식의 고온·고압 뿜칠장치를 이용한 방수 시공 기술 공법에 관한 연구)

  • Moon, You-Seok;Choi, Eun-Gyu;Choi, Sung-Min;Gwak, Gyu-Sung;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.7-12
    • /
    • 2008
  • We constructed Seal type waterproofing with adhesive and swelling properties in the field of construction work as yet. But we have many problems of seal type waterproofing with adhesive and swelling properties for construction. Because it has high viscosity, so wokers are too adhered for the work. So, we developed and applied about the high temperature and spray equipments of piston type better than before. We able to be expect that cost reduction and increase construction ability by high temperature and spray equipments of piston type.

  • PDF

An Evaluation on a calculation the increased cost of construction according to the Depth change of Concrete Slabs in Apartment Building by executing the law of floor impact sound (공동주택 슬래브 두께변화에 따른 공사비 증가 산정 평가 - 바닥충격음 법제화 시행에 따른 표준바닥구조를 중심으로 -)

  • Lee, Won-Yeul;Jeong, Sang-Min;Shin, Duck
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.2 s.16
    • /
    • pp.161-166
    • /
    • 2005
  • This study is to evaluate on the increased cost of construction according to the depth change of concrete slabs in apartment building. When we increased the depth of concrete slab from 150mm to 180, 210mm, the qualitative and cost of construction were calculated by the high-rise type, the unit-size type. As a result of this study, in 32 Pyong type, increment of construction cost rate appeared by $5.1\%$ in case of increase from slab 150mm to 180mm, and $10.0\%$ in case of increase from slab 150mm to 210mm. In 45 Pyong type, Increment of construction cost rate appeared by $5.7\%$ in case of increase from slab 150mm to 180mm, and $10.2\%$ in case of increase from slab 150mm to 210mm. In 55 Pyong type, Increment of construction cost rate appeared by $2.4\%$ in case of increase from slab 150mm to 180mm, and $8.9\%$ in case of increase from slab 150mm to 210mm.

An Analysis on Optimal Type and Core Technologies for Construction Automation System (건설 자동화 시스템의 적정 유형 및 핵심요소기술 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.140-141
    • /
    • 2016
  • Dynamic nature and diverse requirements on construction sites make the automation technology harder to be employed actively. In this study, we analyzed optimal type of automation system and importance of core technologies for developing efficient construction automation system on 11 construction operations. As a result, it showed that man-machine cooperation system may be the most suitable for most operations, while autonomous robot will be best suited in hard working environment such as maintenance of exterior wall. In elemental technology, ease and accuracy of control and operation showed higher priority than others regardless of automation system type. These findings will provide useful information for developing the construction automation system.

  • PDF