• Title/Summary/Keyword: construction time and costs

Search Result 383, Processing Time 0.038 seconds

Economic Analysis with Development of Rapid Setting Alumina-based Binder for Road Repair (알루미나계열 속경성 도로 보수재료 개발에 따른 경제성 분석)

  • Yang, Hee-Jun;Yang, Min-Jae;Hong, Sung-In;Ann, Ki-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.29 no.1
    • /
    • pp.3-10
    • /
    • 2017
  • In case of Korea highways, about 60% of highways are paved by concrete and more than 50% of them were repaired due to reduction in required performance such as damage in pave or joint and delamination of cover pavement. However, repairing old material in such structure generally costs a lot of money and induces difficulty in maintenance. Thus, enhanced material for ensuring economic efficiency should be developed. The present study designed concrete mixtures with 3 levels of replacement using OPC (0, 10, 20%) in calcium aluminate cement and to evaluate material performance for load pavement, experimental works for setting time, compressive strength and flexural strength were carried out on those materials. As a result, 20% replacement for OPC was determined as an optimized material in terms of required physical performance and its unit price. Moreover, to determine cost in load pavement economy analysis using a program (CA4PRS) was conducted with widely used paving materials. Result showed that application for 20% replacement for OPC was the most efficient in economical aspect, arising from 4.052 and 1.577 billion won for total construction and user cost, respectively.

Developmental disability Diagnosis Assessment Systems Implementation using Multimedia Authorizing Tool (멀티미디어 저작도구를 이용한 발달장애 진단.평가 시스템 구현연구)

  • Byun, Sang-Hea;Lee, Jae-Hyun
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.3 no.1
    • /
    • pp.57-72
    • /
    • 2008
  • Serve and do so that graft together specialists' view application field of computer and developmental disability diagnosis estimation data to construct developmental disability diagnosis estimation system in this Paper and constructed developmental disability diagnosis estimation system. Developmental disability diagnosis estimation must supply information of specification area that specialists are having continuously. Developmental disability diagnosis estimation specialist system need multimedia data processing that is specialized little more for developmental disability classification diagnosis and decision-making and is atomized for this. Characteristic of developmental disability diagnosis estimation system that study in this paper can supply quick feedback about result, and can reduce mistake on recording and calculation as well as can shorten examination's enforcement time, and background of training is efficient system fairly in terms of nonprofessional who is not many can use easily. But, as well as when multimedia information that is essential data of system construction for developmental disability diagnosis estimation is having various kinds attribute and a person must achieve description about all developmental disability diagnosis estimation informations, great amount of work done is accompanied, technology about equal data can become different according to management. Because of these problems, applied search technology of contents base (Content-based) that search connection information by contents of edit target data for developmental disability diagnosis estimation data processing multimedia data processing technical development. In the meantime, typical access way for conversation style data processing to support fast image search, after draw special quality of data by N-dimension vector, store to database regarding this as value of N dimension and used data structure of Tree techniques to use index structure that search relevant data based on this costs. But, these are not coincided correctly in purpose of developmental disability diagnosis estimation because is developed focusing in application field that use data of low dimension such as original space DataBase or geography information system. Therefore, studied save structure and index mechanism of new way that support fast search to search bulky good physician data.

  • PDF

Spatial View Materialization Technique by using R-Tree Reconstruction (R-tree 재구성 방법을 이용한 공간 뷰 실체화 기법)

  • Jeong, Bo-Heung;Bae, Hae-Yeong
    • The KIPS Transactions:PartD
    • /
    • v.8D no.4
    • /
    • pp.377-386
    • /
    • 2001
  • In spatial database system, spatial view is supported for efficient access method to spatial database and is managed by materialization and non-materialization technique. In non-materialization technique, repeated execution on the same query makes problems such as the bottle-neck effect of server-side and overloads on a network. In materialization technique, view maintenance technique is very difficult and maintenance cost is too high when the base table has been changed. In this paper, the SVMT (Spatial View Materialization Technique) is proposed by using R-tree re-construction. The SVMT is a technique which constructs a spatial index according to the distribution ratio of objects in spatial view. This ratio is computed by using a SVHR (Spatial View Height in R-tree) and SVOC (Spatial View Object Count). If the ratio is higher than the average, a spatial view is materialized and the R-tree index is re-used. In this case, the root node of this index is exchanged a node which has a MBR (Minimum Boundary Rectangle) value that can contains the whole region of spatial view at a minimum size. Otherwise, a spatial view is materialized and the R-tree is re-constructed. In this technique, the information of spatial view is managed by using a SVIT (Spatial View Information Table) and is stored on the record of this table. The proposed technique increases the speed of response time through fast query processing on a materialized view and eliminates additional costs occurred from repeatable query modification on the same query. With these advantages, it can greatly minimize the network overloads and the bottle-neck effect on the server.

  • PDF

A Study on the Optimal Span Width In the Bridge Main Span of Incheon 2nd Bridge (2) Economic Analysis on Port Operational Efficiency according to Traffic Schemes in the Bridge Main Span of Incheon 2nd Bridge (인천항 제2연륙교 주경간의 적정 교각폭 결정에 관한 연구 (2) 제2연륙교 주경간의 통항방식에 따른 항만운영효율의 경제성 분석)

  • Koo Ja-Yun;Kim Seok-Jae;Jang Eun-Kyu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.337-342
    • /
    • 2004
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, have been proposed by the private capital in 1999. But the optimal span width in the bridge main span have not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, me-way or two-way of vessels over 10,000G/T, in the bridge main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768..9 billion won.

  • PDF

A Study on the Optimal Width of the Main Span In the 2nd Bridge of lncheon (2) Economic Analysis on Port Operation according to Traffic Schemes in the Main Span (인천항 제2연륙교 적정 주경간 폭 결정에 관한 연구 (2) 주경간의 통항방식에 따른 항만운영의 경제성 분석)

  • Koo Ja-Yun;Kim Seok- Jae;Jang Eun- Kyu
    • Journal of Navigation and Port Research
    • /
    • v.29 no.1 s.97
    • /
    • pp.65-69
    • /
    • 2005
  • A construction project of Incheon 2nd bridge, which is connected between the Incheon Song-Do New Town and the Incheon International Airport in Young-Jong-Do, has been proposed by the private capital in 1999. But the optimal width of the main span has not been decided in spite of the three investigations into the feasibility of ship's safe transit in this planned bridge. In this paper, we study the economic analysis on port operational efficiency according to traffic schemes, one-way or two-way of vessels over 10,000G/T, in the main span of this bridge. In this comparative result, total queueing time due to the one-way in the bridge main span is evaluated 20,362 hours in 2011 and 24,544 hours in 2020. Therefore the demurrage cost and the accumulation cost of freight are evaluated 19.7 billion won in 2011, and 23.3 billion won in 2020, then total accumulated costs during 33 years from 2008 until 2040 are evaluated about 768.9 billion won.

An Empirical Study of Soundproof wall with Reduced Wind Load (풍하중 저감형 방음판의 실증 연구)

  • Choi, Jin-Gyu;Lee, Chan-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.272-278
    • /
    • 2018
  • Traffic volume has been greatly increasing due to urban development and the improvement of living standards, and many complaints are being raised due to the increasing road noise. As a countermeasure against these problems, highly soundproof walls are installed on the sides of roads. However, the ability to bear wind loads is a major design requirement for soundproof walls, which contributes to the exponential increases in construction costs and restricts the height of the walls. The aim of this study is to improve the performance of soundproof walls and to dramatically reduce wind loads while maintaining excellent price competitiveness. Based on Helmholz's resonator theory, a new concept is proposed for a ventilation-type soundproofing plate that can pass through a fluid like air and reduce noise. A full-scale metal soundproofing plate was produced to satisfy the quality standards of highways by conducting a sound-pressure transmission-loss test, wind tunnel test, and material quality test. To verify the reliability, the wall was manufactured and installed, and the sound insulation effect was examined by measuring the noise over time. In the future, ventilated soundproof walls on roads could create a pleasant living environment due to the high noise-insulation effect.

Comparative analysis of wavelet transform and machine learning approaches for noise reduction in water level data (웨이블릿 변환과 기계 학습 접근법을 이용한 수위 데이터의 노이즈 제거 비교 분석)

  • Hwang, Yukwan;Lim, Kyoung Jae;Kim, Jonggun;Shin, Minhwan;Park, Youn Shik;Shin, Yongchul;Ji, Bongjun
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.3
    • /
    • pp.209-223
    • /
    • 2024
  • In the context of the fourth industrial revolution, data-driven decision-making has increasingly become pivotal. However, the integrity of data analysis is compromised if data quality is not adequately ensured, potentially leading to biased interpretations. This is particularly critical for water level data, essential for water resource management, which often encounters quality issues such as missing values, spikes, and noise. This study addresses the challenge of noise-induced data quality deterioration, which complicates trend analysis and may produce anomalous outliers. To mitigate this issue, we propose a noise removal strategy employing Wavelet Transform, a technique renowned for its efficacy in signal processing and noise elimination. The advantage of Wavelet Transform lies in its operational efficiency - it reduces both time and costs as it obviates the need for acquiring the true values of collected data. This study conducted a comparative performance evaluation between our Wavelet Transform-based approach and the Denoising Autoencoder, a prominent machine learning method for noise reduction.. The findings demonstrate that the Coiflets wavelet function outperforms the Denoising Autoencoder across various metrics, including Mean Absolute Error (MAE), Mean Absolute Percentage Error (MAPE), and Mean Squared Error (MSE). The superiority of the Coiflets function suggests that selecting an appropriate wavelet function tailored to the specific application environment can effectively address data quality issues caused by noise. This study underscores the potential of Wavelet Transform as a robust tool for enhancing the quality of water level data, thereby contributing to the reliability of water resource management decisions.

Optimizing Total Transport Cost Incurred under Specific Port System: With a Case of Managing POSCO-owned Berths (특수항만구조하에서의 물류비용 최적화에 관한 연구 - 포항제철의 원료부두 사례를 중심으로 -)

  • Kim, Weon-Jae
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.3
    • /
    • pp.42-55
    • /
    • 2010
  • This paper primarily deals with a decision-making for determining the number of voyages in each ship size under a specific port structure in order to minimize the total transport cost consisting of transport cost at sea, queuing cost in port, and inventory cost in yard. As a result of computer simulation using queuing model characterized by inter-arrival time distribution, we were able to find out some combination of voyage numbers of 3 ship-size(50,000-ton, 100,000-ton, and 200,000-ton), where the total transport cost can be minimized under a specific port structure. The simulation model also allows us to figure out any trade-off relationship among sea transport cost, queuing cost in port, and inventory cost in yard. Put it differently, an attempt to reduce the sea transport cost by increasing the number of voyages of the largest ship size, the transport cost incurred in both port and yard is hypothesized to be increased and vice versa. Consequently, Port managers are required to adjust the number of annual number of voyages allocated in each ship size, put into the sea lines for importing raw materials, in order to optimize the transport costs incurred under the specific port system. We may consider a net present value(NPV) model for performing an economic feasibility analysis on port investment project. If a total discounted net benefit, including cost savings, exceeds the initial investment for an additional berth construction, then we accept the port investment project. Otherwise, we reject the proposed port investment plan.

Rewetting Strategies for the Drained Tropical Peatlands in Indonesia (인도네시아의 배수된 열대 이탄지에 대한 재습지화 전략)

  • Roh, Yujin;Kim, Seongjun;Han, Seung Hyun;Lee, Jongyeol;Son, Yowhan
    • Korean Journal of Environmental Biology
    • /
    • v.36 no.1
    • /
    • pp.33-42
    • /
    • 2018
  • The tropical peatlands have been deforested and converted to agricultural and plantation areas in Indonesia. To manage water levels and increase the overall productivity of crops, canals have been constructed in tropical peatlands. The canals destructed the structure of the tropical peatlands, and increased the subsidence and fire hazard risks in the region. The Indonesian government enacted regulations and a moratorium on tropical peatlands, in order to reduce degradation. A practical method under the regulations of rewetting tropical peatlands was to permit a canal blocking. In this study, four canal blocking projects were investigated regarding their planning, construction priority, design, building material, construction, monitoring, time and costs associated with the canal blockings. In the protected areas, regulations restricted the development of the tropical peatlands areas that were noted as deeper than 3 m, and the administration stopped issuing new concessions for future work projects for this noted criteria of land use. A noted purpose of canal blockings in these areas was to effectuate the restoration of the lands in the region. The main considerations of the restoration efforts were to maintain a durability of the blockings, and to encourage the participation of the area stakeholders. In the case of a concession area, regulations were set into place to restrict clear-cutting and shifting cultivation, and to maintain groundwater level in the tropical peatland. The most significant priorities identified in the canal blocking project were the efficiency and cost-effectiveness of the project. Nevertheless, the drainage of tropical peatlands has been continued. On the basis of a literature review on regulations and rewetting methods in tropical peatlands of Indonesia, we discussed the improvements of the regulations, and adequate canal blockings to serve the function to rewet the tropical peatlands in Indonesia. Our results would help establishing an adequate direction and recommended guideline on viable rewetting methods for the restoration of drained tropical peatlands in Southeast Asia.

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.