A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island - (사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 -)

  • Jo, Seong-Min;Cho, Sung-Hee;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

A Study on the Construction Cost Index for Calculating Conceptual Estimation : 1970-1999 (개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.5
    • /
    • pp.527-534
    • /
    • 2020
  • A significant factor in construction work is cost. At early- and advanced-stage design, costs should be calculated to derive realistic cost estimates according to unit price calculation. Based on these estimates, the economic feasibility of construction work is assessed, and whether to proceed is determined. Through the Korea Institute of Civil Engineering and Building Technology, the construction cost index has been calculated by indirect methods after both the producer price index and construction market labor have been reprocessed to easily adjust the price changes of construction costs in Korea, and the Institute has announced it since 2004. As of January 2000, however, the construction cost index was released, and this has a time constraint on the correction and use of past construction cost data to the present moment. Variables were calculated to compute a rough construction cost that utilized past construction costs through surveys of the producer price index and the construction market labor force consisting of the construction cost index. After significant independent variables among the many variables were selected through correlation analysis, the construction cost index from 1970 to 1999 was calculated and presented through multiple regression analysis. This study therefore has prominent significance in terms of proposing a method of calculating rough construction costs that utilize construction costs that pre-date the 2000s.

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

  • Rho, Hag Lae;Han, Seong Ho;Kim, Gang Seog
    • International Journal of Railway
    • /
    • v.5 no.3
    • /
    • pp.103-113
    • /
    • 2012
  • Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.

Evaluation Factors Influencing Construction Price Index in Fuzzy Uncertainty Environment

  • NGUYEN, Phong Thanh;HUYNH, Vy Dang Bich;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.2
    • /
    • pp.195-200
    • /
    • 2021
  • In recent years, Vietnam's economic growth rate has been attributed to the growth of many well-managed industries within Southeast Asia. Among them is the civil construction industry. Construction projects typically take a long time to complete and require a huge budget. Many socio-economic variables and factors affect total construction project costs due to market fluctuations. In recent years, crucial socioeconomic development indicators of construction reached a fairly high growth rate. Also, most infrastructure and construction projects have a high degree of complexity and uncertainty. This makes it challenging to predict the accurate project price. These challenges raise the need to recognize significant factors that influence the construction price index of civil buildings in Vietnam, both micro and macro. Therefore, this paper presents critical factors that affect the construction price index using the fuzzy extent analysis process in an uncertain environment. This proposed quantitative model is expected to reflect the uncertainty in the process of evaluating and ranking the influencing factors of the construction price index in Vietnam. The research results would also allow project stakeholders to be more informed of the factors affecting the construction price index in the context of Vietnam's civil construction industry. They also enable construction contractors to estimate project costs and bid rates better, enhancing their project and risk management performance.

Costs analysis of carcass burial site construction: Focused on the foot and mouth disease 2011, South Korea

  • Kim, Mi Hyung;Ko, Chang-Ryong;Kim, Geonha
    • Environmental Engineering Research
    • /
    • v.20 no.4
    • /
    • pp.356-362
    • /
    • 2015
  • Many burial sites were constructed in a short time to prevent the rapid spread of foot and mouth disease in infected livestock carcasses in Korea. More than 4,700 carcass burial sites were constructed in 2011. Approximately seven million poultry and 3.5 million livestock, including cattle and swine, were buried on farmland. Some burial sites were suspected of leachate leakage and were excavated and carcasses redisposed in a bioaugmentation process. This study performed interviews in order to understand the economic issues related to carcass burial and redisposal. The internal data from local government and the assumption data from online sites were analyzed to evaluate the costs; the focus was on burial site construction. The results showed that the local government paid $4.7 and $10.9 per carcass for traditional burial and redisposal. The comparable costs shown online were $4.5. This study found that the standard operating procedures should be carried out to reduce environmental impact and avoid additional costs. We estimated that the cost could be reduced by the advance preparations of materials against the emergency situations such as catastrophe of epidemics. In addition, the innovative technology for the stabilization of carcasses should be established through a future study.

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

A Study on Standardization of Supervision Cost by Investigating Supervision Workload in Cultural Heritage Repair Works (문화재수리공사의 감리업무량 조사를 통한 감리대가 기준 마련 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.32-42
    • /
    • 2013
  • The Korean Government introduced a cultural heritage supervision system in January 2010 to control quality and to prevent poor construction. However, cultural heritage related constructions that require supervision, a scope of supervision, supervision cost and placement of supervisors have not been standardized yet. For this reason, standards of supervision for repair works of cultural heritage that reflect the characteristics of small-scale repair works and restoration of cultural heritage are required. Accordingly, this study has suggested standards of supervision works and cost by analyzing the average construction period that is suitable for the characteristics of cultural heritage repair works. In other words, this study has suggested standards of full-time supervision costs by applying the fixed amount-added method (adding direct labor cost, direct expenses, overhead expenses, engineering fee, charges for additional works and VAT) which is the same as the method of calculating supervision costs for public construction projects because a supervisor has to work full time at a construction site to perform supervision if the project is a mid/large-scale cultural heritage repair work. Also, this study has suggested standards of part-time supervision costs for a small-scale cultural heritage repair work and the ways of supervising the construction projects by visiting the project site on important occasions. According to the result of the analysis by applying the forgoing standards of supervision costs for cultural heritage, a full-time supervision cost for cultural heritage repair works is approximately 98% compared to the construction supervision of a public construction project, and a part-time supervision is approximately 158% compared to architectural construction supervision. It is expected that the valuable cultural heritage of Korea will be preserved by controlling quality of cultural heritage repair works through the application of this study result - the standards of supervision costs for cultural heritage repair works - to an actual project.

Economic Analysis of Plant Utilities Under Environment Factor (환경요소를 고려한 발전설비의 경제성 평가)

  • 정석재;김경섭;박진원
    • Journal of the Korea Society for Simulation
    • /
    • v.13 no.2
    • /
    • pp.35-43
    • /
    • 2004
  • The purpose of this study is an economic analysis of power plant utilities by comparing electricity generating cost including environmental costs. Considering the enormous role of electricity in the national economy, it is very important to study the effect of environmental regulation on the electricity sector. Because power utilities need for large investment during construction, operation and maintenance, and also require much construction lead time. Economic analysis is the important process in the electric system expansion planning. This paper compares the costs of electricity generation including environmental costs between a coal-fired power plant and an LNG combined cycle power plants. With the simulation, this study surveys the sensitivity of fuel prices, interest rate and carbon tax. In each case, this sensitivity can help to decide which utility is economically better in environmental regulation circumstance.

  • PDF

Quality Management of Exposed Concrete at Construction Phase (시공단계 노출 콘크리트 품질관리 방안)

  • Kim, Tae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.164-165
    • /
    • 2016
  • To express the original texture of the concrete, exposed concrete finishing technique has been applied in many buildings. However, it is likely to cause quality problems after construction is completed. In addition, because of costs and time issues, reconstruction and maintenance works are difficult and ineffective. Therefore, step-by-step proactive quality management based on sufficient consensus among participants(client, designer, contractor) is very importatnt. This study analyzed factors causing low quality exposed concrete and quality contol points applied to 'A' headquarter construction project.

  • PDF

Maintenance Case and Cost Analysis for University Facilities (대학시설물의 유지보수 건수 및 비용 분석)

  • Shin, Myeoung-Ha;Lee, Chan Sik
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.23 no.6
    • /
    • pp.27-34
    • /
    • 2016
  • Although the scale and number of university facilities have increased, the maintenance of these facilities has not been efficient as maintenance costs incurred during facility operation periods, as well as management time, have not been sufficiently considered. In this study, the maintenance record data of national universities was compared and analyzed to analyze factors that incur maintenance costs according to the uses and costs of the facilities. According to the results, the number of cases of maintenance and repair work for basic educational facilities was shown to be the largest, accounting for 79%. The number of maintenance and repair work occurred according to work type was examined. According to the results, the highest ratio of maintenance and repair work occurred in the field of construction, specifically, the maintenance costs required for facility supplementation accounted for the highest ratio. Maintenance costs per unit area decreased over time in the newer university facilities, while showing a tendency to increase in older university facilities. However, there were cases where maintenance costs did not show any trends due to factors such as the limited maintenance budgets owing to the characteristics of public service facilities and facilities in the stage of deterioration or destruction after the stage of stabilization. This study is considered to be helpful for efficient university facility maintenance plans and budget calculations.