• Title/Summary/Keyword: construction time and costs

Search Result 383, Processing Time 0.025 seconds

Review of Heap leaching Technologies (더미 침출에 대한 소고)

  • 정승재;조종상;이재장
    • Resources Recycling
    • /
    • v.7 no.5
    • /
    • pp.3-12
    • /
    • 1998
  • The most recent research in precious metal processing is found in the increasing use of heap leaching for the extraction of gold from low grade ores and tailing dumps because heap leaching has several advantages compared to traditional milling. They include simplicity, lower capital and operating costs, faster starter-up time and environmental safety. In this paper, an attempt has been made to provide an overview of important factors involved in the implementation of heap leaching technology as a vehicle for gold extraction from its low grade ores. Brief discussions of the various important elements to this process has been made to ascertain the heap leaching characteristics, such as heap leaching chemistry, natural factors, ore preparation, heap and pad construction, solution collection system, pond system, metal extraction, and economical consideration.

A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project (화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구)

  • Kim, Yoon;Lee, Dong-Eon;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.6 no.2
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

Extracting Seismic Reinforcement Priorities to Promote Safety at Airmen Dormitories Using DEA (DEA 기법을 이용한 공군 병영생활관 내진보강 우선순위 도출)

  • Park, Keunwoo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.5
    • /
    • pp.697-704
    • /
    • 2019
  • The public has grown more anxious towards domestic earthquakes that have been taking place since 2000, and regulations on seismic design has been strengthened. Out of 4,605 Air Force installations that require the application of seismic design, 2,982 remain unapplied. By taking budget issues and the time spent to implement seismic retrofit into account, this paper aims to list up seismic reinforcement priorities for airmen dormitories where they can potentially be most vulnerable to earthquakes. The priorities are extracted based on Data Envelope Analysis(DEA). To apply DEA, two sets of variables are set: seismic reinforcement costs as input variable: age of building, number of residents, and seismic load as output variables. At the end, suggestions are made for developing seismic reinforcement plans that can be applied to all Air Force installations.

Development of Monitoring System for Interconnection of Distributed Generation with Power Grid (분산전원 계통 연계를 위한 모니터링 시스템의 개발)

  • Oh, Sung-Nam;Son, Young-Ik;Kim, Kab-Il
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.714-716
    • /
    • 2004
  • Owing to the environmental problems as well as increasing energy prices and power plant construction costs, many researches have been made for the safe operation of distributed generations. In order to be more popularly used in parallel with the distribution network, the distributed generation and its correlation with the power system should be exactly monitored at any time. This paper presents a monitoring system which displays the important states of the distributed generation in operation and stores various measurements of the system. The proposed system constructs a data-base for developing algorithms against any faults of the interconnected system, and monitors efficiently at any place with the communication network function.

  • PDF

Selecting optimized concrete structure by Analytic Hierarchy Process (AHP)

  • Ebrahimi, Morteza;Hedayat, Amir Ahmad;Fakhrabadi, Hamed
    • Computers and Concrete
    • /
    • v.22 no.3
    • /
    • pp.327-336
    • /
    • 2018
  • Increase in population and its daily increasing in our today society results in an increase in housing demand while traditional methods are not applicable. The project preparation and realization processes, based on theoretical and empirical studies, a creation of goods, services, and technologies, are the most important human activities. Selection of effective technological systems in construction is a complex multi-criteria decision-making task. Many decision-makers refuse innovations once faced with similar difficulties. Therefore, using modern materials and methods in this industry is necessary. Modern methods increase quality and construction speed in addition to decrease energy consumption and costs. One of the problems in the way of any project is selecting construction system compatible with the project needs and characteristics. In the present research, different concrete structures such as common reinforced concrete (RC) structure, prefabricated, Insulating Concrete Formwork (ICF), 3D Panel and Tunnel Concrete Formwork (TCF) for buildings with limited floors in Iran are studied and compared from the viewpoint of different criteria like cost, time, applicability and technical characteristics with industrialization approach. Therefore, some questionnaires filled out by construction industry experts in order to compare criteria and sub-criteria in addition to evaluation of optimized structural systems. Then, results of the questionnaires ranked by Analytic Hierarchy Process (AHP) and the most effective alternative selected. The AHP results show that 3D Panel system 36.5%, ICF 21.7%, TCF 19.03%, prefabricated system 13.3% and common RC system 9.3% are the most and the least efficient systems respectively.

On-site Inventory Management Plan for Construction Materials Considering Activity Float Time and Size of a Stock Yard (공정별 여유시간과 야적장 규모를 고려한 건설자재의 현장 재고관리 방안 연구)

  • Kim, Yong Hwan;Yoon, Hyeong Seok;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.79-89
    • /
    • 2023
  • The inventory of many materials requires a large storage space, and the longer the storage period, the higher the potential maintenance cost. When materials are stored on a construction site, there are also concerns about safety due to the reduction of room for movement and working. On the other hand, construction sites that do not store materials have insufficient inventory, making it difficult to respond to demands such as sudden design changes. Ordering materials is then subject to delays and extra costs. Although securing an appropriate amount of inventory is important, in many cases, material management on a construction site depends on the experience of the site manager, so a reasonable material inventory management plan that reflects the construction conditions of a site is required. This study proposes an economical material management method by reflecting variables such as the status of the preceding and following activities, site size, material delivery cost, timing of an order, and quantity of orders. To this end, we set the appropriate inventory amount while adjusting related activities in the activity network, using float time for each activity, the size of the yard, and the order quantity as the main variables, and applied a genetic algorithm to this process to suggest the optimal order timing and order quantity. The material delivery cost derived from the results is set as a fitness index and the efficiency of inventory management was verified through a case application.

A Study on the Agreement a rate Encouraging Restriction Primary factor Multi-family Housing Remodling (공동주택 리모델링사업의 동의율 확보 제약요인에 관한 연구)

  • Kim, Dong-Jae;Kim, Gab-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.885-890
    • /
    • 2008
  • Until now, the domestic construction market has been formed focusing on new construction and reconstruction in the apartment industry. Recently, however, the remodeling market for old structures have shown a tendency towards land shortage and land price increases in the major cities: the reinforcement of regulations regarding reconstruction; expenditure reduction and the solving of environmental problems by regarding old structures is pursuing low costs and maximum efficiency. The interest in remodeling is increasing, however, remodeling has not been successfully initiated in the apartment division for a reasonable period of time. Consequently to acquire mutual agreement for remodeling from the residential occupants. In order to evaluate profitability, it is necessary to set priorities and reasonable criteria for remodelling and to this end, it is also required to assess each fact of remodelling in view of both customers and supplied. Thus, a sample apartment housing complex was analyzed for geographic location, surrounding environment floor area ratio, site area, number of households, number of stories and unit area and thereupon, its remodelling profitability was analyzed to select an effective remodeling method as an alternative case for apartment house owners and remodelling.

  • PDF

Linking LOD and MEP Items towards an Automated LOD Elaboration of MEP Design

  • Shin, Minso;Park, SeongHun;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.768-775
    • /
    • 2022
  • Current MEP designs are mostly applied by 2D-based design methods and tend to focus on simple modeling or geometry information expression such as converting 2D-written drawings into 3D modeling without taking advantage of the strength of BIM application. To increase the demand for BIM-based MEP design, geometric information, and property information of each member of the 3D model must be conveniently linked from the phase of the Design Development (DD) to the phase of Construction Document (CD). To conveniently implement a detailed model at each phase, the detailed level of each member of the 3D model must be specific, and an automatic generation of objects at each phase and automatic detailing module for each LOD are required. However, South Korea's guidelines have comprehensive standards for the degree of MEP modeling details for each design phase, and the application of each design phase is ambiguous. Furthermore, in practice, detailed levels of each phase are input manually. Therefore, this paper summarized the detailed standards of MEP modeling for each design phase through interviews with MEP design companies and related literature research. In addition, items that enable auto-detailing with DYNAMO were selected using the checklist for each design phase, and the types of detailed methods were presented. Auto-detailing items considering the detailed level of each phase were classified by members. If a DYNAMO algorithm is produced that automates selected auto-detailing items in this paper, the time and costs required for modeling construction will be reduced, and the demand for MEP design will increase.

  • PDF

Analysis of re-bar manufacturing system in plant and its facilitate method (철근공사의 공장가공 현황분석과 활성화 방안)

  • Cho, Hun-Hee;Kang, Tai-Kyung;Park, Hyun-Yong;Yun, Seok-Heon;Hur, Young-Ki;Park, U-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.57-65
    • /
    • 2007
  • Rebar work is a labor intensive operation, and with labor shortage and high-wage era, the cost is rising, so re-bar manufacturing system in plant is adapted. However there remains a lot of problems. Although manufacturing system in plant, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work in plant and to find methods of betterment, a survey was conducted to factory engineers in 18 companies.

Analysis for the Applicability of Automated Quantity Take-off Technique Using BIM Authoring Tools on Road Construction (BIM 저작도구를 활용한 도로공사 수량산출 자동화 활용성 분석)

  • Moon, Jin-Seok;Sun, Ji-Won;Choi, Won-Sik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5184-5191
    • /
    • 2013
  • The automated quantity take off technique using BIM authoring tools has been recently issued, and the studies of this method for the accuracy, efficiency, and the unit computing for the simple volume, area and number have been developed. Meanwhile the main concerns such as the details for the level of modelling, and the costs and time for the calculating BOQ item are still required to study. In this paper, the earth works, drainage works, pavement works, and facility works using BIM authoring tools are designed in 3D, and the applicability of automated quantity take off technique using BIM authoring tools is discussed, respectively. As a result, automated quantity take off are limited in the earth works, drainage works, pavement works, and facility works. But Most items of BOQ can be supported in Re-bar model.