• Title/Summary/Keyword: construction technology and environment

Search Result 1,897, Processing Time 0.027 seconds

Variation of Filamentous Periphyton Chlorophyll-a in accordance with Water Velocity and Specific Surface Area of Media in Small Urban Stream (도시 소하천에서 유속, 비표면적에 따른 사상형 부착조류의 Chlorophyll-a 변화)

  • Ahn, Chang Hyuk;Joo, Jin Chul;Lee, Saeromi;Oh, Ju Hyun;Ahn, Hosang;Song, Ho Myeon
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.551-558
    • /
    • 2013
  • The feasibility of water supply as in-stream flow for Mangwall stream was analyzed in terms of water quality and cultivation periphyton using two different types of water resources (e.g., surface water and bank filtration from Han River basin) and three different types of media (e.g., tile, concrete and pebble). The concentrations of organic and inorganic contaminants from the bank filtration were lower than those from surface water by 17.5 - 55.0%. Using water samples collected from Mangwall stream, surface water, and bank filtration, chlorophyll-a, phaeopigment, and growth rate of periphyton were investigated. During 30 day incubation for each water sample, it was observed that filamentous cyanobacteria, Oscillatoriaceae, accounted for 98%, and water velocity of 5 cm/s was optimum for the in situ filamentous cyanobacteria growth. Also, it was deducted for water velocity and chl-a to have an inverse correlation. Meanwhile, the greater the specific surface area of media, the higher the concentration of chl-a. From these results, both water velocity and specific surface area of media should be considered as an combined parameter to deter the growth of filamentous cyanobacteria.

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.

A study on the construction technology for major building material to reduce indoor air pollution (실내오염물질방출저감을 위한 주요건축자재의 시공기술에 관한 연구)

  • Heo, Jung-Yong;Choi, Chang-Ho;Ann, Hyung-June;Lee, Yun-Gyu
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.143-148
    • /
    • 2007
  • Recently indoor air pollution caused by exposing hazardous chemicals (VOCs, formaldehyde) due to undiscriminated use of new construction materials and air-tightness to save energy is becoming a big issue. We have developed technologies to estimate the amounts of contaminants from constructions materials and method. We have further developed construction technologies to reduce and characterize these contaminants. The developed technologies were then refined to eliminate defects through considering field applicability.

  • PDF

A Relationship of Managing Impacts of FOREX Fluctuations and Organizational Capabilities in Construction Business

  • Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.477-480
    • /
    • 2015
  • Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.

  • PDF

A Case Study on Cut Slope Failure due to the Geomorphological Factor (지형요인에 의한 절토사면 붕괴사례)

  • Kim, Seung-Hyun;Choi, Ji-Yong;Rhee, Jong-Hyun;Lee, Jung-Yup;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1161-1170
    • /
    • 2009
  • The Roads in Gangwon Province generally was made on purpose to use the military road. In case of these roads, tremendous dangerous cut slopes do exist and its road linear shape was badly designed. In order to make up for this situation, the government has continuously established the new road or performed the public works such as the straight line of the curved road. Soksil 2 cut slope was made through the road improvement work. This has small surface failures and collapses. In spite of dry season, this slope are leaking lots of groundwater at the unbelievable point. So as to get curious phenomenon right, we performed a detailed field investigation, the geomorphological analysis, the stability analysis considering field characteristic and ultimately proposed the countermeasure to make sure stability of Sokil 2 cut slope.

  • PDF

Mobility of Cd and Pb in a Closed Mine Area

  • So Hyung-Suk;Kim Hee-Joung;Lee Mi-Kyung;Shin Hyun-Chul;Yoo Yeong-Seok;Schaeffer Andreas
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2005.10a
    • /
    • pp.101-102
    • /
    • 2005
  • PDF

Characteristics of Road Runoff depending on the Rainfall Intensity (강우강도에 따른 노면유출수의 유출 특성)

  • Kim, Seog-Ku;Kim, Young-Im;Yun, Sang-Leen;Lee, Yong-Jae;Kim, Ree-Ho;Kim, Jong-Oh
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.5
    • /
    • pp.494-499
    • /
    • 2004
  • Growth in population and urbanization has progressively increased the loadings of pollutants from non-point sources as well as point sources. Therefore, it is necessary to manage both point and non-point sources contaminations for protecting water environment and improving water quality. This study investigated the characteristics of pollutant release over a wide range of rainfall intensities as a requisite to control road runoff that accounts for the largest portion of non-point source contamination in urban areas. Samples of runoff rainwater collected from real road surfaces were analyzed for physicochemical parameters such as pH, suspended solids, and heavy metals. A experimental model road ($30cm{\times}30cm$) was also used to evaluate wash-off properties of pollutants deposited on the surface as functions of time and rainfall intensity. Analysis of runoff samples on rain events showed that the pollutant wash-off patterns for heavy metal and suspended solids were similar. This implies that the particles in rainwater adsorb heavy metals. Experiments using the model road made of impervious asphalt demonstrate a strong first flush phenomenon. At high rainfall intensity, approximately 80% of total pollutants were released within 15 min. The pollutant wash-off rates rapidly increase from 9 mm/hr to 12 mm/hr of rainfall intensity and decrease over 12 mm/hr of rainfall intensity.

The Third Construction Technology Development Master Plan (제3차 건설기술진흥기본계획)

  • Ji Sang-Wuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-206
    • /
    • 2002
  • $\lceil$The Construction Technology Development Master Plan$\rfloor$ aimed to promote construction technology R&D and to use its result efficiently is a legal plan based on Construction Technology and Management Law and established every five years. Now $\lceil$The 3th Construction Technology Development Master Plan(The 3th Master Plan)$\rfloor$ is establishing by MOCT(Ministry of Construction & Transportation) because the 2th Master Plan is completed at 2002. The 3th Master Plan suggests 'Establishment of construction environment leading the world-wide construction market' as a long-term vision, and also presents basic targets ; 'Improvement of competitiveness through conducting construction project efficiently', 'Transform into technology-oriented industry'. It consists of 7 fields and 25 main subjects. The 7 fields are construction manpower, production system, environment, safety, construction information, construction engineering, construction R&D.

  • PDF

Residual Life Assessment on Cast Iron Pipes of Water Distribution System (상수도관로중 주철관종의 잔존수명 평가에 관한 연구)

  • Lee, Hyun-Dong;Bae, Chul-Ho;Hong, Seong-Ho;Hwang, Jae-Woon;Kwak, Phill-Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.20 no.3
    • /
    • pp.206-214
    • /
    • 2004
  • Residual wall thicknesses, corrosion rates, and residual life of thirty four samples of cast iron pipes(CIPs) and ductile cast iron pipes(DCIPs) collected from water mains of B city were studied to estimate their remaining service life or optimum time of rehabilitation. The internal maximum corrosion depths of samples measured using a dial gauge after shot blasting were twice higher than the external in most cases. Therefore corrosion of water pipes was much more affected by internal water quality than soil. Residual wall thicknesses of DCIPs were higher than those of CIPs. That reason was thought to be that DCIPs have been protected from internal corrosion by lining cement mortar. Residual life calculated by maximum corrosion rate was ranged up to 44 years with 12.40 years average. Since most CIPs were much deteriorated, rehabilitation plan should be established soon in B city. Residual life of DCIP was 33.52 years average. When cement mortar lining is used up by neutralization of DCIPs. DCIP also should be rehabilitated.

THE CHECKLIST FOR ENVIRONMENTAL-FRIENDLY CONSTRUCTION PROJECT MANAGEMENT IN CONSTRUCTION PHASE

  • Oh, Kyung-Taek;Jung, In-Su;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1522-1527
    • /
    • 2009
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment conservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. The purpose of this study is to propose checklist for environment management can be used in construction phase. For this, we went ahead with the research by studying the existing research related to environment-friendly construction project management both at home and abroad, investigation and analysis of environment-related laws and ordinances, and drawing the checklists for natural environment and living environment at the construction phase. As a result, we were able to compile a checklist for nine items including geological features, animals and plants, use of soil, quality of air, water, and soil, construction wastes, noise, vibration, recreation, and sceneries. The checklist is structured in 4 grades and coded so as to allow it to be developed with the use of computer system in future. We hope that the checklist presented in this study will help lead the managers at the construction phase in construction development sustainable from the perspective of environmental conservation.

  • PDF