• Title/Summary/Keyword: construction safety assessment

Search Result 542, Processing Time 0.028 seconds

The Application of Safety Impact Assessment to Tunnel Construction (터널공사에서의 안전영향평가의 적용)

  • Kim, Byung-Sik;Choi, Bong-Joon;Seo, Jong-Won
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.545-548
    • /
    • 2008
  • In this study, the concept of safety impact assessment to achieve 'Design-for-Safety' in design phase is introduced. For this purpose, safety impact assessment model was devised and a methodology using the risk-based safety impact assessment approach for NATM of tunnel projects is suggested. The suggested methodology includes safety information survey, classification of safety impact factors caused by design and construction, and quantitative estimation of magnitude and frequency of safety impact factors. A real-world case study on the safety impact assessment of a tunnel construction project is also provided in the paper.

  • PDF

Using Immersive Augmented Reality to Assess the Effectiveness of Construction Safety Training

  • Kim, Kyungki;Alshair, Mohammed;Holtkamp, Brian;Yun, Chang;Khalafi, SeyedAmirhesam;Song, Lingguang;Suh, Min Jae
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.4
    • /
    • pp.16-33
    • /
    • 2019
  • The increasing size and complexity of modern construction projects demands mature capabilities of onsite personnel with regard to recognizing unsafe situations. Construction safety training is paper or computer-based and suffers from a distinct gap between the classroom training environment and real-world construction sites; even trained personnel can find it difficult to recognize many of the potential safety hazards at their jobsites even after receiving construction safety training. Immersive technologies can overcome the current limitations in construction safety training by reducing the gap between the classroom and a real construction environment. This research developed and tested a new Augmented Reality (AR)-based assessment tool to evaluate the hazard recognition skills of students majoring in construction management as part of a construction safety course. The quantitative and qualitative results of this research confirmed that AR-based assessment can become a very effective assessment tool to evaluate safety knowledge and skills in a construction safety course, outperforming both paper and computer-based assessment methods. The students preferred AR-based assessment because it provides a realistic visual context for real world safety hazards.

A Study on the Effectual Making Schemes of the Safety Assessment for the Construction Works (건설공사 유해,위험방지계획서의 효과적 작성방안에 관한 연구)

  • Choi, Jin-oo
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.4
    • /
    • pp.168-172
    • /
    • 2002
  • The Safety Assessment for Construction works is used in order to make the safety plans to protect calamities in construction sites. However in Korea it is problem that the Safety Assessment has strict and meaningless contents. So it is not used well. This study suggests the effectual making methods of the Safety Assessment to solve the problems which are found through investing serious calamities and interviewing experts.

A Basic Study on the Risk Assessment of Domestic Construction Companies (국내 건설업체의 위험성평가 실태조사 기초 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.240-241
    • /
    • 2019
  • Construction disasters have more distinctive characteristics than other industrial disasters. Since it is likely that construction disasters will spread to severe accidents, the accident mortality rate is very high compared to the disaster incidence rate. Therefore, the purpose of this study is to compare and analyze the operation status of construction risk assessment by domestic large and medium sized construction companies to prepare improvement direction of risk assessment system. The survey results for safety management experts of construction companies are as follows: Large companies have developed and utilized risk assessment systems in their respective companies, while small and medium construction companies have developed and evaluated risk factors through the Excel program. Rather than performing risk assessment tasks based on historical safety accident data, construction companies have limitations in developing risk factors and preparing solutions with suppliers for each major construction. Therefore, it is necessary to prepare a risk assessment system in the future by analyzing the types of safety accidents, such as the safety accident data of each company as well as the safety accident data.

  • PDF

Development of Safety Management Assessment Model for Construction Clients : (1) Assessment Elements (건설 발주기관의 안전경영 평가 모델 개발 : (1) 평가 항목)

  • Shin, Sung Woo
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.1
    • /
    • pp.82-89
    • /
    • 2017
  • The aim of this study is to develop elements for assessing safety management capability of construction clients. To this end, it is investigated theoretical concepts of the organizational safety management and successful construction management factors of construction clients. From which, the elements appropriate to assess the safety management capability of the construction clients are proposed. Questionnaire survey targeting construction safety management experts have been carried out to adjust the proposed model more eligible for field application. Finally, relative importance of each element is analyzed using analytic hierarchy process method. The developed model elements are expected to use effectively for assessment of the safety management capability of the clients.

Study on the development of Quantitative assessment indicator of safety culture for the construction site (건설현장 안전문화의 정량적 평가지표 개발에 관한 연구)

  • Jun, Heakyung;Kwon, Changhee
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.4
    • /
    • pp.403-411
    • /
    • 2016
  • The objectives of this study is to develop evaluation indicators for the quantitative evaluation of construction safety culture level in order to prevent accidents by evaluating the level of safety culture and each safety culture elements of the construction site and to present the areas that should be focused on improvements. In this study, it was presented assessment indicators of the construction safety culture by analyzing previous studies for safety culture, by categorizing items as an important element of safety culture hierarchically and by reflecting the opinion of the construction site professional personnels using AHP analysis methodology. The assessment indicators of the construction safety culture were structured the details of the leadership, systems, and personal characteristics and derived weighted value by the pairwise comparison to quantify the detail assessment indicators in order to assess the construction safety culture level. This study presents a safety culture assessment indicators for the construction site to suggest directions for improving the construction site safety culture and prevent the accidents of the construction site by derived via a safety culture assessment of construction site.

Examining the Improvement of the Risk Assessment System for the Safety Management of Military Construction Projects (군 건설공사 안전관리를 위한 위험성 평가 시스템 개선 방안)

  • Jung, Hyun-Sub;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.335-336
    • /
    • 2023
  • The military has adopted and implemented risk assessment since 2013 to reduce fatalities and accident rates at construction sites. However, risk assessment is carried out as a voluntary preventive activity and is maintained as a superficial administrative process for owners. Risk assessment must comply with the Occupational Safety and Health Act and the Enforcement Guideline of Risk Assessment. However, the scope of the assessment covers many industries, including manufacturing and distribution, making it difficult to apply to construction sites. As a result, the guidelines are interpreted and applied differently at each construction site. This study aims to improve the risk assessment system so that it is applicable to construction projects and proposes the improvement of the risk assessment system by analyzing the current status of serious accidents in military construction projects.

  • PDF

A study on the Research & Analysis of the Health and safety Managing's Understanding for practical Application of Construction Industry Risk Assessment - Focus on worker - (건설업 위험성평가 실무적 적용을 위한 안전보건 인식도 조사 연구 -근로자를 중심으로-)

  • Choe, Su-Hwan;O, Tae-Geun;Lee, Yeon-Su;Lee, Jin-Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.445-456
    • /
    • 2013
  • According to Department of labor guideline "2012-104 (2012.9.26.)" This study is to suggest the basic information and the improvement for the application of risk assessment on a construction site by group interview & survey of construction worker who is the practice of the subject and then numerical analysis about awareness and action plan of Safety and health. The result of group interview and survey of construction worker, most of construction worker feel the danger during the work. Then construction worker analysis results that risk assessment helps to change & raise awareness of safety and reduce an industrial disaster. Easy Safety management activity such as TBM & safety education active will be necessary for safe worksite and then I suggest the TBT(tool box talk) active which combines TBM & safety education.

  • PDF

A Study on the Perception Level of Health and Safety among the Participants for Optimization of Risk Assessment in Construction Industry (건설업 위험성 평가 최적화를 위한 운영 주체간 안전보건 인식도 조사 연구)

  • Paek, Chung-Hyeun;Cho, Ur-Ryong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.23-32
    • /
    • 2015
  • Recently, the Ministry of Labour, published clause 2 of Article 41 (Risk Assessment) of the Act "Industrial Safety and Health" dated 12 June 2013 in connection with continuous increase of accidents at construction sites in order to prevent accidents in industrial safety and health in new construction in accordance with the risk assessment on construction projects are realized after March 13, 2014. In this paper, positive method of calculating risk discussed by performing research the awareness of general contractors and sub-contractors with presenting risky situation is considered. The purpose will be a positive method of calculating risk and would be a sufficient base and give a positive direction in the development of new systems currently working in the construction and risk assessment which consider the characteristics of sufficient risk assessment system for future research.

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.