Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
Journal of the Korean Society of Safety
/
v.35
no.3
/
pp.24-31
/
2020
The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.
International conference on construction engineering and project management
/
2005.10a
/
pp.596-605
/
2005
The cable dome, proposed by Geiger after developing Fuller's idea of tensegrity and improved by Levy, is a new type of large span space structures. In this paper, formulations of the initial forces distribution in members of two main systems of cable dome, which are Geiger dome and Levy dome, are presented. By analyzing the static performance of Levy dome and the variation of internal forces in members of the structure, four groups of design parameters in cable dome structure are represented in terms of: (1) the numbers of rings and the spaces between the rings; (2) the slopes of ridge cables; (3) the lengths of struts; (4) the initial force in one member of the structure.
Korean Journal of Construction Engineering and Management
/
v.19
no.6
/
pp.14-23
/
2018
In the domestic construction industry, large-scale housing construction projects are being carried out by construction companies with competitiveness in the domestic top 10, it is said that the competence of the construction engineer is a factor for the success of the project. In Korea, there is National Competency Standards (NCS) that systematize contents of knowledge, technology, and attitude required in order to perform job in industrial field as the importance of individual ability is systemized in the country. Therefore, in this study, defined the detail competence in construction administration works, and examined the level of competence and degree of impotance detailed competency of construction engineers using AHP analysis & ANOVA. As a result, it was found that the current capacity of the Engineers in the apartment construction work is insufficient compared to the level of the competence they think they have, and that they have different competencies depending on their work experience and job position. This means that if the career is accumulated, the capacity that is possessed naturally will be changed. Therefore, it will be necessary to improve the capacity of the construction engineers who have a short work experience and a low job level.
International conference on construction engineering and project management
/
2024.07a
/
pp.783-790
/
2024
As cities continue to evolve and expand, the importance of accurately modeling and simulating urban environments to predict and assess various risk scenarios has become increasingly recognized. Since city simulation can capture the intricate dynamics of urban life, the versatility of city simulation has been demonstrated in numerous case studies across diverse applications. Owing to this capacity, city simulation plays a critical role in the disaster risk management field, especially in accounting for the uncertainties in natural/man-made disasters. For example, in the event of an earthquake, having detailed information about an urban area is instrumental for evaluating stakeholder decisions and their impact on urban recovery strategies. Although numerous research efforts have been made to introduce city simulation techniques in disaster risk reduction, there is no clear guideline or comprehensive summary of their characteristics and features. Therefore, this study aims to provide a high-level overview of the latest research and advancements in urban simulation under different hazards. The study begins by examining the simulation techniques used in urban simulation, with a focus on their applicability in disaster scenarios. Subsequently, by analyzing various case studies, this research categorizes them based on their unique characteristics and key findings. The knowledge gained from this literature review will serve as a foundation for subsequent research on simulating the impacts of urban areas under various hazards.
Ha, Seung-Ryong;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Yun-Sik
Korean Journal of Construction Engineering and Management
/
v.12
no.4
/
pp.29-39
/
2011
In Korea, many mixed-used development projects(MXD) in mega project size are currently active. As these mega projects require long-term construction and execution and involve by different subjects in different fields, their completion breeds various problems, such as conflicts among project participants due to their complicated interest relationships and inaccuracy in predicting the economic performance of the projects due to inappropriate facility capacity planning. To solve these problems, it is essential to apply value engineering (VE) at the planning phase of the project, which can result in the best possible cost reduction and improvement of project performance. However, not many projects are actually implementing VE because of the lack of available information, as well as the limitations due to uncertainty in the early period of project execution. Therefore, this study aimed at proposing VE Team Building, Quality Model Performance Indexes, Space Model so as to resolve common mega project problems and overcome VE application limitations at planning stage. The result of this study is expected that the data can be utilized as basic data to apply VE at the planning phase of the large complex projects.
This study was carried out in order to understand the plan, design, constructing and actual condition of management of modernized horticultural facilities in Kyungpook Province which had been constructed from 1992 to 1995 funded by Government support. The aim of this study is to provide reference data for success of the forth project. It was performed by making up a question about driving of project and management condition of equipment after constructing. The results obtained from this study are as follows: 1. 73.5% of facilities horticulture farmhouse recognized that the prospect of greenhouse is bright, but 92.5% of the farmhouse also recognised that they need technical consultation on protected horticulture farming. Therefore, technical educations would must be enhanced about foundation of greenhouse and cultivation technique. 2. The holding times of explanatory meetings, cause of understanding to farmhouse, were one or two times in greenhouse construction, and 62.5% of the farmhouse expressed the insufficiency at the explanation and educational data. For this reason, it was judged that the construction contract had been delayed more than 5 months in 49.3% of the farmhouse after the decision of project budget. 3. In constructing after a contract, the rates of construction delay is 53.4% and defect occurrence is 41.1%. The biggest reasons of construction delay was insufficiency of worker and materials supply. Each percentage is 29.1%. And the reason of defect occurrence is badness of machinery equipment(62.9% ). 4. In management of greenhouse, a pipe-constructed plastic film greenhouse changes plastic film every one and three years because of sticking dust on plastic film. It was needed to about in cleaning technique of coverings. Because that used 3-5 years only half of the expected life span. 5. The order of broken rating in the subsidiary equipment is like this lollop ventilator (42.8%), a general control system(33.3%) especially, in the case of a general control system, the rate of all family can control is 52.7%. so, it is time to develop easy control equipment which every one could use as soon as possible. 6. When choose heat generator as decide capacity, the most priority is the mount of heat generator the percent is 45.5% heat generator and as decide model, the private purchase's percent is 77.3%. It is higher than a public bidding heat generator the percent is 22.7% heat generator when it compare with a public bidding. In the case of $CO_2$ generator, using rate is only 19.0%. The using rate is very low, so it needs education how to use depends on the way of the subsidiary equipment. 7. In the case of seedlings, it is asked to use factory-processed seedling effectively. because it's difficult to get security of labors(58.8%), hoped crops (55.9%) access same crops(29.4%) much more and changing of crops depends on market situation. that is the main reason the lack of knowhow.
Korean Journal of Construction Engineering and Management
/
v.8
no.5
/
pp.182-190
/
2007
The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.
Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.3-11
/
2013
The changes in construction business have impact on overall operation of construction companies. Poor business of construction companies following a s low industrial cycle could have broader implications and influences on the industry. Since a construction project involves various stakeholders including public organizations, financial institutions and households, a downturn in construction industry might lead to significant economic loss. In this regard, it is meaningful to examine the relationship between changes in construction business cycles and insolvency of construction companies. This study conducts an empirical analysis of the relationship between construction business cycles and how much they affect operation of construction companies. To this end, KMV model was used to estimate probability of bankruptcy, which represents business condition of a construction company. To examine construction business cycles, investment amount for different construction types-residential, non-residential, and construction work-was used as a variable. Based on the investment amount, VECM was applied and the analysis results suggested that construction companies should put priority on diversifying project portfolio. In addition, it was shown that once a construction company becomes unstable in business operation, it is hard to recover even when the market condition turns for the better. This suggests that, to improve business operation of a construction company, internal capacity-building is as important as the market condition and other external circumstances.
Korean Journal of Construction Engineering and Management
/
v.18
no.1
/
pp.65-73
/
2017
Today, the United States, Europe and other advanced organizations are utilizing the concept of competency-based HR management. Recently, many organizations in Korea are also managing workforces by introducing the concept of job competencies in personnel management. However, in spite of the current trend, domestic human resources management methods for construction managers continues to operate by asking about work experience, licensing, education level, etc. This is a seniority system and it functions separately from an assessment of practical job competencies for the business. Moreover, construction management work has been very fragmented in terms of expertise and capacity depending on the type of management work and project progress. Therefore, it is necessary to develop a competencies management system for each business segment to effectively manage job competencies that reflect the the characteristics of a construction manager' s work. As such, the aim of this study is to analyze human resources management methods pertaining to domestic construction managers and present challenges and limitations in current practices. In particular, factors affecting the job competencies of construction managers are analyzed statistically. The results of this study will be used as the basis for future research into development of a construction manager competency management system.
Khodabandelu, Ali;Park, JeeWoong;Choi, Jin Ouk;Sanei, Mahsa
International conference on construction engineering and project management
/
2022.06a
/
pp.563-570
/
2022
Industrialized and modular construction is a growing construction technique that can transfer a large portion of the construction process to off-site fabrication yards. This method of construction often involves the fabrication, pre-assembly, and transportation of massive and long volumetric modules. The module weight keeps increasing as the modules become more complete (with infill) to minimize the work at the site and, as higher productivity can be achieved at the fabrication shop. Thus, a volumetric module delivery gets more challenging and risky. Despite its importance, past research paid relatively insufficient attention to the problem related to the lifting of heavy modules. This can be a complex and time-consuming problem with multiple lifting for transportation-and-installation operations both in fabrication yard and jobsite, and require complex crane operations (sometimes, more than one crane) due to crane load capacity and load balance/stability. This study investigates this problem by focusing on the structural perspective of lifting such long volumetric modules through simulation studies. Various scenarios of lifting a weighty module from the top using four lifting cables attached to crane hooks (either a single crane or double crane) are simulated in SAP software. The simulations account for various factors pertaining to structural indices, e.g., bending stress and deflection, to identify a proper method of module lifting from a structural point of view. The method can identify differences in structural indices allowing identification of structural efficiency and safety levels during lifting, which further allows the selection of the number of cranes and location of lifting points.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.