A Case Analysis on the Time Management of the HwaSung Construction Project in Choseon Dynasty (조선시대 화성성역의 공정관리 사례분석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.139-145
    • /
    • 2008
  • The objective of this paper is to analyze the construction management capacity of Choseon Dynasty and suggest a new interpretation on the construction capacity of the time management by reviewing the time management case during a representative construction project, HwaSungk construction project implemented in the latter period of Choseon Dynasty around 200 years ago. which was described in HwaSungSungYoukEuGye. The analysis results of the time management capacity during the latter period of Choseon Dynasty depicted in the HwaSungSungYoukEuGye is summarized as follows: (1) It took 2 years and 6 months to complete the Hwasung construction project. However, all of the single buildings were constructed within 6 months, a relatively short period of time. Judging from the fact, it can be assumed that the construction techniques using wood of the time were very sophisticated. (2) When the HwaSung was constructed, it took a relatively short period of time to complete works from placing the foundation to erecting columns and to placing a crossbeam on the columns. Based on the fact, it can be also inferred that assembly processing techniques of the time were also sophisticated and the level of member processing and assembling techniques of the time was considerably good as well. (3) The HwaSung construction was continued throughout the year without any influence by weather conditions, which tells us that division of labor by work was performed, and it was possible to mobilize labor force for the construction project even during the busy farming seasons.

SUCCESS FACTORS FOR URBAN REGENERATION PROJECT

  • Hae-Rim Kwon;Seul-Ki Lee;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1515-1520
    • /
    • 2009
  • Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.

  • PDF

Critical Factors of Subcontractor Evaluation and Selection: A Case Study in Vietnam

  • VO, Khoa Dang;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;LE, Loan Phuc;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.3
    • /
    • pp.297-305
    • /
    • 2021
  • A contractor or a main contractor is a company with full capacity to construct all project's works for the owner. A subcontractor is an organization that works with the main contractor to execute and complete work packages for the project. Selecting an effective subcontractor will help the efficiency and success of any projects in the construction industry. Therefore, this study identified subcontractor evaluation factors in Vietnam by collecting questionnaire survey data from engineers and staffs in the construction industry project environment. An exploratory factor analysis (EFA) was then performed to identify the critical factors when evaluating and selecting the subcontractor in construction projects. Moreover, when considering the impact level in terms of the average value, the research results showed that the most critical concern was the subcontractor's reputation. Furthermore, the top five factors affecting the sub-contractor evaluation and selection are (i) reputation, (ii) price, (iii) construction techniques, (iv) ability to implement projects according to commitments, and (v) subcontractor competence (the team of workers, technician staff, engineers with full capacity according to regulations). These research results provide an overall perspective that will help main contractors develop suitable subcontractors' evaluation and selection factors in their projects in the construction industry.

WORKFORCE INFORMATION DATABASE AND RFID TECHNOLOGY TO TRACK AND MANAGE WORKFORCE INFORMATION

  • Yong-Woo Kim;Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1094-1099
    • /
    • 2009
  • Workforce information is important in production planning because production planning requires matching a production unit's capacity to loads of assignments. However, tracking and managing workforce information such as skills and accident history is not an easy job. This paper describes a prototype database system for a workforce database system that employs RFID technology. This system tracks daily workforce production capacity on sites. A pilot project is described to explore the benefits and possibility of using radio-frequency identification (RFID) to track and manage workforce information, and is followed by the results of a survey to identify benefits. In addition to the survey identifying the benefits of the database system, the paper also presents a list of challenges through a series of interviews.

  • PDF

Construction Projects Productivity in West African country of Benin: Case of Ground Earthworks

  • Akogbe, Romuald Kokou;Feng, Xin;Zhou, Jing
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.16-23
    • /
    • 2015
  • In this paper, a survey related to excavation construction activities among national and international construction companies was conducted to evaluate site productivity in construction industry. To analyze the respective productivity levels of each construction company, a benchmarking measures analysis that featured calculations of the performance ratio (PR) and performance management index (PMI) was performed. As a result of these analyses, it has been found that the work performed by local companies was marked by lower productivity and that of international companies was characterized by good productivity. Further analysis of construction workforce resources P% revealed that a construction company's productivity is largely dependent on production capacity and consumption resources, which means that the retention of skilled workers and utilization of high-quality resources yields the highest level of productivity. These results suggest that for a local construction company to be competitive in the construction work market, it must retrain skilled craftspeople, foremen, engineers, and project managers, and strengthen its building capability by leveraging new equipment and technologies.

A Study on the Competitiveness Evaluation of Korean, Chinese, and Japanese Construction Companies in Vietnam (베트남에 진출한 한국·중국·일본 건설기업의 경쟁력 평가 연구)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2021
  • The size of Vietnam's construction market has been on a steady rise recently, and foreign construction companies such as China and Japan have been expanding their presence. Therefore, this study examined the design capabilities, construction capabilities, and construction project management capabilities of Korean, Chinese, and Japanese construction companies operating in Vietnam and local construction companies operating in Vietnam. As a result, it was found that Japan, Korea, China, and Vietnam were competitive in order. In particular, Korea's competitiveness in high-rise buildings and plants has been shown to be highly competitive in Vietnam. Based on these results, the government proposed measures to strengthen the competitiveness of Korean construction companies in Vietnam.

A Study on the Analysis of the HwaSungSungYouk-EuGye in the Aspect of the Modern Construction Management -Focus on ChangAhn-Mun's Construction Work- (현대(現代) 건설관리개념(建設管理槪念)을 통한 "화성성역의궤(華城城役儀軌)"의 분석(分析)에 관한 연구(硏究))

  • Yi, Tae-Yeual;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.10 no.3 s.27
    • /
    • pp.61-76
    • /
    • 2001
  • The purpose of this study is not only to evaluate the capacity of construction management but also to understand the capacity of construction productivity by analysing various information, mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. It is true that previous researches have showed lots of limitation to study the HwaSungSungYouk-EuGye though it contained a plenty of construction data. The main reason would be the absence of study methods to analyze HwaSungSungYouk-EuGye systematically. That's why there have not been overall studies about the HwaSungSungYouk-EuGye. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may Involve a single person or many thousands. This study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

COST PERFORMANCE PREDICTION FOR INTERNATIONAL CONSTRUCTION PROJECTS USING MULTIPLE REGRESSION ANALYSIS AND STRUCTURAL EQUATION MODEL: A COMPARATIVE STUDY

  • D.Y. Kim;S.H. Han;H. Kim;H. Park
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.653-661
    • /
    • 2007
  • Overseas construction projects tend to be more complex than domestic projects, being exposed to more external risks, such as politics, economy, society, and culture, as well as more internal risks from the project itself. It is crucial to have an early understanding of the project condition, in order to be well prepared in various phases of the project. This study compares a structural equation model and multiple regression analysis, in their capacity to predict cost performance of international construction projects. The structural equation model shows a more accurate prediction of cost performance than does regression analysis, due to its intrinsic capability of considering various cost factors in a systematic way.

  • PDF

Perception Based Definition of Construction Quality in Pakistan

  • Awan, Muhammad Yousaf Sadiq;Awan, Dr Muhammad Maqbool Sadiq
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.24-34
    • /
    • 2015
  • The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.