• 제목/요약/키워드: construction practice

검색결과 1,074건 처리시간 0.028초

증강현실 기술을 통한 건설 현장에서의 공정 정보 활용도 제고 방안 (Augmented Reality Framework for Efficient Access to Schedule Information on Construction Sites)

  • 이용주;김진영;;박만우
    • 한국BIM학회 논문집
    • /
    • 제10권4호
    • /
    • pp.60-69
    • /
    • 2020
  • Allowing on-site workers to access information of the construction process can enable task control, data integration, material and resource control. However, in the current practice of the construction industry, the existing methods and scope is quite limited, leading to inefficient management during the construction process. In this research, by adopting cutting edge technologies such as Augmented Reality(AR), digital twins, deep learning and computer vision with wearable AR devices, the authors proposed an AR visualization framework made of virtual components to help on-site workers to obtain information of the construction process with ease of use. Also, this paper investigates wearable AR devices and object detection algorithms, which are critical factors in the proposed framework, to test their suitability.

CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

현장실태 조사를 통한 가로수전정 원가기준 마련 연구 (A Study on the Cost Criteria for Street Tree Pruning through Field Survey)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.210-211
    • /
    • 2022
  • Pruning is the most important work for the growth and aesthetics of street trees. It is also the most actively conducted maintenance work. However, the specifications, application methods, and cost criteria for pruning have not been systematically established. This has recently caused a lot of confusion in the practice of street tree pruning, such as indiscriminate pruning and lack of construction costs. Therefore, this study clarified the contents of work according to the form of pruning. It added 'aesthetic pruning,' which takes into account design. In addition, It revised equipment not in conformity with the law and excluded personnel necessary for on-site traffic control so that they could be reflected separately. As a result, this study is expected to contribute a lot to securing appropriate construction costs for maintaining street trees.

  • PDF

PROBABILISTIC MEASUREMENT OF RISK ASSOCIATED WITH INITIAL COST ESTIMATES

  • Seokyon Hwang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.488-493
    • /
    • 2013
  • Accurate initial cost estimates are essential to effective management of construction projects where many decisions are made in the course of project management by referencing the estimates. In practice, the initial estimates are frequently derived from historical actual cost data, for which standard distribution-based techniques are widely applied in the construction industry to account for risk associated with the estimates. This approach assumes the same probability distribution of estimate errors for any selected estimates. This assumption, however, is not always satisfied. In order to account for the probabilistic nature of estimate errors, an alternative method for measuring the risk associated with a selected initial estimate is developed by applying the Bayesian probability approach. An application example include demonstrates how the method is implemented. A hypothesis test is conducted to reveal the robustness of the Bayesian probability model. The method is envisioned to effectively complement cost estimating methods that are currently in use by providing benefits as follows: (1) it effectively accounts for the probabilistic nature of errors in estimates; (2) it is easy to implement by using historical estimates and actual costs that are readily available in most construction companies; and (3) it minimizes subjective judgment by using quantitative data only.

  • PDF

도로건설 현장에서의 드론 운용방안 (Drone Operation Plan at Road Construction Site)

  • 성상민;윤부열;송미화;조준상
    • 한국산업융합학회 논문집
    • /
    • 제23권5호
    • /
    • pp.709-716
    • /
    • 2020
  • Recently, the drone's equipment development and software technology have dramatically improved. With such developments, the applicability is increasing in various fields that require rapid geospatial information, and in practice, regulations and systems have been established, and the fields in use are increasing. Also, in Korea, corporations and public institutions are actually using and researching drones in fields such as aircraft development, communication technology development, construction site use, and surveying. However, there are no fields where drones are actually used in road construction sites. Therefore, in this study, to utilize drones that have been actively used in the civil engineering and construction fields for road construction, we investigated the current status of the Korea Highway Corporation's field drone use research and classified the possibility of drone introduction by road construction. Finally, a method of using drones at road construction sites was proposed to prepare a method for using drones at road construction sites.

Cambodian Construction Industry's Issues in the ASEAN Economic Community

  • MIN, Vuthea;Leungbootnak, Narong;Srinavin, Korb;Aksorn, Preenithi;Deewong, Watcharapong
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권1호
    • /
    • pp.1-10
    • /
    • 2016
  • Issues in the construction industry of Cambodia in ASEAN Economic Community (AEC) is the main priority to be identified before identifying causing factors in order to find out recommendations, to improve this sector, and to survive in this community. Two major issues were identified from the literature review and the investigation, namely i) Long-term vision and its policy, and ii) practice culture. The total sample collected from concerned government officers and engineers in Cambodia were 463. Factor analysis was then conducted to find out the issues, and as the results, there are five issues in two main groups: (i) the Organization's vision and its skill, which consist of a vision of the organization, knowledge and skill, and less investmen in the construction sector; (ii) Knowledge and motivation towards the AEC, which consist of knowledge about the AEC, and level to promote organization for the AEC.

REDUCTION OF SEDIMENT-LADEN WATER FROM CONSTRUCITON SITES INTO WATERWAYS:- A GOVERNMENT AND INDUSTRY APPROACH

  • Teo Ee Huat
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.285-291
    • /
    • 2009
  • Water is a strategic resource for Singapore due to its small land mass and more than half of the mainland serves as catchment for raw water, including construction sites. Construction site typically involves earthworks and in conjunction with the frequent and intense rainstorm in Singapore, produce runoff of high turbidity due to suspended sediments. The resulting high concentration of suspended sediment in construction site runoff very often leads to aesthetically unpleasant reservoirs and potentially increases the treatment cost of raw water. To mitigate this, the local standard requires the discharged concentration of total suspended solids of construction runoff leaving a construction site to be less than 50mg/l which is a very high standard. This paper will present, examine and discuss particular issues and practices of Singapore's construction industry in meeting this requirement. The focus will be on two areas: Government lead initiatives and industry practices. How the government agencies worked together with the industry professionals to develop a system to ensure meeting of the standard is discussed. In addition, the types of industry practices, including various Best Management Practice to reduce erosion in construction sites and implement effective sedimentation on construction sites are examined.

  • PDF

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF