• Title/Summary/Keyword: construction practice

Search Result 1,074, Processing Time 0.024 seconds

Critical Success Factors from POSCO Engineering & Construction Company's Knowledge Management Experiences (지식경영도입의 핵심성공요인 -포스코 건설사례를 통하여-)

  • Lee, Hong;You, TaekYoung
    • Knowledge Management Research
    • /
    • v.4 no.2
    • /
    • pp.95-105
    • /
    • 2003
  • The purpose of the current study is to explore what are critical success factors(CSFs) from Posco Engineering and Construction Company's knowledge management practice. From a deep case study of the company, five CSFs are delineated. The first factor is to clarify knowledge management vision and strategy so that people in the company clearly understand directions of where the company goes to implement knowledge management. The second one is to grip the whole picture of knowledge management realms. Narrow eyes for the knowledge management leads to failure. The third factor depends on how to acquire people's cooperation. The fourth one has something to do with a way of approach. Unilateral or delegated approach is fragile for the successful implementation of knowledge management. Shared approach raises the probability of success. The fifth one is to monitor implementation acts and processes.

  • PDF

The Green Mode of Parks and Green Space Construction -a Study on the Exemplary Type of Ecological Landscape-

  • Le Yang
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.32-38
    • /
    • 2004
  • As for the green space construction of the modern parks, landscape design is not only for the aesthetics but its also to promote the spiritual connotation. The appearing of the exemplary type of ecological landscape reflects landscape architects have developed realization and wishes to improve the deteriorating environment and put them into practice. This paper introduces the basic intension of the exemplary type of ecological landscape, and discusses the relative background and ecological aesthetic foundation of the exemplary ecological landscape which appeared under the crisis of urban environment; lists the modern landscape designers practices of the exemplary ecological landscape; studies the developing trend of this practice which becomes multifold along with the reformation of city.

  • PDF

Trend Analysis of LEED Certifications: Insights and Future

  • Lee, SeungMin;Kwak, Young Hoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1009-1016
    • /
    • 2022
  • As environmental concerns grow, people are becoming more aware of energy efficiency, carbon reduction, and sustainable development. Leadership in Energy and Environmental Design (LEED) certification is currently the most widely recognized building environment assessment method connected to energy and the environment worldwide. This study explores trends for six factors (energy and atmosphere, materials and resources, indoor environmental quality, sustainable sites, water efficiency, and innovation in design) to assess four levels of LEED certification (Platinum, gold, silver, and certified) using 11,209 LEED projects in the United States. The study analyzes trends using scores of percentages of maximum points by certification level, ownership type, space type, and climate zones. With the interest in the Environmental, Social, and Governance (ESG) principle on the rise, this study contributes to a better understanding of the trends and future of LEED certification in the built environment sector.

  • PDF

Incompetent Construction Technologies and Resources in the Construction Industry of Yemen

  • Sultan, Basil;Alaghbari, Wa'el
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.8-14
    • /
    • 2014
  • The Construction industry in Yemen confronts many development constraints, such as the inadequate implementation of appropriate building materials and labour construction technologies. Thus, this research looks over building materials and labour construction technologies used on the local housing construction projects by verifying the percentage of construction expenditure consumed by the main construction components (Materials, Labour and Overhead and Profit), along with the implemented construction technologies. The paper conducts a survey to acquire the cost distribution of the construction main components. The outcomes of the survey were discussed; the discussion was supported by literature on similar issues from some countries. The outcomes confirmed the relatively limited percentage in labour cost and profit, and the elevated percentage of construction materials cost, which are because of the excessive and inappropriate use of materials. What's more, established that the excessively redundant unskilled labours are not effectively engaged in the construction activities, this is due to the tendency of the market in using labour-base technologies. This paper is to recommend a suitable policies and strategies has to be used to decrease cost by using efficiently appropriate construction practice and local materials, moreover take advantage of excessive labour to reduce unemployment.

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

Construction Application of a Newly Developed Form-Latticed Prefabricated Steel Reinforced Concrete Column (Form-LPSRC 기둥 개발 및 적용 연구)

  • Baek, Hojin;Lee, Seung-Hwan;Kim, Sooyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.487-495
    • /
    • 2014
  • Shortening the construction duration of structural frame work is extremely important because the work accounts for a major percentage of all cost and duration in large projects. For this reason, new construction methods to reduce the duration of structural frame work are being continuously studied and developed. A PSRC composite column, which uses steel angles instead of H-beams, has the advantages of flexural strength and ductility. Moreover, with this PSRC technique, conventional work for reinforcing bars in columns in practice can be skipped. However, one limitation exists in which the form work is still required. This research proposes a Form-LPSRC column method that is prefabricated with the column frame that includes permanent forms attached. Feasibility was examined with mock-up specimens and finally, the technique applied to real practice. Compared to the conventional SRC column method, this study demonstrated that the proposed technique has many advantages in construction duration, cost, quality, safety and environment.

Analysis of Construction Company's Bidding Practice under the Lowest Bidding System (최저가낙찰제하에서의 건설업체의 투찰 형태 분석)

  • Lee, Hyungwoo;Chang, Chul-Ki;Kim, Yong-Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.975-983
    • /
    • 2006
  • This study analyzed bidding data for construction projects ordered by the Public Procurement Service under the lowest bidding system since 2001 by using statistical technique in terms of construction types, company sizes, bidding prices. This study brings out construction company's bidding practices and problems caused by the current lowest bidding system and suggests the way to mitigate the problems and to improve the lowest bidding system. The analysis shows the problem of winning a bid in abnormally low price under the lowest bidding system, feared at the start, was realized. As bidding practice has polarized with low and high price, the analysis shows that the lowest bid system's market has a high possibility to be distorted by construction companies' bid strategies. To complement the lowest bidding system's problem, the analysis shows that introduction of the bidding system using particulars where bidders estimate construction quantities and unit prices by themselves is needed.

BIM-based Lift Planning Workflow for On-site Assembly in Modular Construction Projects

  • Hu, Songbo;Fang, Yihai;Moehler, Robert
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.63-74
    • /
    • 2020
  • The assembly of modular construction requires a series of thoroughly-considered decisions for crane lifting including the crane model selection, crane location planning, and lift path planning. Traditionally, this decision-making process is empirical and time-consuming, requiring significant human inputs. Recently, research efforts have been dedicated to improving lift planning practices by leveraging cutting-edge technologies such as automated data acquisition, Building Information Modelling (BIM) and computational algorithms. It has been demonstrated that these technologies have advanced lift planning to some degree. However, the advancements tend to be fragmented and isolated. There are two hurdles prevented a systematic improvement of lift planning practices. First, the lack of formalized lift planning workflow, outlining the procedure and necessary information. Secondly, there is also an absence of a shared information environment, enabling storages, updates and the distribution of information to stakeholders in a timely manner. Thus, this paper aims to overcome the hurdles. The study starts with a literature review in combination with document analysis, enabling the initial workflow and information flow. These were contextualised through a series of interviews with Australian practitioners in the crane-related industry, and systematically analysed and schematically validated through an expert panel. Findings included formalized workflow and corresponding information exchanges in a traditional lift planning practice via a Business Process Model and Notation (BPMN). The traditional practice is thus reviewed to identify opportunities for further enhancements. Finally, a BIM-based lift planning workflow is proposed, which integrates the scattered technologies (e.g. BIM and computational algorithms) with the aim of supporting lift planning automation. The resulting framework is setting out procedures that need to be developed and the potential obstacles towards automated lift planning are identified.

  • PDF

Material and workmanship requirements for modern codes of practice

  • Banfi, M.J.A.;Cardwell, S.;Gedge, G.;Murgatroyd, E.C.
    • Steel and Composite Structures
    • /
    • v.5 no.2_3
    • /
    • pp.169-180
    • /
    • 2005
  • Current codes of practice do not exist in isolation, and rules that have been developed assume certain material properties and minimum workmanship in fabrication and erection. These are either in separate documents or different parts of the code. This paper explains the main requirements for materials and workmanship and how they can be related to design and construction in general. The use of very high strength steels is also considered and the measures that may be needed to allow their use with modern codes are also presented.

KOREAN CONSTRUCTION JOB MARKET FORECAST FOR CIVIL/ARCHITECTURAL ENGINEERS

  • Hwan Pyo Park;Myung Jin Chae;Minwoo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.952-955
    • /
    • 2005
  • In the early 90's, we had serious shortage of construction engineers in Korea. The shortage was acute especially in construction quality control and supervision area, which were gaining social attention due to the road bridge and the department store collapse that took the hundreds of lives in the early 90's in Seoul, Korea. In order to meet the high demand of construction engineers, the engineering license regulations were changed in 1995. Engineers who did not pass the written exam but have equivalent working experience are given engineering license to practice engineering legally. Since year 2000, while the severe engineer-shortage has been resolved, the opposite situation has occurred: there is serious over-supply of construction engineers. Policy makers and engineering practitioners are agreed to bring back the old-fashioned written exam engineer licensing system like before 1995, i.e., no more written exam exemption. However, the engineers who obtained license without taking written exam may not want to go back to old policy which would take their license. It is required to provide appropriate grace period before the new policy takes effect to minimize the impact of the changes. This paper forecasts the supply-demand of construction engineers providing the basis for the most appropriate policy changes.

  • PDF