Singapore's construction sector employs more than 450,000 workers. During the height of the COVID-19 pandemic in Singapore from April to June 2020, migrant workers were disproportionately affected, including many working in the construction sector. Shared accommodation and construction worksites emerged as nexuses for COVID-19 transmission. Official government resources, including COVID-19 epidemiological data, 43 advisories and 19 circulars by Singapore's Ministries of Health and Manpower, were reviewed over 8 month period from March to October 2020. From a peak COVID-19 incidence of 1,424.6/100,000 workers in May 2020, the incidence declined to 3.7/100,000 workers by October 2020. Multilevel safe management measures were implemented to enable the phased reopening of construction worksites from July 2020. Using the Swiss cheese risk management model, the authors described the various governmental, industry, supervisory and worker-specific interventions to prevent, detect and contain COVID-19 for safe resumption of work for the construction sector.
International conference on construction engineering and project management
/
2009.05a
/
pp.896-906
/
2009
In Singapore, the construction industry's performance in safety has often been the worst among the other industries. This paper seeks to compare the efforts of the shipbuilding and repair industry and the construction industry in improving the level of safety performance. One key factor identified in the paper will be the subcontractors' role in the safety aspect. Based on the analysis of statistic carried out by the Ministry of Manpower of Singapore and many others, this paper aims to identify the success of the shipbuilding and repair industry and gives thought as to how the construction industry can further improve its safety record.
Journal of the Korea Institute of Building Construction
/
v.8
no.5
/
pp.67-73
/
2008
Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment In a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it's imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.
International conference on construction engineering and project management
/
2009.05a
/
pp.1599-1607
/
2009
In order to deal with severe competition in the construction market of developing countries, large contractors must continually improve their own performance and operation. Performance measurement is the heart of ceaseless improvement in organizations. Key performance indicators (KPIs) play a key role in measuring project management performance (PMP) of large contractors in developing countries. The main objective of this paper is to identify KPIs, which can be used to measure PMP of contractors, and then analyze the underlying relationships of these KPIs in order to gain insight into PMP of large construction firms in Vietnam construction industry (VCI). Literature reviews and the pilot survey provided 30 KPIs. Fourteen KPIs, which have the mean values higher than 3.0, were considered as important KPIs through a questionnaire survey of 32 professionals. Factor analysis of these KPIs was employed to categorize them. The results of the survey revealed that top six KPIs are construction time and cost, owner satisfaction on services and products, and quality management and project team performance. Factor analysis uncovered that 14 top-ranked KPIs can be grouped under six categories, namely: (1) construction input management, (2) owner satisfaction, (3) cost and quality, (4) manpower management, (5) subcontractor performance and (6) equipment management. The findings of this research can be used as a guideline to measure PMP of contractors in Vietnam as well as in other developing countries. Since contractors from a country to the other country may have the same manner to manage construction projects, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in other developing countries.
Kim, Inchie;Chin, Sangyoon;Kim, Seongah;Kim, Yeasang;Lee, Sangjun;Park, Soohun
Korean Journal of Construction Engineering and Management
/
v.19
no.4
/
pp.3-11
/
2018
The Construction Workers Mutual Aid Association is carrying out a number of strategic tasks with the goal of "contributing to improving employment and stabilizing the return of workers to construction workers through employment welfare and retirement deduction services." One of them is the retirement deduction system. The retirement allowance system is a system for the retirement income and livelihood security of construction workers who are not adequately protected by the Labor Standards Act, such as retirement allowances due to the nature of day labor. The Construction Workers Mutual Aid Association has promoted the introduction of electronic manpower management. For the efficient management of the pilot sites and the plans for the future, comprehensive evaluation of the pilot sites as well as the evaluation of the status and operation results of each pilot project site are needed. Therefore, in this study, we will develop performance indicators to evaluate the current state of electronic manpower pilot projects and analyze the actual situation of pilot project sites through actual application, and try to derive future implementation strategies.
Korean Journal of Construction Engineering and Management
/
v.13
no.2
/
pp.147-155
/
2012
Recently, various construction projects are invested with plenty capital, manpower and resources. The advanced methods of the construction management is introduced to Korea. However, the cases which get involved in excessive cost frequently occur. We can explain it means that the cost management in the entire phases and the risk factors in its works has not been done yet as expected. Thus, it is necessary to unearth risk factors relative to cost management and analyse them for preventing cost-increasing and the success of projects. In this point of view, this study aims to identify the risk factors of the cost management focused on pre-construction stages from the perspective of construction management which is possible to take part in the whole phases and works in cost management. Also, the impact priority and grade of risk factors to cost-increasing are evaluated by using FMEA.
This study aims to derive key construction supervision work that can be digitalized among construction supervision work. The scope of the study includes domestic construction sites to which the Building Act of South Korea is applied. First, the construction supervision process was identified through extensive consultation of construction expert witnesses. Afterwards, the key construction supervision works for digitization were derived through survey results construction expert witnesses. Among the 24 supervision works throughout the pre-construction, construction, and post-construction stages, the proportion of supervision work manpower or cost, the type of data generated by supervision work and the urgency of introducing digital technology, and the impact on productivity and safety of supervision work were evaluated on a 5-point scale from "very low" to "very high" was investigated. The survey was conducted by t-test analysis, and as a result, it was possible to derive that the level of digitization was higher than average in "quality management," "safety management," and "collection and cooperation of maintenance instructions." It can be interpreted that digitization has been introduced on a pilot testing basis or has already been completed according to the needs of the site. On the other hand, it can be interpreted that the work that are obtained below the average score are considered to be realistically constrained at the construction site and that it is inevitable for the supervisor to proceed manually. Future studies include analyzing the quantitative impact of the key construction supervision work once digitalization is fully applied.
Proceedings of the Safety Management and Science Conference
/
2003.11a
/
pp.97-103
/
2003
In recent years, environments of business are changing due to epoch-making development of information technology and the advent of digital economy ages. It is an active confrontation as to the environments for information. Unlike the large scale enterprises in those days, hower, many small & medium enterprises especially the enterprises which are engaged in the manufacturing industry-aren't participate in information's rank due to the lack of funds, manpower, insufficient management environments, and manager or staff's lack of cognition as to information. So, this paper make a base of establishment for ISP through the establishment of ERP that is used to management activity for small & medium manufacturing enterprises. A way for small & medium enterprises' ERP construction is SMERP S/W for the small & medium enterprises' ERP package which is offered by the Korea chamber of commerce & industry. And, that is applied to the real management environment.
Noise and vibration problems at the construction site, expansion of construction scale and frequency of urban construction is increased, has given the damage to local residents. Also, the result of civil complaint about noise and vibration that occurred in 2011 was 56,244; it is showing an increasing trend of more than 4% annually. In particular, the construction noise and vibration, the civil complaints of around construction site accounts for 64.6%(36,353), are harmful to the tranquility of living environment. As a result, the government has managed to strengthen the regulatory standard of construction noise (65dB(A), Day-time) from 2011. However, the regulatory standard of construction noise and vibration does not meet and also complaints related the construction noise and vibration not decreased. Because the management system can be applied to the construction site is insufficient and a shortage of manpower. In this study, investigated the status and problems of the regulatory standards related to construction noise and vibration, we propose an efficient management plan of construction noise and vibration.
Safety accidents, which are called industrial accidents in construction work, are often caused by unstable physical and personal conditions combined during preparation and execution of work. It is difficult to manage all the construction works, but especially in the field of apartment construction work, complex and many kinds of works are being carried out at the same time. In the current construction, safety regulations such as safety management guidelines are generally well maintained, but the execution of manpower resources that can fulfill them is limited, and it is difficult to reduce the accident rate and loss cost. Therefore, in this study, it is a reality that most of the types of construction work are under contruction by subcontracting contract, so they are limit by methods of manual maintenance and safety education. Currently, the subcontractor is also allowed to perform safety management through the composition of the safety management review body, but it is operated formally. So alternatives to this were studied. As a result, safety accidents occur in the subcontractor's worker due to vertical integration, which is characteristic of the construction industry, together to the contractor, the safety management system is based on a safety construction system in which a worker who has a certain qualification condition such as career experience of the work type, work understanding of the work type, and management experience of the work type among the subcontractor, when we manage based on mutual personality which is the personality of interpersonal relationship that can communicate with each other by work type, process and grouping, it is concluded that effective and practical safety management can be achieved to reduce the accident rate and loss cost.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.