• Title/Summary/Keyword: construction manpower management

Search Result 180, Processing Time 0.024 seconds

COVID-19 and Return-To-Work for the Construction Sector: Lessons From Singapore

  • Gan, Wee Hoe;Koh, David
    • Safety and Health at Work
    • /
    • v.12 no.2
    • /
    • pp.277-281
    • /
    • 2021
  • Singapore's construction sector employs more than 450,000 workers. During the height of the COVID-19 pandemic in Singapore from April to June 2020, migrant workers were disproportionately affected, including many working in the construction sector. Shared accommodation and construction worksites emerged as nexuses for COVID-19 transmission. Official government resources, including COVID-19 epidemiological data, 43 advisories and 19 circulars by Singapore's Ministries of Health and Manpower, were reviewed over 8 month period from March to October 2020. From a peak COVID-19 incidence of 1,424.6/100,000 workers in May 2020, the incidence declined to 3.7/100,000 workers by October 2020. Multilevel safe management measures were implemented to enable the phased reopening of construction worksites from July 2020. Using the Swiss cheese risk management model, the authors described the various governmental, industry, supervisory and worker-specific interventions to prevent, detect and contain COVID-19 for safe resumption of work for the construction sector.

SUCCESS STORY OF THE SHIPBUILDING AND REPAIR INDUSTRY IN ACHIEVING EXCELLENT SAFETY PERFORMANCE: A LESSON FOR THE CONSTRUCTION INDUSTRY

  • Evelyn A.L. Teo;G. Ofori;Kelvin Y.N. Ng
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.896-906
    • /
    • 2009
  • In Singapore, the construction industry's performance in safety has often been the worst among the other industries. This paper seeks to compare the efforts of the shipbuilding and repair industry and the construction industry in improving the level of safety performance. One key factor identified in the paper will be the subcontractors' role in the safety aspect. Based on the analysis of statistic carried out by the Ministry of Manpower of Singapore and many others, this paper aims to identify the success of the shipbuilding and repair industry and gives thought as to how the construction industry can further improve its safety record.

  • PDF

A Study on the Human Resource Management of the Specialty Contractors Performing Multi Projects -Focused on Rebar and Concrete Work- (멀티프로젝트를 수행하는 전문건설업체의 최적인력관리방안 기초연구 - 철근.콘크리트공사 중심으로 -)

  • Seo, Jong-Min;Na, Young-Ju;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.67-73
    • /
    • 2008
  • Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment In a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it's imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.

Key Performance Indicators for Project Management Performance of Large Contractors in Developing Countries: A Case Study in Vietnam

  • Soo-Yong Kim;Troung-Van Luu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1599-1607
    • /
    • 2009
  • In order to deal with severe competition in the construction market of developing countries, large contractors must continually improve their own performance and operation. Performance measurement is the heart of ceaseless improvement in organizations. Key performance indicators (KPIs) play a key role in measuring project management performance (PMP) of large contractors in developing countries. The main objective of this paper is to identify KPIs, which can be used to measure PMP of contractors, and then analyze the underlying relationships of these KPIs in order to gain insight into PMP of large construction firms in Vietnam construction industry (VCI). Literature reviews and the pilot survey provided 30 KPIs. Fourteen KPIs, which have the mean values higher than 3.0, were considered as important KPIs through a questionnaire survey of 32 professionals. Factor analysis of these KPIs was employed to categorize them. The results of the survey revealed that top six KPIs are construction time and cost, owner satisfaction on services and products, and quality management and project team performance. Factor analysis uncovered that 14 top-ranked KPIs can be grouped under six categories, namely: (1) construction input management, (2) owner satisfaction, (3) cost and quality, (4) manpower management, (5) subcontractor performance and (6) equipment management. The findings of this research can be used as a guideline to measure PMP of contractors in Vietnam as well as in other developing countries. Since contractors from a country to the other country may have the same manner to manage construction projects, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in other developing countries.

  • PDF

Proposal Strategy and Performance Analysis of Electronic Human Resources Management Pilot Project (건설근로자공제회 전자인력관리(전자카드제)시범사업 성과 분석 및 추진전략 도출)

  • Kim, Inchie;Chin, Sangyoon;Kim, Seongah;Kim, Yeasang;Lee, Sangjun;Park, Soohun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.3-11
    • /
    • 2018
  • The Construction Workers Mutual Aid Association is carrying out a number of strategic tasks with the goal of "contributing to improving employment and stabilizing the return of workers to construction workers through employment welfare and retirement deduction services." One of them is the retirement deduction system. The retirement allowance system is a system for the retirement income and livelihood security of construction workers who are not adequately protected by the Labor Standards Act, such as retirement allowances due to the nature of day labor. The Construction Workers Mutual Aid Association has promoted the introduction of electronic manpower management. For the efficient management of the pilot sites and the plans for the future, comprehensive evaluation of the pilot sites as well as the evaluation of the status and operation results of each pilot project site are needed. Therefore, in this study, we will develop performance indicators to evaluate the current state of electronic manpower pilot projects and analyze the actual situation of pilot project sites through actual application, and try to derive future implementation strategies.

The Analysis of the Major Cost-increasing Risk Factors from the Perspective of Construction Management -Focusing on Pre-construction Phases- (건설사업관리자 관점에서의 주요 사업비 초과 리스크 요인 분석 -시공 전(前)단계를 중심으로-)

  • Kim, Byung-Yong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.147-155
    • /
    • 2012
  • Recently, various construction projects are invested with plenty capital, manpower and resources. The advanced methods of the construction management is introduced to Korea. However, the cases which get involved in excessive cost frequently occur. We can explain it means that the cost management in the entire phases and the risk factors in its works has not been done yet as expected. Thus, it is necessary to unearth risk factors relative to cost management and analyse them for preventing cost-increasing and the success of projects. In this point of view, this study aims to identify the risk factors of the cost management focused on pre-construction stages from the perspective of construction management which is possible to take part in the whole phases and works in cost management. Also, the impact priority and grade of risk factors to cost-increasing are evaluated by using FMEA.

Derivation and Implications of Digitalizing Key Construction Supervision Work: Focusing on the Construction Supervision Work of the Domestic Construction Sites

  • Chan Hyuk Park;Seong Mi Kang
    • Architectural research
    • /
    • v.25 no.1
    • /
    • pp.11-17
    • /
    • 2023
  • This study aims to derive key construction supervision work that can be digitalized among construction supervision work. The scope of the study includes domestic construction sites to which the Building Act of South Korea is applied. First, the construction supervision process was identified through extensive consultation of construction expert witnesses. Afterwards, the key construction supervision works for digitization were derived through survey results construction expert witnesses. Among the 24 supervision works throughout the pre-construction, construction, and post-construction stages, the proportion of supervision work manpower or cost, the type of data generated by supervision work and the urgency of introducing digital technology, and the impact on productivity and safety of supervision work were evaluated on a 5-point scale from "very low" to "very high" was investigated. The survey was conducted by t-test analysis, and as a result, it was possible to derive that the level of digitization was higher than average in "quality management," "safety management," and "collection and cooperation of maintenance instructions." It can be interpreted that digitization has been introduced on a pilot testing basis or has already been completed according to the needs of the site. On the other hand, it can be interpreted that the work that are obtained below the average score are considered to be realistically constrained at the construction site and that it is inevitable for the supervisor to proceed manually. Future studies include analyzing the quantitative impact of the key construction supervision work once digitalization is fully applied.

A Study on ERP construction in Small & Medium Enterprises by using SMERP (SMERP를 이용한 중소기업의 ERP 구축 방법 연구)

  • 김학식;염인순;이창호
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.97-103
    • /
    • 2003
  • In recent years, environments of business are changing due to epoch-making development of information technology and the advent of digital economy ages. It is an active confrontation as to the environments for information. Unlike the large scale enterprises in those days, hower, many small & medium enterprises especially the enterprises which are engaged in the manufacturing industry-aren't participate in information's rank due to the lack of funds, manpower, insufficient management environments, and manager or staff's lack of cognition as to information. So, this paper make a base of establishment for ISP through the establishment of ERP that is used to management activity for small & medium manufacturing enterprises. A way for small & medium enterprises' ERP construction is SMERP S/W for the small & medium enterprises' ERP package which is offered by the Korea chamber of commerce & industry. And, that is applied to the real management environment.

  • PDF

A Study on the improvement plan of regulatory standard for construction noise and vibration (공사장 소음진동 규제기준 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.369-379
    • /
    • 2013
  • Noise and vibration problems at the construction site, expansion of construction scale and frequency of urban construction is increased, has given the damage to local residents. Also, the result of civil complaint about noise and vibration that occurred in 2011 was 56,244; it is showing an increasing trend of more than 4% annually. In particular, the construction noise and vibration, the civil complaints of around construction site accounts for 64.6%(36,353), are harmful to the tranquility of living environment. As a result, the government has managed to strengthen the regulatory standard of construction noise (65dB(A), Day-time) from 2011. However, the regulatory standard of construction noise and vibration does not meet and also complaints related the construction noise and vibration not decreased. Because the management system can be applied to the construction site is insufficient and a shortage of manpower. In this study, investigated the status and problems of the regulatory standards related to construction noise and vibration, we propose an efficient management plan of construction noise and vibration.

A Study on Efficiency Improvement of the Safety Management Personnel System in Construction Site (건설공사 현장 안전관리 인적 체계 효율성 개선에 관한 연구)

  • You, Hee-Jae
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.1
    • /
    • pp.11-21
    • /
    • 2018
  • Safety accidents, which are called industrial accidents in construction work, are often caused by unstable physical and personal conditions combined during preparation and execution of work. It is difficult to manage all the construction works, but especially in the field of apartment construction work, complex and many kinds of works are being carried out at the same time. In the current construction, safety regulations such as safety management guidelines are generally well maintained, but the execution of manpower resources that can fulfill them is limited, and it is difficult to reduce the accident rate and loss cost. Therefore, in this study, it is a reality that most of the types of construction work are under contruction by subcontracting contract, so they are limit by methods of manual maintenance and safety education. Currently, the subcontractor is also allowed to perform safety management through the composition of the safety management review body, but it is operated formally. So alternatives to this were studied. As a result, safety accidents occur in the subcontractor's worker due to vertical integration, which is characteristic of the construction industry, together to the contractor, the safety management system is based on a safety construction system in which a worker who has a certain qualification condition such as career experience of the work type, work understanding of the work type, and management experience of the work type among the subcontractor, when we manage based on mutual personality which is the personality of interpersonal relationship that can communicate with each other by work type, process and grouping, it is concluded that effective and practical safety management can be achieved to reduce the accident rate and loss cost.