• Title/Summary/Keyword: construction lift

Search Result 159, Processing Time 0.03 seconds

An Algorithm for Hoisting Time Calculation in Super-tall Building Construction (건설 리프트 가감속 능력을 고려한 양중시간 산정 알고리즘 개발)

  • Cho, Chang-Yeon;Shin, Yoon-Seok;Won, Seo-Kyung;Kim, Jung-Yeol;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.120-129
    • /
    • 2011
  • An installation of the construction lift has a few limitations by many constrains and these have influences on labor productivity, that can be changed by vertical-transportation management. In the super-tall building construction, a management of construction lift operation is one of the most important factor, but existing methodologies depend on skilled practitioners' experiences. And it is true that the expertise resulted by the experiences does not transfer to the next generation. This study is a part of lifting-management simulation development which aims at the optimal construction lift management. A proposed algorithm is focus on lifting time calculation considering an acceleration capability. This research evaluates the result accuracy using comparative analysis on simulation result and field measuring time.

A Feasibility Study on Optimal Lifting Planning in the High-rise Apartment Building Construction (공동주택공사의 건설용 리프트를 이용한 양중계획 타당성 분석)

  • Lee, Jun-Bok;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.185-193
    • /
    • 2008
  • In order to improve work efficiency in high-rise apartment building construction, it is required to establish the major criteria and practical method for selecting the construction lifts. It is necessary to analyze work efficiency and economic feasibility depending on speed, size and capacity of lifting equipment and characteristics of construction projects. The purpose of this research is to develop the fundamental process and information for selecting the lift in order to plan and manage the material lifting and laborers' vertical transporting in the high-rise apartment building projects more effectively. In order to satisfy the objective of the research, work performance of the lifting machines with different speed and carrying capacity is analyzed under the practical constraints. In addition, potential economic evaluation is conducted. One of the significant findings of the research is that the mid-speed lift shows 43% improvement in work efficiency compared with the low-speed lift. The results of the research will be used as the basis for developing the further optimal lifting management system.

LIFT-UP 공법

  • korea construction safety engineering association
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.22
    • /
    • pp.62-63
    • /
    • 1996
  • PDF

A Preliminary Study to Apply Group Control System to Lifts for High-rise Construction (초고층 공사 리프트의 그룹제어 시스템 적용을 위한 기초 연구)

  • Kim, Taehoon;Lim, Hyunsu;Kim, Chang-Won;Kim, Seung Woo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.260-261
    • /
    • 2017
  • The objective of this study is to propose the basic design plan of system by comparing and analyzing application environment of lift and elevator group control system, as preliminary study for the application of group control system to lifts for high-rise construction. The basic design plan is suggested in terms of group control algorithm, hall call system type, operation information recording device, information communication method, and operation method. The results of this study can be used as basic data for software and hardware design for application of group control technology of lifts for super tall building construction and ultimately contribute to improve the operation efficiency of lift for high-rise construction.

  • PDF

Citic Tower Construction Key Technology

  • Xu, Lishan
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

3-dimensional Analysis of a Lift-Magnet for MAGLEV (도시형 자기부상열차용 부상 전자석의 3차원 해석)

  • Park, Seung-Chan;Lee, Won-Min;Kang, Byung-Kwan
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.331-336
    • /
    • 2008
  • Magnetic path direction in the back-iron of a linear induction motor(LIM) is perpendicular to that of the lift-magnet of the MAGLEV which is recently developing in KOREA. In general the back-iron is isolated magnetically in conventional rail in order to eliminate the thrust dependency of the LIM on the lift force. However the magnetic isolation causes some increase in construction and management cost. So a unit-type rail system is considered, which the magnetic circuit of the back-iron is sharing that of the lift-magnet. In this paper 3-dimensional analysis for the lift-magnet is carried out using finite element method. As a result, a new shape of the unit-type rail is presented to reduce the magnetic dependency between thrust force and lift force. Also the distribution of magnetic flux density vectors and current-lift force characteristics are presented.

  • PDF

Permeability Variation With Lift Thickness of Asphalt Pavement (아스팔트 포장의 시공 포설두께에 따른 투수계수 변화특성)

  • Park, Sang Hyun;Moon, Jun Ho;Bae, Seok Il;Kim, Young Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.3
    • /
    • pp.2229-2233
    • /
    • 2015
  • The permeability of HMA(hot mixed asphalt) is a major influencing factor for long-term performance of the pavement. Especially, the lift thickness of the pavement during construction causes a wide range of physical properties of HMA. This study investigates the correlationship between the lift thickness and the physical properties of HMA through a series of laboratory experiments. The specimens were cored from a construction site of the dense graded asphalt pavement. The cored samples have various lift thickness and the number of compaction for the study. The results of the study show that the permeability of the sample decreases with the apperant density and t/NMAS, and the air void ratio. Therefore, the commonly used construction method as a constant lift thickness regardless of conditions needs to be reconsidered.

A Study on Optimal Inspection Interval for the Major Components of Construction Lift (건설용 리프트의 운행정보 및 고장데이터 분석을 통한 주요 부품별 점검주기 산출 연구)

  • Soh, Jiyune;Bae, Jaehoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.68-77
    • /
    • 2015
  • One of recent concerns for super-tall buildings is how to manage hoisting plans and equipment efficiently. Disasters are frequently occurred in relation to electromotive hoists and cranes which are commonly used in construction sites. For construction lifts, particularly, it is highly important to conduct regular inspections or prepare against breakdown in terms of safety. However, unfortunately the reality is that regular inspections are only flatly conducted according to operating hours only. A lift, whose life span is subject to the complicated considerations such as operating hours, loading condition, and the like of each component, is far too invalid as a means of maintenance. As a way to resolve this problem and improve its convenience and safety for users, this study intends to calculate individual inspection interval for the main components of lifts by measuring their actual operating hours with sensing technology and analyzing their historical data. The findings of study include calculation of inspection intervals for the main components of lifts and classification of components to check by the actual operating hours of lift (40, 90, 130, 400 hours), which are drawn up into tables. This will make an opportunity to suggest efficient maintenance measures by enabling prevention of safety accidents and enhancement of safety for workers. Also, it will lead to increasing productivity of works by eliminating sources of delaying the term due to the breakdown of lifts.

Characteristics of Adiabatic Temperature Rise for Concrete according to FA Cement and CGS Replacement Rate (FA시멘트 및 CGS 치환율에 따른 콘크리트의 단열온도상승 특성)

  • Baek, Sung-Jin;Hu, Yun-Yao;Kim, Su- Hoo;Han, Jun-Hui;Yoon, Chee Whan;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.117-118
    • /
    • 2022
  • In this study, adiabatic temperature rise of concrete depending on binder compositions and CGS contents is studied to provide informations for CGS low-heating aggregate and mixture designs for upper and lower placement lifts. Test nresults indicate that it is desirable to apply the combination of binders between top and bottom lift. For top lift, SESC or ESC is recommended, and for bottom lift, FAC+CGS 50 % is good for material composition.

  • PDF

Study of random characteristics of fluctuating wind loads on ultra-large cooling towers in full construction process

  • Ke, S.T.;Xu, L.;Ge, Y.J.
    • Wind and Structures
    • /
    • v.26 no.4
    • /
    • pp.191-204
    • /
    • 2018
  • This article presents a study of the largest-ever (height = 220 m) cooling tower using the large eddy simulation (LES) method. Information about fluid fields around the tower and 3D aerodynamic time history in full construction process were obtained, and the wind pressure distribution along the entire tower predicted by the developed model was compared with standard curves and measured curves to validate the effectiveness of the simulating method. Based on that, average wind pressure distribution and characteristics of fluid fields in the construction process of ultra-large cooling tower were investigated. The characteristics of fluid fields in full construction process and their working principles were investigated based on wind speeds and vorticities under different construction conditions. Then, time domain characteristics of ultra-large cooling towers in full construction process, including fluctuating wind loads, extreme wind loads, lift and drag coefficients, and relationship of measuring points, were studied and fitting formula of extreme wind load as a function of height was developed based on the nonlinear least square method. Additionally, the frequency domain characteristics of wind loads on the constructing tower, including wind pressure power spectrum at typical measuring points, lift and drag power spectrum, circumferential correlations between typical measuring points, and vertical correlations of lift coefficient and drag coefficient, were analyzed. The results revealed that the random characteristics of fluctuating wind loads, as well as corresponding extreme wind pressure and power spectra curves, varied significantly and in real time with the height of the constructing tower. This study provides references for design of wind loads during construction period of ultra-large cooling towers.