• Title/Summary/Keyword: construction labor productivity

Search Result 177, Processing Time 0.023 seconds

Development of Labor Productivity Index for Steel Construction (철골공사의 노동생산지수 개발)

  • Kang Byoung-Ryoul;Kim Ki-Sung;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.353-357
    • /
    • 2004
  • The construction competition is more deepened with the enterprise possibility increase which it follows in the regulation relaxation back against the construction market penetration which carries and the instability of market is added an extra weight and it solves the aspect where also the profitability which is caused by with low price bidding decreases. Against a productivity with the overcome plan it is researched plentifully and the far for a productivity improvement, there is so far to construction, the productivity being used with only include meaning, is to a practical affairs and the application ver)r as the level which is feeble is a possibility of doing. It is like that and the research develops the producing district possibility of new steel-frame work and in the actuality which sees the production volume of steel-frame work and a construction accomplishment process effectively and to be right numerical figures it does it plans it controls and manages the place ultimate objective which it puts.

  • PDF

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Analysis on Offset Factors of Learning Curve Effect and Estimation of Labor Productivity in High-rise Projects (초고층 프로젝트에서의 학습곡선효과 상쇄요인 분석 및 작업 생산성 산정 방법 제시)

  • Lee, Bogyeong;Park, Moonseo;Lee, Hyun-Soo;Kim, Hyunsoo;Moon, MyungGi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.38-48
    • /
    • 2013
  • Focusing on repetitive works of construction, many research have been conducted about application of the learning curve effect. However, it is still controversial, especially on the high-rise project, since the productivity improvement from the learning curve effects are hard to prove. In the previous research, applicability of the learning curve was mainly derived from the labor productivity data. Although the research were based on the real data, they merely concentrated on the simple conclusion that the labor productivity had improved or not, instead of the process interpretation. Therefore, the purpose of this research is to analyze the influence factors of the learning curve effect in high-rise projects and elucidate the offset factors of the effect. Based on these factors, a model for estimating the labor productivity containing the concept of process learning is suggested. Through our research, traditional learning curve theory could be compensated and re-established with having more appropriateness for high-rise projects.

Analysis on Research Trend of Productivity Using Text Mining - Focusing on KSCE Journal - (텍스트 마이닝을 통한 건설 생산성 분야의 연구동향 분석 - KSCE 저널을 중심으로 -)

  • Gu, Bongil;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.15-21
    • /
    • 2020
  • The relationship between keywords, found in all productivity related papers published in the KSCE journal for last 15 years, were analyzed in order to reveal a research trend in the area using text mining and A-Priori algorithm. As the results, it is found that the word of 'productivity' is most closely related to the words of 'work' and 'labor'. Futhermore, the word is somewhat related to those of 'factor', 'model', simulation', and 'work time'. It is also revealed that, on the other hand, the words of 'machine' and 'equipment' have little relationships with the keyword. This research will be a great help for academia to understand a research trend in the area of construction productivity.

Classify and Quantify Cumulative Impact of Change Orders On Productivity Using ANN Models

  • Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.69-77
    • /
    • 2005
  • Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative Impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results skew that ANN models give significantly improved performance compared to traditional statistical models.

A Calculation Model of Site Management Manpower for Apartment Building Construction Project (공동주택의 현장관리 인력 산출모형 연구)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Won, Il-Woo;Joo, Jin-Kyu;Lee, Goon-Jae
    • KIEAE Journal
    • /
    • v.11 no.4
    • /
    • pp.47-54
    • /
    • 2011
  • Construction companies find it increasingly necessary to reduce the cost as the construction market has been suffering from a depression and the industrial environment has been changing fast lately. The cost cut demands the productivity management of the field operations, which can be made feasible by assigning an appropriate number of managers on the construction site. However, previous studies are focused on the labor productivity and construction companies take into account only the revenue per worker in organizing the staff. The purpose of this study is to research the model for calculating the field management manpower in accordance with the characteristic of project and site conditions which are usually considered in the beginning of the construction project. The data about apartment building projects of domestic large constructors and factors related to them were statistically analyzed. The results of this study can be used to calculate the necessary field management manpower in accordance with the characteristic of project.

Identifying Factors Affecting Labor Productivity for Residential Fire Protection System Installation (공동주택 소방설비공사의 노무생산성 영향요인 분석)

  • Oh, Jae-Hoon;Kim, Dae Young;Kim, Jae Sik;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.377-384
    • /
    • 2017
  • It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.

A Study on Industry Characteristics of Technology Trade in Korea : evidence from OECD Countries (우리나라 기술무역의 산업별 특성에 관한 연구 : OECD 국가를 대상으로)

  • Baek, Eun-Young;Moon, Hee-Cheol
    • International Commerce and Information Review
    • /
    • v.12 no.4
    • /
    • pp.151-170
    • /
    • 2010
  • The present study made an empirical analysis for investigating the competitiveness of technology trades in Korea. In particular, the study deduced the correlation between technology export and technology import using the variables of Gross Domestic Expenditure on R&D and Per capita industry value added Productivity and employed fixed effect model in panel linear regression model. It is found that the R&D expenditure of OECD countries made a significant effect on the technology import and the value-added labor productivity made a significant result on both technology export and import. Therefore, it showed that the technology trade in Korea made a sensitive response to labor productivity in OECD countries. By panel analysis, machine, construction, ICT, and service industry affect most on technology export in Korea for recent 5 years. For technology import, electric-electron, chemical, service, and construction industry have significant effects. This study contributed to understanding of industrial characteristics affecting technology trades in Korea and empirical analysis to show correlation between the factors affecting technology trade.

  • PDF

Development of Productivity Analysis Simulation Model for Formwork Based on 3D Printing Technology Using ARENA (ARENA를 활용한 3D 프린팅 기술 기반 거푸집 공사의 생산성 분석 시뮬레이션 모델 개발)

  • Ahn, Heejae;Lee, Changsu;Kim, Harim;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.188-189
    • /
    • 2021
  • The technology of manufacturing freeform molds with S-LOM based 3D printer has advantages in the production period and the curvature range. However, there is no any support tool about productivity analysis of S-LOM technology because S-LOM technology is early-stage technology. There can be problems about increase of construction time and cost without any decision support tool like productivity analysis models etc. Therefore, in this study, the productivity analysis simulation model for freeform formwork based on S-LOM technology was developed using ARENA software. The process and logic of manufacturing freeform molds can be easily visualized in this model. Futhermore, the resource like labor, equipment and material can be easily optimized with this model. As a result, it can contribute to preventing the increase of construction time and cost in formwork with further productivity analysis.

  • PDF