• Title/Summary/Keyword: construction fee

Search Result 115, Processing Time 0.029 seconds

Process Improvements for Reducing Apartment Defects after Completion (준공후 아파트 하자 저감을 위한 절차개선 방안 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.355-361
    • /
    • 2018
  • Many defects are occurring in apartments, the main residential area in Korea. This is due to a lack of construction skills and a lack of management. As many apartments are provided to buyers, the dispute over defects after completion is increasing rapidly. The Housing Act was amended so that local governments could order contractors to repair defects. However, even if defects are resolved after a defect is generated, it is not a fundamental solution that can be satisfied because buyers have to endure the pain caused by the defect. So, it is necessary to protect the interests of buyers by fundamentally reducing defects in apartments. Therefore, in this study, it was suggested that the asymmetry of the information about the apartment buyers should be resolved at the time of sale of the apartment, the final drawings should be a contract document, the review period of the apartment house supervision should be secured, the appropriate supervisory fee should be secured at the time of contract change and the payment procedure should be improved.

Suggestions for Resolving the Social Conflict in Affordable Housing

  • Park, Tae Soon;Lee, Mihong
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.179-191
    • /
    • 2014
  • The purpose of this study is to employ a method called 'conflict impact assessment' to analyze the progress, background, cause and relevant issues of conflicts related with affordable housing for youth (Happiness Housing Project), a project that has been implemented since last May 2013, thereby identifying the relevant problems and draw out objectives for improvement. The researchers expect that this study will contribute to solving the current issues regarding Happiness Housing, and contribute to improving the quality of the government's policies. For the above purpose, literatures on Happiness Housing produced from August to November 2013 were reviewed, in-depth telephone or face-to-face interviews were conducted with personnel associated with project implementation in the Ministry of Land, Infrastructure and Transportation and LH, etc., and major interested parties including Yangcheon-gu residents. Key issues identified regarding Happiness Housing construction include: the way that the project was implemented, living quality of residents, impact on educational environment, inconsistence with existing plans, relatively high construction cost, insolvency of public corporations, land use fee issue with Korail, need of preliminary feasibility survey, securing sufficient amount for supply and issue of additional designation, likelihood of finishing construction in time and issues related with actual source of demand, etc. Through analysis of conflict development and positions of interested parties, the main causes of the conflicts were identified as follows: lack of deliberation on pledges during election, lack of viability review on pledges, lack of conflict management plans, one-way implementation without consent of interested parties, project plans established with no regard to local circumstances, frequent project revision, underwehlming level of conflict management. In order to address issues above, the following measures need to be taken: selecting election pledges based on actual effectiveness, thorough assessment on pledges by relevant departments, gradual implementation based on consideration of the actual circumstances, participation of key interested parties, consistent policy and adopting conflict management techniques that reflect the reality.

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

A Study on the status and improvement of construction management in Daegu Gyeongbuk Institute of Science & Technology (대구경북과학기술연구원의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Kim, Hwa-Bong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.32-38
    • /
    • 2007
  • Recently The public project ordering is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. The CM services of project all phase excepts a planning business are performed. But recently the CM services of project all phase including a planning business are increasing every year. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the planning business management, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Daegu Gyeongbuk Institute of Science & Technology.

  • PDF

Research on Benefit and Disadvantages of Concrete and Asphalt for Golf Course Cart Path Construction (골프장 카트도로에서 콘크리트와 아스팔트 포장재의 장단점 비교분석)

  • Kim, Dong-Chan;Kim, Shin-Won;Ha, Jong-Du
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.5
    • /
    • pp.78-89
    • /
    • 2009
  • Overall 25~30 new golf courses are opening in Korea these days, and total annual rounds have been also increasing by 10~15% every year. The Korean golf industry is being recognized as the largest growing golf industry in the world. However, it is easily defined that there are many problems of golf course development and construction methods such as construction fees. The average construction cost for golf course development and golf course maintenance fees in Korea are much more than the cost in the USA and other countries. It may be due to the fact that USA golf course development is managed by a highly developed construction method and well trained specialists. This study will be concentrated on one of the major differences, which is about cart path material; this causes a big difference of construction and maintenance fees. In order to overcome this study, concrete and asphalt will be specified as the main cart path material. Also, some case studies and construction regulations of golf course development in the USA will be introduced for a better understanding of this study.

Evaluation of Capability for Practicing CM at Risk in Korea (국내 시공책임형 건설사업관리 수행을 위한 기업 역량 평가)

  • Ryu, HanGuk;Lee, Sangwon;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.79-87
    • /
    • 2020
  • The Korean domestic construction management at risk (CMAR) market is in the process of completing the pilot project execution under the leadership of the Ministry of Land, Infrastructure and Transport as of December 2019. The government starts practicing CMAR an alternative delivery method widely in order to diversify delivery methods and enhance construction technology. The CMAR market is thus expected to grow. This study was conducted to improve CMAR firms' capability by developing self-assessment tools for them to evaluate current capability more effectively. As a result of defining standard core capability and additional elements categorized by project execution phase and management area, and performing evaluation from the CMAR project participants, it was found that the general project management capability in the pre-design and procurement phase and quality management area was lower compared to the construction phase and other areas. In addition, the capability of cost management area was lower in spite of its high importance. Communication and coordination, process optimization, and target values achievement were at the initial level of capability and continuous improvement was required.

A Study on the Economical Efficiency of Mega Container Ship's Operation by Empirical Analysis : Primarily on Container Ship (실증분석을 통한 대형선의 운항 경제성에 관한 연구 -컨테이너선을 중심으로-)

  • Song Yong-Seok;Kim Hyun;Jung Seung-Ho;Nam Ki-Chan
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.253-260
    • /
    • 2004
  • In these days, 8000TEU container ship service launches in shipping service at latest based on the economy of scale, unit cast related with ship operation on ocean decreases in proportion to increase of ship scale and mega ship over 10,000TEU is on planning. This paper is analyzed the economic efficiency for reduction qf calling port in the operation cost, port chnrge, feeder cost, etc by an empirical analysis.

  • PDF

A Case Study of Post-Occupancy Evaluation of Home Automation System by Digital Home Residents - Focused on H Highrise Apartment - (디지털 홈 거주자의 홈오토메이션 시스템에 대한 거주 후 평가 사례 연구 - H 초고층 아파트 거주자를 중심으로 -)

  • Kwon, Oh-Jung
    • Journal of the Korean housing association
    • /
    • v.19 no.1
    • /
    • pp.17-27
    • /
    • 2008
  • Recently, newly built apartments in Korea are provided various home automation (HA) systems based on information technology(IT) for residents' safer, healthier and more convenient living. However, the residents in these digital apartments are often not able to use the home automation systems effectively because of lack of their IT knowledge, attitude, or education. However, there are few researches have been done to find out the HA systems' real problems with regard to residents' aspects who use those systems everyday. The purpose of this study was to find out residents' current uses, satisfaction level and existing problems of HA systems by residents' POE. The findings of this study will give useful information to digital home construction companies to provide user-friendly digital home services for increasing users' satisfaction. One distinctive apartment equipped with home automation systems located in Seoul was selected for in-depth personal interview. The researcher developed a survey instrument and collected the data from 58 residents in January, 2007 who had been living there for more than a year. The results of the study found that critical problems were existed in several systems and they caused a lot of dissatisfaction from the residents. Also, some residents do not use several systems although they need to use them due to the burden of maintenance fee. Further detail findings and suggestions of this study were discussed.

Design of Effective Subscriber Network Based on Interation network (음성 데이타 통합을 위한 가입자 망설계와 전송 성능 평가)

  • Chung, Jun-Ho;Eom, Ki-Bok;Yoe, Hyun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2001.10a
    • /
    • pp.142-145
    • /
    • 2001
  • I did research or design technology of(integration) network of PSTN and PSDN in this paper. Network structure model in association with soft switching and access gateway can create various services based on web and live time and service fee at the rate of bandwidth which can't be provided by existing network based on SONET. Also, interns of capability(function) of each area and construction of local network subscribers, it has great recovery capability by separating each network as local areas. It indicates that it can additionally maximize the application of its own communication network and drastic reduction of communication cost because it is alternated to exclusive usage cost.

  • PDF

Optimization for Precast Prestressed Wide-U Beams with the Least Depth (최소깊이 프리캐스트 프리스트레스트 U형보의 최적화)

  • Yul Sung-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.1 s.79
    • /
    • pp.18-26
    • /
    • 2004
  • The cost of underground work is a dominant factor to determine the total construction fee. It is generally 2 ${\~}$ 2.5 times higher than that of above ground for building with the same height. 'A new precast prestressed framing plan for underground parking building' was suggested with the beam of the least depth - U-type beams. The depth of regular rectangular reinforced concrete beam which is currently used in the underground parking of apartments could be reduced up to 12 ${\~}$ 34cm/story due to the development of a U-beams from the optimum process. Two full scale prototype U-beams were tested in this study. It was found that the Wide U-beams in the test showed higher strength than calculated nominal and design, however need to provide temporary supports to meet the flexural moment of construction load at the simply supported state before the lopping concrete hardens.