• 제목/요약/키워드: construction equipment price

검색결과 48건 처리시간 0.026초

시가표준액을 활용한 건설공사표준품셈 건설기계가격 상시관리 방안 (How to Use Standard Market Prices for Ordinary Management System of Construction Equipment Prices in Poom-Saem)

  • 안방율;허영기;김대영;태용호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.98-99
    • /
    • 2014
  • Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Despite its importance, the construction equipment cost may not reflect the current market value since the equipment database is being updated every 6 years at most. To keep construction equipment cost up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a gap to adopt the standard market price system for the construction equipment cost computing system. Therefore, this paper suggests an effective way to develop a construction equipment cost estimation system.

  • PDF

건설기계가격 상시관리시스템 도입방안에 관한 연구 (Research on Realtime Mornitoring System for Construction Equipment Price)

  • 안방률;태용호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.50-51
    • /
    • 2014
  • Although price of construction equipment affects overall cost of a construction projects, the cycle of updating them presented in the Poom-Saem in Korea is more than six years. Recently there is a demand of using the 'Standard Market Price of Construction Equipment', published by the ministry of Security and Public Administration, for estimating equipment operating and ownership cost. It is urgent to introduce an advanced system for updating the prices which can timely reflect market changes.

  • PDF

시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발 (An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1)

  • 안방률;태용호;김대영;허영기
    • 한국건축시공학회지
    • /
    • 제15권4호
    • /
    • pp.397-404
    • /
    • 2015
  • 국내 공공건설사업의 건설기계경비 손료 선정 시 사용되는 건설기계가격표는 급변하는 현실을 제대로 반영하지 못하고 있다. 본 연구에서는 현실이 반영된 기계경비 산정을 위해 "기계장비 시가표준액표"를 활용하여 표준품셈의 건설기계가격이 지속적으로 제 개정될 수 있는 체계화되고 선진화된 상시관리시스템의 방안을 개발하여 제시하고, 대표적인 장비에 이를 적용하여 건설기계가격의 변화가 정부예산에 미치는 영향을 분석하였다. 본 연구의 결과는 투명하고 공정한 공사비 산정기준을 정립하는 데 도움이 될 것으로 기대한다.

Analysis of Construction Cost Fluctuation Trends and Features on Apartment Housing

  • Park, Wonyoung;Kang, Tai-Kyung;Baek, Seung-Ho;Lee, Yoo-Sub
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.624-635
    • /
    • 2012
  • Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.

경제성에 의한 건설중장비 감가상각관리 개선 (A Study on the Improvement of Depreciation Management for Construction Equipment Considering Economic Efficiency)

  • 이용수
    • 대한토목학회논문집
    • /
    • 제32권4D호
    • /
    • pp.357-366
    • /
    • 2012
  • 기존의 품셈과 지방세법은 건설중장비가 수 년에 걸친 감가상각 대상임에도 불구하고, 물가지수를 제대로 반영하지 못하고 있다. 이에 본 연구에서는, 법인세법과 지방세법 및 기업회계기준서를 분석하여 국내 감가상각제도의 특징과 상각방법을 정리하여 제시하였고, 경제성 이론이 반영된 건설중장비 자본회수계수를 제시하였고, 정액법과 정률법을 사용하여 표준품셈을 기준으로 한 감가상각과 세법을 기준으로 한 감가상각 사례를 제시하였다. 개선방안으로는, 건설중장비의 자발적 사용기간 신청제도와 현행제도와의 관계를 설명하고 도입을 제안하였으며, 국내물가지수를 기초로 월단위 기계경비 감가상각율표를 개발하여 제공하였으며, 그 적용방안을 예시하였다. 또한, 제안한 방안의 장점과 단점을 분석하여 연구의 적용한계와 차후 개선방향도 제시해 보았다. 본 연구를 통해 품셈과 세법에 보다 합리적이고 객관적인 현실성을 반영할 수 있을 것으로 판단된다.

THE TREND OF CONSTRUCTION COST INDICES AND THEIR APPLICATIONS

  • Yoo-Sub Lee;Seung-Hyun Lee;Tai-Kyung Kang
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.908-912
    • /
    • 2005
  • Construction Cost Indices are values for measuring fluctuations in direct construction costs which include material costs, labor costs, and equipment costs for construction operations. In Korea, Korea Institute of Construction Technology (KICT) has been assessing and announcing these indices since January, 2004. The main goals of this paper are to look over the calculation process for those indices and then present the trend in construction costs according to the types of facilities with the past construction cost index data. Also, this paper traces the origin of the occurrence of significant changes on those indices through the further analysis of the trend. In addition, this paper shows the practicality of the indices and the way how to put them to practical use. An alternative estimate method using the indices is suggested for compensating the changes of construction costs caused by price fluctuations.

  • PDF

빅데이터 분석기법을 활용한 탄소배출권 가격 예측 (Estimation of Carbon Emissions Price Using Big Data Analysis Method)

  • 임기성;박상원;장지영;이민우;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.50-51
    • /
    • 2019
  • Globally, South Korea is a country that has a lot of $CO_2$ emissions and has steadily increased its total greenhouse gas emissions since the 1990s. With the recent implementation of the carbon emission trading system in Korea, the importance of calculating $CO_2$ emissions of construction equipment is increasing, hence the need for accurate calculation of environmental penalties through allocating carbon emission rights. This study presents a methodology to predict the price of carbon credits using big data analysis method. This methodology is based on correlating and regression analysis of trends in carbon emission prices and search volumes. This study aims to support faster and more accurate budget calculations in the planning of the construction process based on the predicted price of carbon emission rights.

  • PDF

Risk Factors Affecting Equipment Management in Construction Firms

  • PHAM, Cuong Phu;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To;LE, Loan Phuc;DUONG, My Tien Ha
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권11호
    • /
    • pp.347-356
    • /
    • 2020
  • Mechanization and automation constitute an essential stage in the production and operation of any company, as one of the determinants of increase in labor productivity and decrease in product price, while significantly contributing to shortening of the lead time. Businesses are, therefore, able to quickly put projects into operation, improving economic efficiency, quality, and aesthetics, which speeds up the national economic growth. For the construction industry to be the most effective, modern construction equipment is a necessity. It is one of the five main resources of a construction project. Thus, effective construction equipment management contributes to the success of a project and benefits the relevant construction companies economically. This paper presents the critical risk factors affecting equipment management and proposes suitable solutions. The questionnaire-based survey with experienced experts in the construction sector on the management of the likelihood and consequence of risk factors revealed thirty-two risks for equipment management in construction companies. These factors fell into six groups: (i) site organization-related risks; (ii) management-related risks; (iii) owner-related risks; (iv) supplier-related risks; (v) legal risks, and (vi) site condition-related and external risks. The results showed that management-related factors contributed to the most significant risks and problems for equipment management in construction companies.

고소작업대 조종훈련용 시뮬레이터 (Aerial Working Platform Training Simulator)

  • 기재석
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2007년도 춘계학술대회
    • /
    • pp.133-141
    • /
    • 2007
  • Aerial working platform is recently used broadly in heavy industry and construction field and also the utilization of it is growing. However, the raise of critical incident caused by unskilled operator is increasing gradually. To reduce and prevent such incident, the training for operating is essential. It's not easy to cover the requirements for the training with real platform because of the high price of it, safety and weather condition. This paper proposes a simulator for the training based on virtual reality to give the training safely regardless to the weather condition and the simulator is deliverable in lower price than real one. The simulator proposed in this paper is available to be set according to the level of trainee managing the assessment level and be also applied for the design of general heavy equipment training simulator based.

  • PDF

고소작업대 조종훈련용 시뮬레이터 (Aerial Working Platform Training Simulator)

  • 기재석
    • 대한안전경영과학회지
    • /
    • 제9권4호
    • /
    • pp.57-62
    • /
    • 2007
  • Aerial working platform is recently used broadly in heavy industry and construction field and also the utilization of it is growing. However, the raise of critical incident caused by unskilled operator is increased gradually. To reduce and prevent such incident, the training for operating is essential. It's not easy to cover the requirements for the training with real platform because of the high price of it, safety and weather condition. This paper proposes a simulator for the training based on virtual reality to give the training safely regardless to the weather condition and the simulator is deliverable in lower price than real one. The simulator proposed in this paper is available to be set according to the level of trainee's skill managing and be also applied for the design of general heavy equipment training simulator.