An Ordinary Management System for Updating Construction Equipment Prices in the Poom-Saem Based on the Standard Market Price1

시가표준액표를 활용한 건설공사표준품셈 건설기계가격 상시관리 시스템 개발

  • Ahn, Bang-Ryul (Korea Institute of Civil Engineering and Building Technology) ;
  • Tae, Yong-Ho (Korea Institute of Civil Engineering and Building Technology) ;
  • Kim, Dae (Department of Architectural Engineering, Dong-eui University) ;
  • Huh, Young-Ki (Department of Architectural Engineering, Pusan University)
  • Received : 2015.01.07
  • Accepted : 2015.03.18
  • Published : 2015.08.20

Abstract

Construction equipment cost is critical to estimate the total construction costs, particularly in large and complicated projects. Public construction projects are typically estimated using the Poom-Saem which includes hourly rates for workers and equipments. Despite its importance, the construction equipment cost may not properly reflect the current market value because it is being updated every six years at most. To keep the data for construction equipment cost estimation up to date, it is highly recommended to use the standard market price that is reported each year by the Ministry of Security and Public Administration (MOSPA). However, there is still a wide gap to directly adopt the standard market price for updating the construction equipment prices. Therefore, this paper suggests an effective way to develop an ordinary management systems for updating construction equipment prices in the Poom-saem based on the standard market price.

국내 공공건설사업의 건설기계경비 손료 선정 시 사용되는 건설기계가격표는 급변하는 현실을 제대로 반영하지 못하고 있다. 본 연구에서는 현실이 반영된 기계경비 산정을 위해 "기계장비 시가표준액표"를 활용하여 표준품셈의 건설기계가격이 지속적으로 제 개정될 수 있는 체계화되고 선진화된 상시관리시스템의 방안을 개발하여 제시하고, 대표적인 장비에 이를 적용하여 건설기계가격의 변화가 정부예산에 미치는 영향을 분석하였다. 본 연구의 결과는 투명하고 공정한 공사비 산정기준을 정립하는 데 도움이 될 것으로 기대한다.

Keywords

References

  1. Mechanic and Electronic Research Team in Korea Institute of Civil Engineering and Building Technology. 1987 Pyojonpoomseam.Gaejungbowan.Yerngubogoseo-Gigebuny a [1987 Standard measurement method.Revision and supplementation.Research report-Equipment section]. Seoul (Korea): Korea Institute of Civil Engineering and Building Technology; 1986. 40 p. Report No.: 86-M-1. Korean.
  2. Ministry of Security and Public Administration. Sigapyojunack.Pyo-Gigaejangbi [Standard market prices.Table-Machine equipment]. Seoul (Korea): Ministry of Security and Public Administration; 2011. 643 p. Korean.
  3. Ministry of Security and Public Administration. Sigapyojunack.Pyo-Gigaejangbi [Standard market prices.Table-Machine equipment]. Seoul (Korea): Ministry of Security and Public Administration; 2012. 645 p. Korean.
  4. Ministry of Security and Public Administration. Sigapyojunack.Pyo-Gigaejangbi [Standard market prices.Table-Machine equipment]. Seoul (Korea): Ministry of Security and Public Administration; 2013. 647 p. Korean.
  5. Ministry of Security and Public Administration. Sigapyojunack.Pyo-Gigaejangbi [Standard market prices.Table-Machine equipment]. Seoul (Korea): Ministry of Security and Public Administration; 2014. 649 p. Korean.
  6. Ministry of Land, Infrastructure and Transport. 2014 Gunsulgongsa.Pyojun.Poomsaem [2014 Construction work items.Standard.Estimation method of productivity]. Seoul (Korea): Mun Wha Corporation; 2014. p. 319-398. Korean.
  7. Kim WG, Go JM, Min BY. 1985 Pyojonpoomseam.Bowan.Yerngubogoseo [1985 Standard measurement method.Supplementation.Research report]. Seoul (Korea): Korea Institute of Civil Engineering and Building Technology; 1984. 315 p. Report No.: 84-0-1. Korean.
  8. Mechanic and Electronic Research Team in Korea Institute of Civil Engineering and Building Technology. 1986 Pyojonpoomseam.Gaejungbowan.Yerngubogoseo-Gigebuny a-Vol. III [1986 Standard measurement method.Revision and supplementation.Research report-Equipment section-Vol. III]. Seoul (Korea): Korea Institute of Civil Engineering and Building Technology; 1985. 117 p. Report No.: 85-M-1. Korean.
  9. Lee TS, Yoon TW, Lee KS. Gunsulgigae.SonryoSanjung bangbub Gaesnbangan [Construction equipement.wner ship cost.Estimating method.Improvement plan]. Seoul (Korea): Sam Shin Corporation; 1990. 130 p. Report No.: 90-CM-111. Korean.
  10. Huh YK. Gunsulgongsa.Pyojunpoomsaem.Gigaegyungbi.Jegaejung [Construction work items.Standard estimation method of productivity.Construction equipment owner ship cost.Revision]. Seoul (Korea): Pusan National University press; 2006. 85 p. Report No.: 2006-CM-000. Korean.