• 제목/요약/키워드: construction element

검색결과 2,531건 처리시간 0.03초

시공과정에 따른 보강토 옹벽의 거동 특성 (Behavior of Mechanically Stabilized Earth Retaining Walls with Different Construction Sequence)

  • 유충식;이광문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.473-480
    • /
    • 1999
  • This paper presents the results of a parametric study on the behavior of mechanically stabilized earth retaining wall. It has been recognized that the currently available design guidelines, which is base on the limit equilibrium approach, cannot properly account the interaction effect between the components, construction sequence, and foundation settlement which may impose a significant influence on the wall behavior. A parametric study using finite element analysis was performed to investigate the behavior of MSE wall under different construction conditions and the applicability of the current design approach. In the parametric analysis, the effects of the construction sequence, the surcharge, and the foundation stiffness were studied and a detailed finite element modeling for various components of the system were employed. The results, such as wall displacement and earth pressure distributions, reinforcement forces, vertical stress distribution were then thoroughly analyzed to investigate the effect of construction details on the wall behavior.

  • PDF

3-D elastoplastic finite element analysis of umbrella arch reinforcement system for tunnelling

  • Shin Hyu-Soung;Sicilia Carlos;Bae Gyu-Jin;Kim Chang-Yong;Hong Sung-Wan
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.184-191
    • /
    • 2003
  • In this paper, a mathematical framework based on a homogenisation technique to simulate 'umbrella arch reinforcement system' (UARS) and its implementation into a 3D Finite Element program that can consider stage construction situations are presented. The constitutive model developed allows considering the main design parameters of the problem and only requires geometrical and mechanical properties of the constituents. Additionally, the use of a homogenisation approach implies that the generation of the Finite Element mesh can be easily produced and that re-meshing is not required as basic geometrical parameters such as the orientation of the pipes are changed. The model developed is used to simulate tunnelling with the UARS. From the analyses, the effects of the main design parameters on the elastic and the elastoplastic analyses are considered.

  • PDF

Performance assessment of precast concrete pier cap system

  • Kim, T.H.;Kim, Y.J.;Shin, H.M.
    • Computers and Concrete
    • /
    • 제13권4호
    • /
    • pp.501-516
    • /
    • 2014
  • The purpose of this study was to investigate the performance of precast concrete pier cap system. The proposed precast pier cap provides an alternative to current cast-in-place systems, particularly for projects in which a reduced construction time is desired. Five large-scale pier cap specimens were constructed and tested under quasistatic monotonic loading. The computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology) was used for the analysis of reinforced concrete structures. A bonded tendon element is used based on the finite element method, and can represent the interaction between the tendon and concrete of a prestressed concrete member. A joint element is used in order to predict the inelastic behaviors of segmental joints with a shear key. This study documents the testing of the precast concrete pier cap system under monotonic loading and presents conclusions and design recommendations based on the experimental and analytical findings. Additional full-scale experimental research is needed to refine and confirm design details, especially for actual detailing employed in the field.

아파트 구체공사의 공정관리 및 공기지연요소 분석에 관한 연구 (Analysis of Progress Schedule and Delay Element of Frame Works in Apartments)

  • 최은준;최민권;조형근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.157-160
    • /
    • 2003
  • In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.

  • PDF

Effects of soil-structure interaction on construction stage analysis of highway bridges

  • Ates, Sevket;Atmaca, Barbaros;Yildirim, Erdal;Demiroz, Nurcan Asci
    • Computers and Concrete
    • /
    • 제12권2호
    • /
    • pp.169-186
    • /
    • 2013
  • The aim of this paper is to determine the effect of soil-structure interaction and time dependent material properties on behavior of concrete box-girder highway bridges. Two different finite element analyses, one stage and construction stage, have been carried out on Komurhan Bridge between Elazi$\breve{g}$ and Malatya province of Turkey, over Fırat River. The one stage analysis assume that structure was built in a second and material properties of structure not change under different loads and site conditions during time. However, construction stage analysis considers that construction time and time dependent material properties. The main and side spans of bridge are 135 m and 76 m, respectively. The bridge had been constructed in 3 years between 1983 and 1986 by balanced cantilever construction method. The parameters of soil-structure interaction (SSI), time dependent material properties and construction method are taken into consideration in the construction stage analysis while SSI is single parameter taking into consideration in the one stage analysis. The 3D finite element model of bridge is created the commercial program of SAP2000. Time dependent material properties are elasticity modulus, creep and shrinkage for concrete and relaxation for steel. Soft, medium, and firm soils are selected for evaluating SSI in both analyses. The results of two different finite element analyses are compared with each other. It is seen that both construction stage and SSI have a remarkable effect on the structural behavior of the bridge.

오픈하우징의 구조적 유형화에 관한 연구 (A Typological Approach to Structural Characteristics in Open Housing)

  • 모정현;이연숙
    • KIEAE Journal
    • /
    • 제4권3호
    • /
    • pp.45-52
    • /
    • 2004
  • The purpose of this research was to identify the structural characteristics of open housing typologically and systematically. The main method of this study was content analysis and literature review on open housing. This study found that the typological analysis on terminology and the details of the constituents concerning structural patterns in open housing indicated that the main approaches were classified into three criteria such as 'Organization Element', 'Construction Element', and 'Equipment Element'. Organization Element was classified into 'Main Dwelling Unit Area and its Form', 'Room Organization Method', 'Relationship with the Main Dwelling Unit's External Constituents', and 'Combination Method of Support and Infill'. Construction Element was classified into 'Method of Structure' and 'Structural Element Technology'. Equipment Element was classified into 'Method of Using Duct' and 'Wet Zone Method'. The attributes were determined based on these classifications. The results of this study can be used to construct an evaluation tool and further to develop a framework in understanding open housing. Technical research should be conducted on the variables that affect the flexibility of space.

V-groove 박판의 FCAW와 EGW 공정에 따른 변형에 미치는 공정인자 영향 (Process Parameter Effect on Deformation of a V-groove Thin Plate for FCAW and EGW)

  • 한주호;전재승;박철성;오종인;윤진오;이정수
    • Journal of Welding and Joining
    • /
    • 제31권1호
    • /
    • pp.65-70
    • /
    • 2013
  • Finite element analysis and welding experiments were performed to evaluate deformation aspect for Flux Cored Arc Welding(FCAW) and Electro Gas Welding(EGW). Numerical researches of FCAW and EGW were performed considering the difference of number of welding pass and welding direction to arc flow. To perform the numerical study of FCAW and EGW, number of welding pass and welding direction to arc flow were considered in the finite element model. FCAW process requires multi pass and its welding direction is vertical to welding torch. On the other hand, EGW process requires single pass and its welding direction is parallel to welding torch. The difference of welding direction and heat input was considered in the finite element analysis. In FCAW process, Goldak's double ellipsoidal heat input model was adopted. In the EGW process, Hemi-spherical power density distribution was adopted. In the results of experiment and finite element analysis, angular deformation of FCAW process is larger than that of EGW process.

철도하부 가도교 설치에 대한 JES공법 (Joint Element Structure Method on the Subway Box Structure unere Railroad)

  • 피태희;조국환;사공명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.973-981
    • /
    • 2008
  • This document presents the JES(Joint Element Structure) method that has been adopted for the firs time in our country for the construction of the structure crossing under the railroad without open excavation. Front Jacking Method, Tubular Roof Construction Method, New Tubular Roof Method and Joint Element Structure Method are commonly used for the construction of structures crossing under the railroad. JES Method, frequently used in Japan recently, is a new method to construct the structures crossing under the railroad in a safe manner and in a relatively short period of time by utilizing the steel elements with the joints through which the load in the vertical angle to the axial direction is transferred to the next element. The elements are tied to each other through the joints to form the permanent walls of a Rahmen structure under the road without open excavation and without limitation to the length in a convenient way. Through the case study in the project of a Subway Box Culvert Improvement for the Gyeonguiseon Railroad in front of Yonsei University using the JES Method, the cost and period of construction in various types of soil is investigated compared to the Front Jacking Method. Furthermore, by analyzing the results of instrumentation measurements carried out throughout the construction, comparison between the actual displacement in the ground and the predicted displacement in the design is made to provide the considerations to be counted for the design. In conclusion, comparison in the field of economic feasibility, constructability and safety between the JES Method and Front Jacking Method, which is most frequently adopted in our country at present, is made to present the JES Method as a new alternative for the non-open excavation construction method for the structures crossing under the railway.

  • PDF

Repaired concrete columns with fiber reinforced thixotropic mortar: experimental & FEA approach

  • Achillopoulou, Dimitra V.;Arvanitidou, Konstantinia C.;Karabinis, Athanasios I.
    • Computers and Concrete
    • /
    • 제15권1호
    • /
    • pp.73-88
    • /
    • 2015
  • Following previous studies, the current paper describes the results of an experimental program concerning the repair of reinforced concrete columns by thixotropic pseudo plastic mortar, preformed to analyze and quantify the influence of initial construction damage to the behavior of the repaired element. Five columns (section scale 1:2) were designed according to the minimum requirements of reinforcement of ductility orientated codes' design with variables the percentages of initial construction damages. All were tested in axial compression with repeated cycles up to failure. For comparison reasons, another one of the same characteristics, yet healthy, was constructed and tested as a reference specimen. A numerical study (Finite Element Analysis) was conducted for further investigation of the behavior of the thixotropic mortar as repair material. The results indicate that: a) surpassing a specific amount of damage, columns even suitably repaired present lower strain capacity, b) finite element analysis present the same way of deboning of the repaired material taking into consideration the buckling of the reinforcement bars.

유한요소.경계요소병용법을 이용한 전기자동차용 동기전동기의 개발 및 성능향상에 관한 연구 (Development of the Synchronous Motors for Electric Vehicle and Improvement of the Performance by Hybrid Finite Element and Boundary Element Method)

  • 전우진;;;;전혜정
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제49권3호
    • /
    • pp.159-164
    • /
    • 2000
  • This paper treats the optimization of rotor construction in the permanent magnet synchronous motor (PMSM) for electric vehicle (EV). While the field system of PMSM has generally one magnet per pole, we replace the magnet into plural sub-magnets. The dimensions of each sub-magnet are determined by the concept of pulse width modulation (PWM). By adopting the proposed rotor construction, we can not only reduce the space harmonics of the air-gap field but also provide space for rotor bars (i.e., damper windings) around the direct-axis. From the investigation by hybrid EE-BE (coupled finite element and boundary element) method coupled with both electric circuit and motion equation, we verify that the construction is effective for practical use.

  • PDF