• Title/Summary/Keyword: construction detail

Search Result 769, Processing Time 0.025 seconds

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

A Study on the Noise Characteristics about Equipment Operating under Construction (건설공사 시 장비운영에 따른 소음특성 기초연구)

  • Kim, Nagyoung;Kang, Heeman;Kim, Hongjong;Shin, Yongsuk;Kim, Changyong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.43-49
    • /
    • 2012
  • Noise measurements were performed by distance for major construction equipment. especially, For construction equipment that large width of variations is depending on the type of work, noise measurements were performed by the detail type of work. For a time of quiescent and construction, "A" compensation equivalent noise level (Leq) were measured. Most of the construction equipment and the characteristics of the point source appears to be similar in analyzed noise measurement results.

Priority on Work Improvement for Automation of Ceiling Finishing Work (천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출)

  • Lee, June-Hyuck;Lee, Dongyoun;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

A Study on Solving Triangle Construction Problems Given by a Midpoint of Side and Other Two Points (한 변의 중점과 다른 두 점이 주어진 삼각형 작도문제의 해결에 대한 연구)

  • Han, In-Ki;Lee, Jeong-Soon
    • Journal of the Korean School Mathematics Society
    • /
    • v.12 no.4
    • /
    • pp.365-388
    • /
    • 2009
  • In this paper we solve various triangle construction problems given by three points(a midpoint of side and other two points). We investigate relation between these construction problems, draw out a base problem, and make hierarchy of solved construction problems. In detail we describe analysis for searching solving method, and construction procedure of required triangle.

  • PDF

Application of Parameters-Free Adaptive Clonal Selection in Optimization of Construction Site Utilization Planning

  • Wang, Xi;Deshpande, Abhijeet S.;Dadi, Gabriel B.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.2
    • /
    • pp.1-10
    • /
    • 2017
  • The Clonal Selection Algorithm (CSA) is an algorithm inspired by the human immune system mechanism. In CSA, several parameters needs to be optimized by large amount of sensitivity analysis for the optimal results. They limit the accuracy of the results due to the uncertainty and subjectivity. Adaptive Clonal Selection (ACS), a modified version of CSA, is developed as an algorithm without controls by pre-defined parameters in terms of selection process and mutation strength. In this paper, we discuss the ACS in detail and present its implementation in construction site utilization planning (CSUP). When applied to a developed model published in research literature, it proves that the ACS are capable of searching the optimal layout of temporary facilities on construction site based on the result of objective function, especially when the parameterization process is considered. Although the ACS still needs some improvements, obtaining a promising result when working on a same case study computed by Genetic Algorithm and Electimze algorithm prove its potential in solving more complex construction optimization problems in the future.

An Estimating System for the CO2 Emissions using Discrete Event Simulation (이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템)

  • Yi, Chang-Yong;Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

Efficient Data Structures and Algorithms for Terrain Data Visualization (지형 렌더링을 위한 효율적인 자료 구조와 알고리즘)

  • Jung, Moon-Ju;Han, Jung-Hyun
    • The KIPS Transactions:PartA
    • /
    • v.9A no.4
    • /
    • pp.581-588
    • /
    • 2002
  • In implementing interactive multimedia systems, real-time visualization plays an important role. This paper presents efficient data structures and algorithms for real-time terrain navigation. Terrain data set is usually too huge to display as is. Therefore LOD (levels of detail) methods and view frustum culling are essential tools. This paper describes in detail compact hierarchical data structures, fast view frustum culling, and efficient LOD construction/rendering algorithms. Unlike previous works, we use a precise screen-space error metric for vertex removal and a strict error threshold allowing sub-pixel -sized errors only. Nevertheless, we can achieve 22 fps on average in a PC platform. The methods presented in this paper also satisfy almost all of the requirements for interactive real-time terrain Visualization.

Design and Implementation of a Blockchain System for Storing BIM Files in a Distributed Network Environment

  • Seo, Jungwon;Ko, Deokyoon;Park, Sooyong;Kim, Seong-jin;Kim, Bum-Soo;Kim, Do Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.12
    • /
    • pp.159-168
    • /
    • 2021
  • Building Information Modeling (BIM) data is a digitized construction design by worldwide construction design stands rules. Some research are being conducted to utilize blockchain for safe sharing and trade of BIM data, but there is no way to store BIM data directly in the blockchain due to the size of BIM data and technical limitation of the blockchain. In this paper, we propose a method of storing BIM data by combining a distributed file system and a blockchain. We propose two network overlays for storing BIM data, and we also propose generating the Level of Detail (LOD)-based merkle tree for efficient verification of BIM data. In addition, this paper proposes a system design for distributed storage of BIM data by using blockchain besu client and IPFS client. Our system design has a result that the processing speed stably increased despite the increase in data size.

Necessity of Construction Using Designed Structure (설계된 구조물을 사용한 건설의 필요성)

  • 김덕현;한봉구
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.10a
    • /
    • pp.428-434
    • /
    • 2002
  • Almost all buildings/infrastructures made of composite materials are fabricated without proper design. Unlike airplane or automobile parts, prototype test is impossible. One cannot destroy 10 story buildings or 100 meter-long bridges. In order to realize “composites in construction”, the following subjects must be studied in detail, for his design: Concept optimization, Simple method of analysis, Folded plate theory, Size effects in failure, and Critical frequency Unlike the design procedures with conventional materials, his design should include material design, selection of manufacturing method, and quality control methods, in addition to the fabrication method.

  • PDF

EC Development in China

  • Wang, Guangming
    • International Commerce and Information Review
    • /
    • v.6 no.2
    • /
    • pp.13-21
    • /
    • 2004
  • The paper describes the up going and frustration of electronic commerce development in China during the past ten years. All the changes are classified as EC application trends and the trends on EC supporting environment construction. Later, some problems affecting EC development are raised, and one of them: social credit system construction is discussed in detail. The trends of EC development discussed in the paper are based on the practices in China, but it is generally analogous in the rest of the world.

  • PDF