• Title/Summary/Keyword: construction damage

Search Result 1,899, Processing Time 0.024 seconds

Dispute Mediation Cases and Suggestions for Calculating Compensation for Dust Damage (먼지 피해의 환경분쟁조정 사례 분석과 배상액 산정안 제언)

  • Jeong-Ho Park
    • Journal of Environmental Science International
    • /
    • v.32 no.10
    • /
    • pp.693-701
    • /
    • 2023
  • In this study, we analyzed 82 dust damage dispute mediation cases over the past 5 years and evaluated cases where the probability of damage was verified through dust concentration measurement, modeling prediction, and chemical composition analysis. The cause of dust damage was a construction site, which accounted for most of the damage (97%), and was closely related to the distance from the construction site, total floor area of the construction site, and construction duration. Compensation was decided in only 33% of dust damage cases, and in only 6% (five cases) were damages determined using scientific techniques such as dust measurement, and forecasting. The main criteria for determining compensation were whether administrative measures were taken and evidence of damage in the form of videos and photos. In the future, measuring or model for the amount of dust damage is necessary to determine whether the limit has been exceeded and to revise the standard for calculating compensation through various lines of evidence of dust damage.

Damage controlled optimum seismic design of reinforced concrete framed structures

  • Gharehbaghi, Sadjad
    • Structural Engineering and Mechanics
    • /
    • v.65 no.1
    • /
    • pp.53-68
    • /
    • 2018
  • In this paper, an innovative procedure is proposed for the seismic design of reinforced concrete frame structures. The main contribution of the proposed procedure is to minimize the construction cost, considering the uniform damage distribution over the height of structure due to earthquake excitations. As such, this procedure is structured in the framework of an optimization problem, and the initial construction cost is chosen as the objective function. The aim of uniform damage distribution is reached through a design constraint in the optimization problem. Since this aim requires defining allowable degree of damage, a damage pattern based on the concept of global collapse mechanism is presented. To show the efficiency of the proposed procedure, the uniform damage-based optimum seismic design is compared with two other seismic design procedures, which are the strength-based optimum seismic design and the damage-based optimum seismic design. By using the three different seismic design methods, three reinforced concrete frames including six-, nine-, and twelve-story with three bays are designed optimally under a same artificial earthquake. Then, to show the effects of the uniform damage distribution, all three optimized frames are used for seismic damage analysis under a suite of earthquake records. The results show that the uniform damage-based optimum seismic design method renders a design that will suffer less damage under severe earthquakes.

Bearing Capacity of Geogrid-Reinforced Railroad Ballast (지오그리드로 보강된 철도노반 쇄석기층의 지지력에 관한 연구)

  • 신은철;김두환;이규진;이상조
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.367-374
    • /
    • 1999
  • The selection of geogrid types for the use of reinforced rail roadbed is important in the design of railways. Also, the problem of the construction damage on the geogrid during construction is raised by the field engineers. Therefore, laboratory model tests were peformed to investigate the efficiency of the bearing capacity and construction damage. As a result, it was found that the bearing capacity of the rigid geogrid reinforced railroad ballast shows 1.54 times higher than that of the flexible geogrid reinforced case. In addition, there were no noticeable damage during construction.

  • PDF

Integrated Damage Identification System for large Structures via Vibration Measurement

  • JEONG-TAE KIM;SOO-YONG PARK;JAE-WOONG YUN;JONG-HOON BAEK
    • International Journal of Ocean Engineering and Technology Speciallssue:Selected Papers
    • /
    • v.4 no.1
    • /
    • pp.31-37
    • /
    • 2001
  • In this paper, an integrated damage identification system (IDIS) is proposed to locate and size damage in real structures. The application of the IDIS to real structures includes the measurement of modal responses, the construction of damage-detection models, and the implementation of measurements and models into the damage-detection process. Firstly, the theory of the damage identification method is outlined. Secondly, the schematic and each component of the IDIS are described. Finally, the practicality of the IDIS is verified from experiments on two different bridge-models, a model plate-grider and a model truss.

  • PDF

AN EXPERIMENTAL INVESTIGATION ON MINIMUM COMPRESSIVE STRENGTH OF EARLY AGE CONCRETE TO PREVENT FROST DAMAGE FOR NUCLEAR POWER PLANT STRUCTURES IN COLD CLIMATES

  • Koh, Kyung-Taek;Park, Chun-Jin;Ryu, Gum-Sung;Park, Jung-Jun;Kim, Do-Gyeum;Lee, Jang-Hwa
    • Nuclear Engineering and Technology
    • /
    • v.45 no.3
    • /
    • pp.393-400
    • /
    • 2013
  • Concrete undergoing early frost damage in cold weather will experience significant loss of not only strength, but also of permeability and durability. Accordingly, concrete codes like ACI-306R prescribe a minimum compressive strength and duration of curing to prevent frost damage at an early age and secure the quality of concrete. Such minimum compressive strength and duration of curing are mostly defined based on the strength development of concrete. However, concrete subjected to frost damage at early age may not show a consistent relationship between its strength and durability. Especially, since durability of concrete is of utmost importance in nuclear power plant structures, this relationship should be imperatively clarified. Therefore, this study verifies the feasibility of the minimum compressive strength specified in the codes like ACI-306R by evaluating the strength development and the durability preventing the frost damage of early age concrete for nuclear power plant. The results indicate that the value of 5 MPa specified by the concrete standards like ACI-306R as the minimum compressive strength to prevent the early frost damage is reasonable in terms of the strength development, but seems to be inappropriate in the viewpoint of the resistance to chloride ion penetration and freeze-thaw. Consequently, it is recommended to propose a minimum compressive strength preventing early frost damage in terms of not only the strength development, but also in terms of the durability to secure the quality of concrete for nuclear power plants in cold climates.

A Study on the Realization of Dust Damage Compensation Calculation for the Prevention of Dust Damage in Construction Site (공사장 먼지피해 예방을 위한 먼지피해 배상액 산정 현실화 방안 연구)

  • Kim, Jinho
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.374-385
    • /
    • 2022
  • Purpose: Even if a damage is applied to the dust of the construction site containing the first-class carcinogen, it is dismissed or 5~30% of the amount of noise damage compensation is paid., Because of such loopholes, some construction companies are neglecting the dust management of the construction site, and the damage of the workers and the residents in the construction site continues. Method: The purpose of this study is to examine the problems of the calculation criteria of damage compensation amount of construction site dust, the measurement of dust concentration, the analysis of measurement data (the data of electric signboard measuring device by the mining scattering method), the prediction and evaluation methods such as modeling, and to suggest improvement measures. Result: It is found that it is impossible to calculate the amount of damages from dust damage in the construction site by calculating the current dust damage compensation amount and dust concentration modeling and measurement. Conclusion: It will receive an application for compensation for damage within the site where damage is expected (about 100m in the straight line and the boundary line of the site), and present a method of calculating the amount of compensation that differentially evaluates dust damage to the degree of dust management and compliance with dust-related legal standards.

CONSTRUCTION DELAY IN INTERNATIONAL PROJECTS: WITH SPECIAL REFERENCE TO GULF AREA CAUSES, DAMAGE ASSESSMENTS AND ENTITLEMENTS

  • Sami Fereig;Nabil Kartam
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.758-763
    • /
    • 2005
  • For international projects in general and the projects in the Gulf area in Particular, the most common cause of construction disputes and claims is construction delay. This paper will present different surveys to identify the causes of delay, the parties responsible, and how delay can be avoided. This paper will outline how these factors impact damage assessment and entitlement. Furthermore, a case study will be presented to show how the responsibility and damages due to delay are assessed and how entitlements are calculated.

  • PDF

A Study on the Damage and Problem of Domestic Animals by Noise and Vibration at Construction Site (건설소음진동으로 인한 가축피해현황 및 문제요인고찰)

  • 박찬헌
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.3
    • /
    • pp.30-34
    • /
    • 2000
  • In recent years, disputes are on the increase that noise and vibration by construction equipments and blasting do damage to livestock farming families around construction sites in the construction of a road or a railway. Therefore, the following ways of improvement were presented in solving the existing problems of livestock disputes. $.$ To minimize the damage of livestock farming families by effect assessment of noise and vibration in the region expected to be damaged before the start of construction $.$ To maintain a thorough management system that can reduce noise and vibration during construction work $.$ To apply an adequate measurement method of noise and vibration taking field conditions into consideration

  • PDF

A Basic Study on Reginal Prediction Model for Building Damage Costs acrroding to Hurricane (태풍에 따른 지역별 건물피해액 예측모델 개발 기초연구)

  • Kim, Boo-Young;Yang, Seongpil;Kim, Sang ho;Cho, Han Byung;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.253-254
    • /
    • 2015
  • Currently, according to the climate change, the damages due to the hurricane is more increased than before. In this respect, several countries have been conducted the studies regarding the damage prediction model of buildings to minimize the damages from natural disaster. As hurricane is the complex disaster including a strong wind and heavy rain, to predict the damage of hurricane, various factors has to be considered. However, mostly research has been conducted to consider only hurricane properties. Therefore, the objective of this study is to develop the regression model for predicting damages of buildings considering geography, socio-economy, construction environment and hurricane information. In the future, this study can be utilized to developing damage prediction model for building from hurricane in South Korea.

  • PDF

A Study on Damage Evaluations of Truss for Large Structure Health Monitoring (대형 구조물 상태평가를 위한 트러스 구조물 손상 평가에 관한 연구)

  • Lee, Jong-Ho;Kim, Seon-Gyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.130-131
    • /
    • 2016
  • This study was performed for application of Structural Health Monitoring system of large structures. In order to evaluate damage of a structure, strain data of truss members that are changing with damage are gained by FEM analysis program. These data are used to train Artificial Neural Network(ANN), and this ANN algorithm can be used to analysis strain data for evaluating damage of the truss members.

  • PDF