• 제목/요약/키워드: construction cost creation

검색결과 55건 처리시간 0.023초

초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 - (Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods -)

  • 현동명;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

BUSINESS CREATION BY INDUSTRIALISED BUILDING SYSTEM IN MALAYSIAN CONSTRUCTION INDUSTRY

  • Theong May Chuan
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.407-412
    • /
    • 2011
  • Recently, the Malaysian government had been developing new technologies to the construction industry and one of them is the Industrialised Building System (IBS). The government urged that IBS is 100% utilized in all construction projects. It is believed that the application of IBS helps in reducing construction duration and cost, solving the problems of overflow of foreign workers in the site and improving performance and appearance of a structure. However, there are some parties like the contractor who feel reluctant to utilize this system because there are risks. They worry that their trades will be affected as IBS construct a structure using components which are manufactured in a factory and assemble on site. Therefore, this research is to find out whether IBS benefits the country's economy by focusing on the business created by investing in IBS. A comprehensive supply chain for IBS will be developed to compare with the traditional construction supply chain as to determine businesses or trades created and eliminated. This paper is looking at the theoretical framework about business opportunities due to the Government policy on embarking IBS.

  • PDF

Generating 3D Digital Twins of Real Indoor Spaces based on Real-World Point Cloud Data

  • Wonseop Shin;Jaeseok Yoo;Bumsoo Kim;Yonghoon Jung;Muhammad Sajjad;Youngsup Park;Sanghyun Seo
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제18권8호
    • /
    • pp.2381-2398
    • /
    • 2024
  • The construction of virtual indoor spaces is crucial for the development of metaverses, virtual production, and other 3D content domains. Traditional methods for creating these spaces are often cost-prohibitive and labor-intensive. To address these challenges, we present a pipeline for generating digital twins of real indoor environments from RGB-D camera-scanned data. Our pipeline synergizes space structure estimation, 3D object detection, and the inpainting of missing areas, utilizing deep learning technologies to automate the creation process. Specifically, we apply deep learning models for object recognition and area inpainting, significantly enhancing the accuracy and efficiency of virtual space construction. Our approach minimizes manual labor and reduces costs, paving the way for the creation of metaverse spaces that closely mimic real-world environments. Experimental results demonstrate the effectiveness of our deep learning applications in overcoming traditional obstacles in digital twin creation, offering high-fidelity digital replicas of indoor spaces. This advancement opens for immersive and realistic virtual content creation, showcasing the potential of deep learning in the field of virtual space construction.

인공갯벌 조성에 관한 경제적 타당성 분석 (Analyzing an Economic Feasibility for Restoration/Creation of Artificial Tidal Flats)

  • 남광현;오위영
    • Ocean and Polar Research
    • /
    • 제25권4호
    • /
    • pp.593-601
    • /
    • 2003
  • The purpose of this paper is to investigate economic feasibility of creating artificial tidal flats using cost-benefit analyses. We assumed that the cost factors are associated with designing, construction and monitoring, and the benefit factors are associated with fisheries production, habitation, prevention of disasters, water purification, aesthetic value and existence value. First, for analyzing economic feasibility, the scenario suggests that a design can be made in a year, construction can be completed in three years and monitoring must be made for 20 years. Assuming the discount rate of 7.5%, economic feasibility analyses showed that B/C was 2.26 and IRR was 14.50. This study indicated there is economic validity of implementing creation of artificial tidal flat. In addition, we carried out a sensitivity analysis at the change of discount rate and restoration rate. The result of sensitivity analysis clearly showed that economic validity is low when discount rate is over 15%, and changes in restoration rate did not significantly effect on the economic validity.

건설기술자의 원가관리 업무역량 분석 연구 (An Analysis of Core Competency of Construction Field Engineer for Cost Management)

  • 최재홍;김예상
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.26-34
    • /
    • 2013
  • 최근 많은 기업들이 개개인의 인적자원을 기업 가치 창출의 핵심 자산으로 인식하고, 기업 경쟁력 강화를 위하여 역량기반의 인적자원관리 및 인재육성에 많은 노력을 기울이고 있다. 국내 건설업에서 큰 비중을 차지하고 있는 종합건설회사의 건설기술자는 건설 프로젝트 생애주기의 각 단계에서 다양한 참여주체와 함께 공사관리 업무를 수행하며, 건설기술자의 역량은 건설공사의 성패에 직접적인 영향을 미치는 중요한 요소이다. 하지만 현재 국내의 건설기술자 능력 평가 방식은 자격 위주의 평가로서 실제 공사관리 업무에 대한 소화능력과는 거리가 있다. 이와 같은 관점에서 본 연구는 건설업의 기본관리 항목 중 하나인 원가관리의 업무 프로세스 및 세부 수행항목을 분석하여 원가관리 업무 숙련도 수준을 제시하였고, 이를 바탕으로 건설기술자 직급별 요구역량 대비 현 수준 분석 및 업무 단계별 건설기술자 업무역량 분석을 실시하여 시사점을 도출하였다.

Designation of Landmark Buildings for Cultural Facilities in South Korea: Focusing on the Total Project Cost Management System and Related Policy Cases

  • Hee Jae Lee;Hong Gyu Kim
    • Architectural research
    • /
    • 제26권3호
    • /
    • pp.63-72
    • /
    • 2024
  • Due to budgetary constraints, national landmarks symbolic of country's power and cultural stature face significant limitations in their creation. Within the current total project cost management system, there are considerable restrictions on constructing cultural facilities with various forms and designs, and there exists a societal need for a design-first administrative system for public buildings that demand artistry and symbolism. This study explores the potential and limitations of applying exceptions to the total project cost management system through the designation of representative artistic architecture. It discusses directions for the implementation of government-level systems. To this end, a literature review on budget management and national project management was conducted, and an analysis of related policy cases both do-mestically and internationally was performed to select applicable examples and consider their implications for policy utilization within the domestic context. The results discuss the necessity of public art building construction, the issues with construction budgets, and the in-volvement of world-class architects. Analytical implications include the need for realistic budget setting for construction projects, establishing clear promotion criteria, and creating a phased process and expert evaluation panel.

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • 인간식물환경학회지
    • /
    • 제22권5호
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

BIM 기반 비선정 작업항목 물량산출 방법에 관한 연구 (Quantity Takeoff for Non-Selection Work Items based on BIM)

  • 박상헌;윤선재;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2019
  • Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.

  • PDF

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

도로교차로 설계VE 경진대회 사례분석 (The Case Analysis on the Road-Crossroad Design VE Competition)

  • 김기한;김병수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.839-842
    • /
    • 2008
  • 건설VE는 건설시설물의 성능을 제고하고 생애주기비용을 절감하고자 도입된 제도로서 2005년 12월 100억 이상건설공사에 확대 적용된 이래로 건축 및 토목공사에 널리 활용되고 있다. 그러나 아직 국내에는 VE전문가가 부족한 실정이고 VE를 통한 가치창출의 극대화라는 VE본연의 목적보다는 예산절감을 위한 도구로서의 인식이 더 강한 실정이다. 본 연구에서는 도로공사 중 교차로 설계VE경진대회 사례를 대상으로 국내에서 가장 널리 활용되고 있는 Job Plan에 의한 VE절차의 충실도와 VE성과를 분석함으로써 향후 설계VE의 질적향상에 기여하고자 하였다.

  • PDF