• Title/Summary/Keyword: construction control

Search Result 5,207, Processing Time 0.033 seconds

CNC Twisted Tube Method for 3D Coordinate Control Technology for Freeform Structure -Focused on The ARC in DaeGu- (비정형구조의 3차원 좌표제어를 위한 CNC Twisted Tube 공법 적용 -대구 대표물문화관(The ARC)를 중심으로-)

  • Ryu, Han-Guk;Kim, Sung-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.434-440
    • /
    • 2013
  • Generally, the envelope of a freeform building is composed of a structure made with rectangular or C-shaped steel pipe, and steel or aluminum panel finishes on the structure. However, these construction methods increase material loss and cost and time. There are also numerous cases of misunderstanding of design and difficulties in construction, which frequently cause construction errors. Such construction errors decrease construction productivity, resulting in poor construction quality and the need for rework, as well as cost and time overruns. To solve the problem, this study proposes a 3D coordinate control technology for freeform structure implemented through a CNC(Computerized Numerical Control) Twisted tube method, and by extension, develops a BIM-based envelope construction method for freeform building.

3-D Graphical Model-Based Design and Control of Automated Equipment (3차원 그래픽 모델에 근거한 자동화 장비의 설계 및 조종)

  • Seo Jongwon;Haas Carl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.188-191
    • /
    • 2002
  • This paper concerns 3-D graphical modeling and simulation techniques for design and control of automated equipment for construction and facility maintenance. A case study on the use of 3-D graphics techniques for developing a power plant maintenance robot is presented. By simulating equipment operation within the 3-D geometry models of the work environment the environment design was improved. The 3-D graphical models of the equipment and the work environment were further utilized for the control of the robot from a remote distance. By presenting the real-time updated equipment configuration and the work environment to the operator, the graphical model-based equipment control system helped the operator overcome the problems associated with spatial perception. The collision between the robot and the plant structures was also avoided based the real-time analysis of the dynamically updated graphical models.

  • PDF

Active mass damper control for cable stayed bridge under construction: an experimental study

  • Chen, Hao;Sun, Zhi;Sun, Limin
    • Structural Engineering and Mechanics
    • /
    • v.38 no.2
    • /
    • pp.141-156
    • /
    • 2011
  • A cable stayed bridge under construction has low structural damping and is not as stable as the completed bridge. Control countermeasures, such as the installation of energy dissipating devices, are thus required. In this study, the general procedure and key issues on adopting an active control device, the active mass damper (AMD), for vibration control of cable stayed bridges under construction were studied. Taking a typical cable stayed bridge as the prototype structure; a lab-scale test structure was designed and fabricated firstly. A baseline FEM model was then setup and updated according to the modal parameters measured from vibration test on the structure. A numerical study to simulate the bridge-AMD control system was conducted and an efficient LQG-based controller was designed. Based on that, an experimental implementation of AMD control of the transverse vibration of the bridge model was performed. The results from numerical simulation and experimental study verified that the AMD-based active control was feasible and efficient for reducing dynamic responses of a complex structural system. Moreover, the discussion made in this study clarified some critical problems which should be addressed for the practical implementation of AMD control on real cable-stayed bridges.

Rapid Local Modeling in Construction Automation

  • Kwon Soon-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.173-179
    • /
    • 2003
  • Techniques to rapidly model local spaces, using 3D range data can enable implementation of: (1) real-time obstacle avoidance for improved safety, (2) advanced automated equipment control modes, and (3) as-built data acquisition for improved quantity tracking, engineering, and project control systems. The objective of the research reported here was to introduce current rapid local modeling techniques and develop rapid local spatial modeling tools.

  • PDF

Improve waterproof methods of construction, materials and design to control leakage of underground structure in Singapore (싱가포르 지하구조물 누수에 따른 시공, 재료, 설계 개선방안에 관한 연구)

  • Kim, Dae-Geon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.9-10
    • /
    • 2016
  • The recent situation in the domestic construction companies with a presence in Singapore and pay a lot of money due to leaks underground structuredefects. Therefore, understanding these root causes and to prevent the construction, and to study the materials, design the improvement plan.

  • PDF

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

Method Development of Location Point Control For Freeform Metal Panel Installation - Focused on the Application of LH JinJu New Office- (비정형 금속패널 설치를 위한 지점 제어 공법 개발 -LH 진주 신사옥 적용을 중심으로-)

  • Kim, Sung-Jin;Kim, Chung-Shik;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.258-259
    • /
    • 2013
  • Recently, architectural design has been changing from formal design to freeform design due to the digitalization of construction industry. Especially, the formal design has been accepted as a design trend recently and applied many times as a design concept in the architectural design competitions such as turn-key. However, various deflects such as water leak and cracks have been occurred because the traditional construction methods had been applied without any revision or adaptation of the formal construction method for the freeform building construction. Therefore this research proposes location point control method for freeform metal panel installation which is focused on the application of LH JinJu new office.

  • PDF