• Title/Summary/Keyword: construction control

Search Result 5,209, Processing Time 0.034 seconds

Experimental Study on Effect on Prey Survival by Juvenile Fish Shelter (JFS) under Pressure by Piscivorous Fishes (포식압력 하에 치어 보호 구조물이 피식자의 생존율에 미치는 영향에 관한 실험적 연구)

  • Ahn, Chang Hyuk;Joo, Jin Chul;Lee, Saeromi;Ahn, Hosang;Park, Jae-Roh;Song, Ho Myeon
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.6
    • /
    • pp.746-753
    • /
    • 2013
  • The aim of this study was to evaluate artificial fish shelter, which was known to increase prey survival and expand habitat space to improve species diversity and fish communities in a freshwater ecosystem. The experiment was performed at an outdoor test-bed for three months from 2011 by comparing the responses to adjustments in the volume of the artificial patch (juvenile fish shelter, JFS) in the control and experimental groups. Analysis of the environmental conditions over two periods (Period1 ~ 2) showed minor differences in the physichemical characteristics of water quality, phytoplankton, and zooplankton biomass, thus, allowing comparative analysis of feeding ecology. However, high water temperature conditions in Period1 ($25.6{\pm}2.0^{\circ}C$), affected the predation activity of the piscivorous fishes, Coreoperca herzi (C. herzi, size $89{\pm}4mm$). Survival rates of the prey fishes, Rhynchocypris oxycephalus (R. oxycephalus, size $29{\pm}1mm$), improved as the patch volume increased and were higher than those of the control group by 35.9 ~ 46.7%. Analysis showed that JFS reduced the chances of predator-prey encounter, and thereby minimized prey vulnerability.

Institutional and Technical Improvement Measures to Facilitate the Use of Smart Construction Safety Technology (스마트 건설안전 기술 도입 촉진을 위한 제도적⋅기술적 개선 방안에 관한 연구)

  • Jaehyun Jeong;Sang I. Park;Hyungtaek Sim;Yuhee Kim
    • Journal of the Korean Society of Safety
    • /
    • v.39 no.1
    • /
    • pp.41-54
    • /
    • 2024
  • Efforts to reduce on-site safety incidents have expanded, leading to active research in this domain. However, a systematic analysis to improve the utility of technology is lacking. In this study, we conducted a survey on the various institutional and technical improvement measures to promote the application of smart construction safety technology over three years after the implementation of the "Smart Safety Equipment Support Project." The results showed that financial constraint was the primary obstacle in the adoption of this innovation. Fostering a flexible environment in the utilization of management fees and financial support of projects was determined to aid in the extensive application of the technology. Ensuring cost efficiency and user-friendliness were principally necessary for technical enhancements in the smart construction safety technology. Technologies, such as VR/AR safety education, real-time location tracking, wearable devices, and innovation on streamlining safety-related work efficiency, had been anticipated to contribute to on-site safety. Operating a smart safety control center was expected to be beneficial in the systematic securing of data and reduction of safety blind spots. Effective methods had been suggested to overcome the barriers that hindered the development and application of smart construction safety technology. This study facilitates in the technological improvements in this field.

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

Attributes for Developing a Database for Construction Information Interface

  • Moon, Sungwoo;Cho, Kyeongsu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.673-673
    • /
    • 2015
  • Earthwork is an operation that provides space for structures, and it takes up a large portion of the construction costs in a construction project. In large-scale earthwork, numerous types of construction equipment are used in the operation. The types of equipment should be selected based on the field conditions and the construction methods. These construction vehicles are constantly changing positions during the earthwork operation. Therefore, the equipment operators require effective communication to ensure the efficiency of the earthwork operation. All equipment operators should exchange information with the other equipment operators. Information should be exchanged continuously to support decision making and increase productivity during the earthwork operation at the construction site. This paper investigates the attributes required for an information interface between construction vehicles during an earthwork operation. This paper 1) discusses the importance of an information interface for construction vehicles in order to increase productivity during an earthwork operation, 2) analyses the types of attributes that need to be communicated between construction vehicles, and 3) provides a database that has been built for attribute control. The database built for the information interface between construction vehicles will enhance communication between vehicle operators. Table I shows the typical attributes that should be shared between the excavator operator and the dump truck operator. This information needs to be shared among the operators, as it helps them to plan the earthwork operation in a more efficient manner. A database has been developed to store this information in an entity relation diagram. A user-interface display environment is also developed to provide this information to the operators in the construction vehicles. The proposed interface can help exchange information effectively and facilitate a common understanding during the earthwork operation. For example, the vehicle operators will be aware of the planned volume, excavated volume, transportation time, and transportation numbers. As a part of this study, mobile devices, such as mobile phones and google glasses, will be used as hands-on communication tools.

  • PDF

Direction and Strategy of Experts-Knowledge Management System Development for Enhancing CM Services (CM업무 고도화를 위한 전문가 지식관리 시스템 개발 방향 및 전략)

  • Kim, Sun-Kuk;Kim, Ah-Young
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.63-70
    • /
    • 2007
  • Construction managers who are placed on the top of the construction production organization should exhibit its best knowledges concerning all aspects and control related members at every position properly. In case of CM firms in developed countries, they are equipped with a practical system of technology and management knowledge, and efficiently use the knowledge not only for novices but also experts. However, the domestic CM firms which are now at the lower level than those in developed country are not supported with the sufficient and systematic knowledge for CM tasks due to various reasons. Therefore, the objective of this study is to suggest the direction and strategy for the development of an experts-knowledge management system to enhance the construction productivity at the viewpoint of CM firms which conduct, manage and supervise various tasks of construction projects. Domestic CM firms would play a great role to enhance productivity and secure competitive advantage of project management as much as the firms in developed countries if experts-knowledge and information are supported by a computerized system.

A Study on the Safety Consulting for improving the Construction Safety System (건설안전시스템 향상을 위한 안전컨설팅 연구)

  • Jo, Jaeh-Wan;Yun, Jun-Seon;Han, Gwan-Gil
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.49-53
    • /
    • 2013
  • If industrial safety statistics are analyzed, among the total of 2,114 dead people from industrial disasters in 2011, construction workers took 29.4% with 621. The construction industry makes a lot of efforts to reduce the death toll. However, since the measures are not from the analysis of root causes but from superficial countermeasure plans near general matters, it is in a situation that the actual effectiveness is marginal. Therefore, in this paper, improvement measures were intended to be prepared in order to reduce accidents, by inspecting safety control systems of target companies with high accident rates among major construction firms and extracting overall problems of them.

The Development of Cloud Computing-Based Integrated EHS Management System for the Construction Companies (클라우드 컴퓨팅 기반 건설사용 EHS 통합관리시스템 개발)

  • Seo, Kwang-Kyu
    • Proceedings of the KAIS Fall Conference
    • /
    • 2010.11b
    • /
    • pp.859-861
    • /
    • 2010
  • The construction companies are facing potential EHS(Environment, Health & Safety) of major accidents to cause casualties or a financial loss and increasing social responsibility. So, they have to voluntarily accomplish the EHS management system rather than passively with regard to EHS regulation. In this study, the integrated EHS management system is developed based on cloud computing, and construction companies are to materialize self-regulation EHS process of construction workplace and to standardize the total EHS business process using the developed system. The proposed system also provides risk analysis, education/control and continuous improvement for EHS tasks and users can easily access the system on the web at a low price through cloud computing service. Eventually, the integrated system contributes to the managerial improvement by minimizing economic and physical loss caused by construction accidents.

  • PDF

Productivity Measurement and Analysis on Factors in Steel Erection (철골세우기의 현장생산성 측정 및 영향요인 분석)

  • Lee, Ji-Yong;Huh, Young Ki;Ahn, Bang Ryul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.123-127
    • /
    • 2008
  • As buildings becoming higher and more enormous the portion of steel works has been increased, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

  • PDF

A Study on the Analysis of Causes for Fatal Accident in Construction Works (건설공사의 중대재해 원인분석에 관한 연구)

  • 박종근
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.4
    • /
    • pp.122-133
    • /
    • 1997
  • Various types of fatal accidents are increasing in Korean construction work site. Simply repeated and conventional accidents as well as new types of potential hazards which are caused by large-scaled work, complexity and negligence of temporary structures in construction are increasing, so that analysis of fundamental causes are necessary to control the construction accidents. In this study 739 fatal accidents are informally classified by the types of work and work process. The classified items which are based on ANSI Z 16.2, are modified adapted to the construction fields and are given code numbers and are analyzed by the data-base program. The exact causes of various types of accidents are analyzed by the accident types, agencies and hazardous conditions and through the Cross-tabulation method in order to find out the cause between relevant accidents.

  • PDF