• Title/Summary/Keyword: construction control

Search Result 5,207, Processing Time 0.031 seconds

An Experimental Study for Establishment of On-Site Quality Control of Repair Material by the mechanized construction (기계화시공에 의한 보수재료의 현장품질관리확립을 위한 실험적 연구)

  • Cho Bong Suk;Jang Jae Bong;Kim Yong Ro;Kang Suk Pyo;Hong Sung Yun;Kim Moo Han
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.160-163
    • /
    • 2004
  • In domestic, various repair materials and method systems to keep up with these reinforced concrete deteriorated due to salt damage, carbonation, chemical decay et. developed and applied. However, on-site quality control of various repair materials and method systems isn't achieved desirably because it is depend completely on a men of experience' opinions above all else regardless of various on-site environments. In this background, mock up test with due regard to real on-site environments was performed to secure fundamental data for establishment of desirable on-site quality control. Mock up test using repair mortar analyzed from angles of construction methods, mechanical spraying pressures, W/M. Construction methods were designed manpower method and spraying method, spraying pressures were designed 32, 42, 52 psi, W/M were designed 14.4, 15.4, $16.4\%$. And compressive strength, Chloride ion diffusion coefficient, bond strength, SEM. of mock up test specimens were evaluated. In conclusion, we confirmed excellency of mechanical spraying pressures, fined extremely excellency of condition of spraying pressure 42 ps, W/M $14.4\%$ within this study. therefore the results of this study will be useful to provide fundamental data for establishment of desirable on-site quality control.

  • PDF

Study of Aerial Fire Line Construction and Suppression Method on Forest Fire (산불 공중진화 방화선 구축형태 및 진화방법에 관한 연구)

  • Bae, Taek-Hoon;Lee, Si-Young
    • Fire Science and Engineering
    • /
    • v.24 no.5
    • /
    • pp.26-31
    • /
    • 2010
  • In this study, attack process and aerial control line construction type which were considered forest fire type and a case of operations were suggested using the experience of aerial fire attack of all type of forest fires. As the spread rate of forest fire is effected by terrain, slope, wind speed, forest species and etc., we needed to analyze spreading direction, behavior type and intensity before heli-team constructed a aerial control line. Especially, It is important to consider safety of attack team as a their views were obstructed. In this study, we suggested a 13 methods from type A to type M about attack and construction of aerial indirect control line.

Control effect and mechanism investigation on the horizontal flow-isolating plate for PI shaped bridge decks' VIV stability

  • Li, Ke;Qian, Guowei;Ge, Yaojun;Zhao, Lin;Di, Jin
    • Wind and Structures
    • /
    • v.28 no.2
    • /
    • pp.99-110
    • /
    • 2019
  • Vortex-Induced-Vibration (VIV) is one kind of the wind-induced vibrations, which may occur in the construction and operation period of bridges. This phenomenon can bring negative effects to the traffic safety or can cause bridge fatigue damage and should be eliminated or controlled within safe amplitudes.In the current VIV studies, one available mitigation countermeasure, the horizontal flow-isolating plate, shows satisfactory performance particularly in PI shaped bridge deck type. Details of the wind tunnel test are firstly presented to give an overall description of this appendage and its control effect. Then, the computational-fluid-dynamics(CFD) method is introduced to investigate the control mechanism, using two-dimensional Large-Eddy-Simulation to reproduce the VIV process. The Reynolds number of the cases involved in this paper ranges from $1{\times}10^5$ to $3{\times}10^5$, using the width of bridge deck as reference length. A field-filter technique and detailed analysis on wall pressure are used to give an intuitive demonstration of the changes brought by the horizontal flow-isolating plate. Results show that this aerodynamic appendage is equally effective in suppressing vertical and torsional VIV, indicating inspiring application prospect in similar PI shaped bridge decks.

Traffic-induced vibrations at the wet joint during the widening of concrete bridges and non-interruption traffic control strategies

  • Junyong Zhou;Zunian Zhou;Liwen Zhang;Junping Zhang;Xuefei Shi
    • Computers and Concrete
    • /
    • v.32 no.4
    • /
    • pp.411-423
    • /
    • 2023
  • The rapid development of road transport has increased the number of bridges that require widening. A critical issue in the construction of bridge widening is the influence of vibrations of the old bridge on the casting of wet joint concrete between the old and new bridges owing to the running traffic. Typically, the bridge is closed to traffic during the pouring of wet joint concrete, which negatively affects the existing transportation network. In this study, a newly developed microscopic traffic load modeling approach and the vehicle-bridge interaction theory are incorporated to develop a refined numerical framework for the analysis of random traffic-bridge coupled dynamics. This framework was used to investigate traffic-induced vibrations at the wet joint of a widened bridge. Based on an experimental study on the vibration resistance of wet joint concrete, traffic control strategies were proposed to ensure the construction performance of cast-in-site wet joint concrete under random traffic without interruption. The results show that the vibration displacement and frequency of the old bridge, estimated by the proposed framework, were comparable with those obtained from field measurements. Based on the target peak particle velocity and vibration amplitude of the wet joint concrete, it was found that traffic control measures, such as limiting vehicle gross weight and limiting traffic volume by closing an additional traffic lane, could ensure the construction performance of the wet joint concrete.

KOREAN CONSTRUCTION JOB MARKET FORECAST FOR CIVIL/ARCHITECTURAL ENGINEERS

  • Hwan Pyo Park;Myung Jin Chae;Minwoo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.952-955
    • /
    • 2005
  • In the early 90's, we had serious shortage of construction engineers in Korea. The shortage was acute especially in construction quality control and supervision area, which were gaining social attention due to the road bridge and the department store collapse that took the hundreds of lives in the early 90's in Seoul, Korea. In order to meet the high demand of construction engineers, the engineering license regulations were changed in 1995. Engineers who did not pass the written exam but have equivalent working experience are given engineering license to practice engineering legally. Since year 2000, while the severe engineer-shortage has been resolved, the opposite situation has occurred: there is serious over-supply of construction engineers. Policy makers and engineering practitioners are agreed to bring back the old-fashioned written exam engineer licensing system like before 1995, i.e., no more written exam exemption. However, the engineers who obtained license without taking written exam may not want to go back to old policy which would take their license. It is required to provide appropriate grace period before the new policy takes effect to minimize the impact of the changes. This paper forecasts the supply-demand of construction engineers providing the basis for the most appropriate policy changes.

  • PDF

A Study on the Thermal Crack Control of Foundation for Large Turbine (대형 터빈 기초 구조물의 온도균열 제어에 관한 연구)

  • Ha, Ju-Hyung;Cho, Yun-Gu;Lee, Kewn-Chu;Lim, Chang-Keun
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.3
    • /
    • pp.287-297
    • /
    • 2014
  • Heat of hydration of mass concrete is one of the most important factors that significantly affect structural quality and construction period. Therefore, appropriate methods to control heat of hydration are essential technologies for mass concrete construction. In this study, probability of thermal cracking was checked by thermal analysis prior to the construction of a turbine foundation in a domestic power plant. Subsequently, changes of concrete mix proportion and an effective curing method were proposed to control heat of hydration of mass concrete structures. Concrete manufactured by slag cement was proposed instead of concrete produced by ordinary Portland cement, and an automated curing method was proposed to improve the curing method using typical moist curing with blanket. The automated curing method maintains the temperature difference between center and surface of concrete below a setting value by temperature monitoring. Concrete with slag cement was used for actual construction. One of two identical turbine foundations was cured by an insulated curing method, and the other was cured by the automated curing method to compare the curing methods. And then, the effects of control of heat of hydration were evaluated based on temperature/strain monitoring and crack investigations.

A Study on Improving Concrete Quality Control using Customized Checklist (맞춤식 체크리스트를 응용한 콘크리트 품질관리 개선방안)

  • Park Sangmin;Kim Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.53-62
    • /
    • 2000
  • A concrete element is obtained through multi-steps, and its quality is affected by site conditions and control constituents of procedures. In these regards, in order to assure designed qualities of concrete and associated materials of the element good quality control method is necessary in various procedures. The existing quality control measures do not satisfy the requirements for the quality control activities at each production step. This study provides a more effective checklist for each phase of concrete work, which improves existing quality control checklist through extensive research on current practices and surveys from expertises. This paper also proposes the application of multi-facet codes to develop a customized checklist to improve the efficiency in field practices and the effectiveness in assuring the designed performance of concrete. This study finally provides a more effective checklist for each phase of concrete work by improving usability of the developed project sensitive matric quality control checklist through application experiments on construction project sites.

  • PDF

A Fundamental Research for Adaptation Method of SCM in Korean Nuclear Power Plant Construction (원전 건설공사를 위한 공급망관리체계 적용방안에 대한 기초연구)

  • Park, Hang-Soon;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.229-231
    • /
    • 2012
  • The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.

  • PDF

An Analysis on Optimal Type and Core Technologies for Construction Automation System (건설 자동화 시스템의 적정 유형 및 핵심요소기술 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.140-141
    • /
    • 2016
  • Dynamic nature and diverse requirements on construction sites make the automation technology harder to be employed actively. In this study, we analyzed optimal type of automation system and importance of core technologies for developing efficient construction automation system on 11 construction operations. As a result, it showed that man-machine cooperation system may be the most suitable for most operations, while autonomous robot will be best suited in hard working environment such as maintenance of exterior wall. In elemental technology, ease and accuracy of control and operation showed higher priority than others regardless of automation system type. These findings will provide useful information for developing the construction automation system.

  • PDF

An Analysis of Classification and Causes for Construction Waste of Apartment Building Projects (공동주택 건축공사의 공종별 폐기물의 종류와 발생원인 분석)

  • Seo, Jong-Min;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.5
    • /
    • pp.127-133
    • /
    • 2007
  • Each year the amount of construction wastes increases at a rapid pace. Particularly, wastes from apartment housing projects that make up 89.14% of the total construction projects have increased about 48% as compared with those of the year 2000. Construction wastes are therefore rising as an issue related to environmental problems and disposal costs. And there are ongoing studies of the disposal, control and recycling of construction wastes. Mitigation measures for the wastes, however, have been a rare subject of research that focuses on waste-generating factors by activity during apartment housing projects. Given that, the purpose of this study was to categorize construction wastes by work type and to identify the factors causing wastes in order to reduce them. This study investigated the amount of the wastes from apartment housing constructions by activity as related to disposal costs, and examined causes in the ordering, transport, material management and construction stage, respectively. The analysis results will likely bring about expectation effects that help reduce the generation of the wastes by establishing action plans.