• Title/Summary/Keyword: construction Schedule Risk

Search Result 81, Processing Time 0.024 seconds

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

The Construction Management Plan of Dong Myoung Service Area (동명휴게소 건설사업관리 수행계획)

  • In Chi-Sung;Kim Jeong-Won;Jung Soon-Gil;Park Gwon-su;Lee Sung-Gak;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.40-47
    • /
    • 2003
  • The main purpose of Construction Management(CM) is the improvement of efficiency and effectiveness of the project with construction methodologies systematically and technically. This pilot project Dong Myeong Service Area and Gas Station project among 5 projects designated and supervised by Ministry of Construction and transportation(MOCT), is to reduce cost, to maintain and control schedule, to keep proper quality, Claim and Risk through Partnering, Design Review, Constructability, Value Engineering and Project Management Information System(PMIS) and so on. Major factors of CM Plan are introduction of the phased and classified Construction Management Services from initiation of project to completion and adaptation of CM technologies and guide the implementation methodologies of the CM Pilot Project in CM construction market.

  • PDF

Probabilistic Project Duration Estimation by Combination of PERT and PLET in High-Risk Project (고위험 사업에서 PERT와 PLET기법 결합에 의한 확률적 사업공기 추정)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • PERT(Project Evaluation and Review Technique) is typical method in order to probabilistically establish the schedule plan for large scale complex project or mega project. PERT technique is impossible to estimate relationship of each activity probabilistically when there are overlapping relationships because it is limited to Finish-to-Start(FS) relationship. In order to overcome this kind of limitation of PERT technique, PLET(Probabilistic Linkage Evaluation Technique) has been suggested to probabilistically estimate project duration for various overlapping relationships for each activity. However, estimating project duration by PLET technique only considers uncertainty of relationship between activities and not activity time, thus it is not the perfect duration estimating method. The main objective of this research is to propose the integration model of PERT and PLET and verify its probabilistic validity. By verifying application of time calculation method of integration model in practical case, this research will suggest probabilistic project duration estimating method in schedule plan of high-risk construction industry.

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.

A Study on the Gate Review of Small and Medium-Sized Plants (SE 프로세스를 적용한 플랜트의 게이트 리뷰 프로세스 발전 방안)

  • Jin Il, Kim;Choong Sub, Yeum;Joong Uk, Shin;Sang Bae, Lee
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.2
    • /
    • pp.24-39
    • /
    • 2022
  • For the success of the plant project, it is necessary to review the project's progress through technical and business reviews at an appropriate time, such as design and construction, and determine whether to invest or to proceed with the project to manage risks. In particular, since the plant development projects are not mass-produced, trial and error in design and construction can have severe impacts in terms of cost and schedule. To this end, gate reviews are currently being conducted in plants and other industrial sectors, but there are few studies on how to conduct gate reviews suitable for the plant field. In addition, there is little literature to refer to when conducting gate reviews. So, in this study, we present an overall framework that includes the types of gate reviews to be performed and items to be checked in each gate review on small and medium-sized plant development projects in which the owner directly develops and operates plants.

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

A Study on Prevention of Major Accidents Through Utilization of Fall-Preventing Safety Installations (재해율의 예측에 의한 강구조공사의 중대재해 예방에 관한 연구)

  • 손기상;정경운
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.4
    • /
    • pp.221-229
    • /
    • 1998
  • This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.

  • PDF

SaaS-based construction process transfer and Safety Management System (SaaS기반의 건설공정전송 및 안전관리 시스템)

  • Kim, Eui-ryong;Jung, Soo-Sung;Kim, Young-Gon
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.735-737
    • /
    • 2015
  • In this paper, SaaS (Software as a Service) based transport and construction process safety management systems by utilizing the construction work process management and safety management and schedule, and results for various types of construction process, achieved through high-speed wireless Internet access by applying to ensure a systematic means for safety and can quickly and accurately manage all made within the process control system. The operator should be indicated by using a smart phone to work as a supervisor report the current status and results of the operation. Also be reported to the supervisor immediately in an emergency situation and there is no vibration occurs over a period of time the smartphone is to check the danger to the operator. If the commissioner is directed to specific business processes that establish and verify the results obtained and the result is satisfied by presenting the part down the measures insufficient command of the field workers risk situations. In the case of software (server) to store all the data relating to the operation member in charge of management and security.

  • PDF

A parametric study on the use of passive fire protection in FPSO topside module

  • Friebe, Martin;Jang, Beom-Seon;Jim, Yanlin
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.4
    • /
    • pp.826-839
    • /
    • 2014
  • Fire is a continuous threat to FPSO topside modules as large amounts of oil and gas are passing through the modules. As a conventional measure to mitigate structural failure under fire, passive fire protection (PFP) coatings are widely used on main structural members. However, an excessive use of PFP coatings can cause considerable cost for material purchase, installation, inspection and maintenance. Long installation time can be a risk since the work should be done nearly at the last fabrication stage. Thus, the minimal use of PFP can be beneficial to the reduction of construction cost and the avoidance of schedule delay. This paper presents a few case studies on how different applications of PFP have influence on collapse time of a FPSO module structure. A series of heat analysis and thermal elasto-plastic FE analysis are performed for different PFP coatings and the resultant collapse time and the amount of PFP coatings are compared with each other.