Proceedings of the Korea Contents Association Conference
/
2006.11a
/
pp.312-316
/
2006
Todays many image digital media are in existence. Image digital media are connecting communication closely between receiver and transmitter. Development of image digital media enabled intensive image communication through internet and communicative media. Development of these image digital media brought visual information transmission and time reduction. Image digital media is connecting producers and consumers as indirect intermeditation called advertisement. Development of image digital media made field called motion graphic. Development of motion graphic made a lot of image technique and effect to enable. These ads. images are also operating or performing sensitive-communication by stimulating desire of consumers. An investigator in this study will be in search of an effect and an operation that motion graphic as a field of image expression technique gives insentive communication through an intance investigation.
Recently, the occurrences of electrical fire have been suppressed by a residual current protective devices(RCD), a molded case circuit breaker(MCCB) and a fuse in case of an earth leakage, a short circuit and an over current. But it is impossible for the RCD to break the circuit in the case of the conductor fractures, the failure of pressure contacts on connecting points and the momentary short circuit of low voltage wiring. Therefore, it is require to study the constructive problem of the RCD. In this paper, we have tested the operation characteristics of the RCD according to the R load and R-L load in the conductor fractures, the failure of pressure contacts on connecting points and the momentary short circuit of low voltage wiring.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.58
no.4
/
pp.541-545
/
2009
This study evaluated the contact resistance, insulation resistance, withstand voltage characteristics and insertion force, etc., of the wire connector used inside an integrated LITE WAY lighting fixture developed for efficient installation. Since the connector connecting the lighting fixture's internal wires is housed, it is easily connected and separated and has a structure enabling a close-fitting connection. The temperature and time applied to the high temperature characteristics test of the connector are $105^{\circ}C$ and 16 hours, respectively. The measured contact resistance of the high temperature tested connector was 3.258 mV/A, and its measured insulation resistance was greater than $10\;G{\Omega}$ All specimens demonstrated uniform insulation characteristics, which could be seen to be in good condition. From the withstand voltage test results found before and after performing the high temperature operation test on the connector for cable connection, it was confirmed that the withstand voltage characteristics between all terminals were good. The insertion force of the connector connecting the internal wiring averaged 9.67 kgf. It was observed that the insertion force between the plug housing and the female terminal, and that between the plug housing and the male terminal, were 0.680 kgf and 1.27 kgf on average, respectively.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.7
/
pp.67-75
/
2013
In this paper, parallel input/serial output dual converter is designed appropriately for fuel cell hybrid power system. In case of proposed converter, zero voltage switching condition is designed without additional resonance device using leakage inductance of transformer and output capacitance of switch, and zero voltage switching method is used. Also, the system method is for increasing power by connecting half-bridge in parallel and increasing output voltage by connecting secondary output of transformer in serial. Through this method we can increase power and decrease volume of system. So in this paper, dual converter is designed. 1.5kW fuel cell hybrid power system was implemented, and system operation and stability was verified through experiment.
There are now many different commercial weather sensors suitable for smart farms, and various smart farm devices are being developed and distributed by companies participating in the government-led smart farm expansion project. However, most do not comply with standard specifications and are therefore limited to use in smart farms. This paper proposed the connecting structure of operating non-standard node devices in smart farms following standard specifications supporting smart greenhouse. This connecting structure was proposed as both a virtual node module method and a virtual node wrapper method. In addition, the SoftFarm2.0 system was experimentally operated to analyze the performance of the implementation of the two methods. SoftFarm2.0 system complies with the standard specifications and supports non-standard smart farm devices. According to the analysis results, both methods do not significantly affect performance in the operation of the smart farm. Therefore, it would be good to select and implement the method suitable for each non-standard smart farm device considering environmental constraints such as power, space, distance of communication between the gateway and the node of the smart farm, and software openness. This will greatly contribute to the spread of smart farms by maximizing deployment cost savings.
This paper describes the correction of the protective relay equipped in the dedicated line used for connecting distributed generators (DG) to power grid. The fault current measured in a relaying point might be changed according to the fault conditions. Generally, the fault current of the line to line fault or the line to ground fault at the dedicated line is much higher than the protective set value due to the large fault level. However. when the high impedance fault is occurred in the dedicated line, we may not detect it because its fault level can be lower than the generating capacity of DG. And, the protective relay with conventional set value may generate a trip signal for insertion of DG due to the large transient characteristics of generators. Through the various simulations such as the fault in the dedicated line and the insertion of DG, we show that it would be necessary to modify the protective relay set value for detecting the high impedance fault occurred in the dedicated line and for preventing the mis-operation of protective relay caused by the insertion of DG.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.51
no.7
/
pp.349-361
/
2002
Occasionally, equipment in a distribution system fails due to damage from weather, vandalism, or other causes. Failures and unexpected events do not always occur as and where expected. Therefore, a good contingency plan, multi-zone or otherwise, provides flexibility by locating switches at various strategic locations so that parts of a feeder can be picked up in the event of line outages at various places. It is possible to create feeder system layout that achieve remarkable contingency support economics, even as their normal peak loading levels approach thermal capacity, by utilizing six, seven, or even nine switchable zones per feeder. But many switchable zones per feeder are of questionable practicality and effectiveness, because of the complexity and time required for the switching operation. In practice, a zonal scheme with between three and four zones will usually provide complete contingency backup for all feeders. Line switches have both capital and maintenance costs, the planning for multi-zonal schemes is considerably more difficult than or loop or single-zone systems, and the required switching operations required during contingencies take more time. But multi-zonal schemes are used because these costs come to far less than the cost of additional capacity required for loop or single-zone. In this paper, we present the optimal number of switchable zones per feeder in Kora distribution system.
Kim, Taehoon;Kim, Juyong;Cho, Jintae;Jung, Jae-Seung
Journal of Electrical Engineering and Technology
/
v.13
no.3
/
pp.1123-1130
/
2018
Voltage stabilization is an essential component of power quality in low voltage DC (LVDC) microgrid. The microgrid demands the interconnection of a number of small distributed power resources, including variable renewable generators. Therefore, the voltage can be maintained in a stable manner through the control of these distributed generators. In this study, we did research on the new advanced operating method for a photovoltaic (PV) simulator in order to achieve interconnection to a bipolar LVDC microgrid. The validity of this voltage stabilization method, using the distributed generators, is experimentally verified. The test LVDC microgrid is configured by connecting the developed PV simulator and DC load, DC line, and AC/DC rectifier for connecting the main AC grid. The new advanced control method is applied to the developed PV simulator for the bipolar LVDC grid in order to stabilize the gird voltage. Using simulation results, the stabilization of the grid voltage by PV simulator using the proposed control method is confirmed the through the simulation results in various operation scenarios.
International Journal of Advanced Culture Technology
/
v.10
no.4
/
pp.547-554
/
2022
Due to the expansion of non-face-to-face services, the demand for user identification for mobile devices is increasing. Recently, mobile resident registration cards, mobile driver's licenses, etc. are installed in mobile phones and used for user identification and authentication services. In order to identify a user online, unique identification information of the online user is required. In particular, in order to provide information only to online users, it is necessary to accurately deliver information to a mobile device owned by the user. To make this service possible, it was realized with the advent of mobile electronic notice service. However, the identification of online service users and information on mobile devices owned or subscribed by the relevant users require safe management as personal information, and it is also necessary to increase the convenience of online service users. In this paper, we propose an operating standard for providing a mobile electronic notice service that sends electronic notice using a mobile device owned by the user. The mobile electronic notice service is a service that provides notices expressed in electronic information to the recipient's cell phone, mobile app, e-mail, etc. Therefore, as the use of mobile electronic notification service increases and the provision and use of connecting information to identify users increases, it is necessary to expand the mobile electronic notification service while safely protecting users' personal information.
A novel pseudo-continuous conduction mode (PCCM) voltage-fed single-stage power factor correction (PFC) full-bridge battery charger is proposed in this paper. By connecting a freewheeling transistor in parallel with an input inductor, the PFC cell can operate in the PCCM with a constant duty ratio. Thus, the dc/dc stage can be designed using this constant duty ratio and the restriction on the duty ratio of the PFC cell is eliminated. As a result, the input current distortion is less and the dc bus voltage becomes controllable over the wide output power range of the battery charger. Moreover, the operation principle of the dc/dc stage is designed to be similar to that of a conventional phase-shifted full-bridge converter. Therefore, it is easy to implement. In this paper, the operation of the new converter is explained, and the design considerations of the controller and key parameters are presented. Simulation and experimental results obtained from a 1 kW prototype are given to confirm the operation of the proposed converter.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.