The purpose of this study is to evaluate the mechanical performance and fire resistance of wet-mixed high strength sprayed polymer-modified mortar in order to protect tunnel lining system which are in the event of fire disaster. Since the current commercial fire-resistant materials reproduce the low strength issue of mortar, this study aims to provide an enhanced fire-resistant mortar with a proper strength. Normally, a large temperature gradient phenomenon arise in the vicinity of free surfaces which are fully exposed in the event of persistent flame. Thereby, the determination of optimal cover depth of wet-mixed high strength sprayed polymer-mortar(WHSPM) is important for fire-resistance of tunnel lining system. With comparison of current commercial fire-resistance materials and WHSPM, the experimental result of WHSPM shows the better fire-resistant performance than the others. In addition, the cover limitation should be controlled by minimum 4cm depth in order to avoid fire-induced damage.
For the quick rehabilitation of a fire-damaged tunnel structure, it is the most important procedure to investigate the fire-induced damaged zone rapidly. This study aims to propose a new drilling resistance testing method by which mechanical properties of tunnel concrete lining altered by high temperature can be estimated easily and continuously. Especially, it alms to derive the relationships to estimate mechanical properties of mortar and concrete materials from drilling parameters. To obtain the optimum testing condition, a series of drilling resistance tests were carried out for mortar specimens. When the rotation per minute of drill bit, tile penetration rate and the bit diameter were 1,300 rpm, 1.40 mm/sec, and 10 mm respectively, the deviation of measured drilling resistance forces was minimal. Under the optimum testing condition, the relationships between drilling resistance and mechanical properties of mortar specimens were shown to be very favorable. The concept of replacing a mean value of resistance farces measured during drilling with the resistance energy was proposed to consider the effects of randomly distributed aggregates inside a concrete material on drilling resistance. When the concept was applied to concrete materials, a favorable relationship between actual compressive strength and drilling resistance energy was also successfully derived.
Kim, Jang-Ho;Park, Hae-Geun;Lee, Myeong-Sub;Won, Jong-Pil;Lim, Yun-Mook;Lee, Kyong-Min
Proceedings of the Korea Concrete Institute Conference
/
2006.11a
/
pp.633-636
/
2006
High-rise and large size buildings require high strength concrete and steel structure as a necessity. However, high strength concrete and steel structure are strong material but have a weakness to high temperature. Therefore, fire protection is a matter that must be considered very importantly in design for structure of high strength concrete and steel. Fire proof board that is existing method for fire proof has relatively low performance in fire protection emphasizes the need of new fire protection material due to the using of in numerable inflammables like plastics. The objective of this study is to understand the fire-resisting performance of newly developed fire protection material for building. This paper describes the results of fire tests using ISO curve that is fire protection regulation for buildings of the newly developed cementitious fire protection coating material applied concrete tunnel lining specimens.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.2
/
pp.307-315
/
2016
Many countries are trying to reduce a greenhouse gas to step up their fight against climate change. There are many studies related to building only for reducing a greenhouse gas in construction area but studies related to reducing a comprehensive environmental load including various pollutants that affects the global environment are lacking. This study aims to analyse the characteristics of environmental load by work type for tunnel projects. Analysis showed that seven work types, including lining concrete, shotcrete, tunnel portal and open-cut tunnel work, etc., are representative works generated environmental load. These seven works represent 89.22 percent of total environmental load. In addition, comparison results of environmental load per tunnel's length by work type showed that a major factor of environmental load is caused by a tunnel portal and open-cut tunnel work with relatively short length (excavation length). And lining concrete and shotcrete work are larger than any other environmental load with tunnel's total length. It is expected that the result of this study will be used to make a estimation model for environmental load using approximate quantity survey of representative work types in the early stage of tunnel design. And it will be play a considerable role in establishing of environment management plan for sustainable infrastructure construction.
P-wave velocity of concrete is a crucial parameter in determining the thickness of concrete lining, the location of cracks or other defects in Impact-Echo(IE) method. This study introduces an IE-SASW method that may determine the P-wave velocity on a surface of each testing area using the Spectral Analysis of Surface Wave (SASW) method. In numerical studies(Part I), it was verified that P-wave velocities could be obtained from SASW. In this paper(Part II), experimental studies were made in slab type concrete model specimens in which voids and waterproof sheet were included at the known locations. Accordingly, the feasibility of the proposed method was evaluated. The IE-SASW method was also performed in the precast model tunnel on ground and open-cut tunnel in ground. SASW tests were performed to determine the P-wave velocity of the concrete and then IE tests were carried at regularly spaced points along the testing lines to determine the thickness of structures. The nondestructive testing method which combined SASW and IE tests showed the great potential in the field applications.
Journal of Korean Tunnelling and Underground Space Association
/
v.9
no.2
/
pp.157-169
/
2007
This study aimed to quantify the deterioration of tunnel structural members such as concrete lining and shotcrete lining after a tunnel fire accident by measuring their mechanical properties between $300^{\circ}C$ and $1,000^{\circ}C$. From the experiments, it was revealed that the critical temperature where mechanical properties start to decrease linearly was approximately $300^{\circ}C$. In addition, the other critical temperature where macro-cracks are induced in specimens was around $600^{\circ}C$. From a series of regression analysis, the optimum regression function with correlation coefficients over 0.99 for mechanical properties at different temperature levels was obtained as the Boltzmann function. Finally, a schematic diagram to estimate temperature distribution inside structural members as well as their mechanical properties at corresponding temperature levels quantitatively was newly proposed for RABT and RWS fire scenarios.
Proceedings of the Korean Society For Composite Materials Conference
/
1999.11a
/
pp.143-148
/
1999
In this paper we present the results of an analytical investigation on the existing concrete structures which are reinforced with carbon fiber grid. The carbon fiber grid and polymer mortar are utilized in the reinforcement of concrete column, beam, and tunnel lining. The physical and mechanical properties of the carbon fiber grid and polymer mortar were obtained experimentally and then used in the analytical investigation. In the analysis concrete structures are modeled with 3-D solid finite elements and the carbon fiber grid is modeled with space frame elements. Through the investigation reinforcing effect of carbon fiber grid on the existing concrete structures is confirmed.
Park, Chal-Sook;Kwan, Han;Lee, Kyu-Tak;Kim, Bong-Jae;Yun, Yong-Jin;Kim, Kwang-Hee
Proceedings of the Korean Geotechical Society Conference
/
2008.10a
/
pp.1532-1548
/
2008
The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. The tunnel outlet was planned to be made after installing slope stabilization system on natural slope there. Generally, the tunnel outlet is made perpendicularly to the slope, but in this case, it had to be made obliquely to the slope for not interrupting flow of river. Because of excavation in condition of natural slope caused to deflecting earth pressure, the outlet couldn't be made. So, artificial ground made with concrete that it was constructed in the outside of tunnel for producing the arching effect which enables to make a outlet. We were planned tunnel excavation was carried out after artificial ground made. Artificial ground made by poor mix concrete of which it was planned that the thickness was at least 3.0m height from outside of tunnel lining and 30cm of height per pouring. Spreading and compaction was planned utilized weight of 15 ton roller machine. In order to access of working truck, slope of artificial ground was designed 1:1.0 and applied 2% slope in upper pert of it for easily drainage of water. In addition to, upper pert of artificial ground was covered with soil, because of impaction of rock fall from upper slope was made minimum. The tunnel excavation of the artificial ground was designed application with special blasting method that it was Super Wedge and control blasting utilized with pre-percussion hole.
Kim, Gyoung-Hun;Choi, Jun-Dong;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.1302-1313
/
2010
The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.
Kim, Young-Geun;Han, Byeong-Hyun;Lee, Seung-Bok;Kim, Eung-Tae
Tunnel and Underground Space
/
v.21
no.4
/
pp.251-263
/
2011
The geomechanical characteristics of rock and the structural geological feature of the fault should be studied and examined for the successful construction of large-span tunnel. In this case study, that is a important case for the tunnel collapse and reinforcement during the construction for the waterway tunnel at large thrust fault zone in schist, we carried out geological and geotechnical survey for make the cause and mechanism of tunnel collapse. Also, we have designed the reinforcement and re-excavation for the safe construction for collapse zone and have carried out successfully the re-excavation and finished the final concrete lining.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.