• Title/Summary/Keyword: complex project

Search Result 943, Processing Time 0.024 seconds

Geotechnical Characteristics of Soft Clay in Myungji Housing Complex (부산 명지주거단지 연약 점토의 지반 공학적 특성)

  • Lee, Suk-Jin;Yang, Hee-Jeong;Lee, Jun-Ho;Kim, Jung-Kwan;Sung, Sang-Gyu;Lee, Joo-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.445-454
    • /
    • 2006
  • Myungji Housing Complex is located in the Nakdong River plain in which the Busan soft clays are developed. It has thick soft soil laver of about GL(-)50m including loose sandy layers, upper and lower clayey layers. The clayey layers have been being consolidated since the land reclamation was completed to build the place for Housing Complex(Apartment) in 1997. Therefore, as one of a series of advance preparations of this project, study was carried on the geotechnical characteristics under the foundation The first part of this paper represents a brief geological history. Then, geotechnical characteristics of clay was analyzed in the classical developments in soft clay. They were based on the geotechnical data obtained by site investigations performed from 1992 to 2005. Finally, we evaluated the average degree of consolidation at this point in time and the residual settlements of upper clayey layer using dissipation and oedometer tests for this project

  • PDF

Information-based Smart Construction Management of High Rise Building Under the Complex Surrounding Environment in City Core Area

  • Liang, Haoqing;Li, Jian;Song, Weiqing
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.3
    • /
    • pp.203-210
    • /
    • 2021
  • With the development of urbanization, the increasing of buildings density in urban core areas result in the complexity of construction environment. High-rise landmark building is always preferred in the construction of urban core areas. Super high-rise buildings construction are facing construction management difficulties due to the complex working conditions and enormous building system, especially with the complex surrounding environment of the urban core area, the construction management of super high-rise buildings in the area requires higher, refined and detailed standard. Based on a super high-rise project in a core area of Shanghai which has 370 m building height and 772,643 m2 building area, with complex surrounding environment, narrow construction site and many super-high-altitude crossing works. With the application of BIM technology, the Internet of Things, the LAN communication and other various intelligent mechanical equipment, information management systems, the efficiency and refinement of construction management are improved, ensuring the smooth implementation of the project while effectively controlling the impact on the surrounding environment.

The Impact of Project Governance Factors on IT Project Objectives Performance (프로젝트 거버넌스의 구성요인들이 IT 프로젝트 목표 성과에 미치는 영향)

  • Jung-Soo Kim;Seung-Chul Kim;Hee Kyung Kim;Chang Won Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.241-250
    • /
    • 2023
  • Companies are paying attention to project governance to realize their goal strategies, project success, and project value in a rapid and complex environment due to the development of information technology. This study aims to explore project governance and factors from literature review and practice guides related to project governance and empirically analyze the impact of project governance factors on IT project objective performance. The survey was conducted on project managers, project team members, and project management members with experience in carrying out business IT projects within two years at companies in various industries in Korea. The main conclusion is as follows. Among the project governance factors, disclosure and reporting that uses and reports using appropriate and reliable information about projects related to decision-making activities positively impact the achievement of IT project objectives: business success and stakeholder satisfaction. Among the project governance factors, project sponsorship, a role that effectively connects management and projects, and a project management framework that provides tools, procedures, resources, and techniques for projects positively impact IT project objective performance. This study is of academic and practical significance in that it identifies the definition and factors of project governance through companies in various industries in Korea and the positive impact of project governance factors on IT project objective performance.

A Study on a Type of Regeneration Project on Old Industrial Complex (노후산업단지 재생사업 추진 유형에 관한 연구)

  • Kim, Joo-hoon;Byun, Byung-seol
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.21 no.2
    • /
    • pp.192-211
    • /
    • 2018
  • With significant influences of old industrial complex in September 2009, Ministry of Land, Infrastructure and Transport chose the 4 districts for the first pilot project. In December 2014, the second pilot project districts were established. In addition, there were 10 districts in April 2016 and 5 districts in April 2016 as the third pilot project and 5 districts in March 2017 as the fourth pilot project. In order to promote smooth business operation of the recycling business, we introduced the effective area designation and special system as stipulated in Article 39.12-13 of the Industrial Location and Development Act revised in May 2015. The effective area, It is a method that can promote propagation and diffusion of the rehabilitation business through visualization by making effective the promotion of the rehabilitation business and by promoting the business in consideration of the geographical feature of the region and industry group, The setting of the unreasonable effective area is based on the criteria and classification of the plan and the objective promotion method according to the individual characteristics of the aged industrial park because the delay of the rehabilitation business and the possibility of the increase of many problems are presented Be sure to Data Envelopment Analysis (DEA) and the old industrial complex database were constructed and utilized to classify the types of recycling projects. Therefore, in this study, it is necessary to strengthen the competitiveness of aged industrial complex by examining the correlation between the diagnosis of 83 aged industrial complex sites and the rehabilitation projects supported by the Ministry of Land, and the types of business promotion for aged industrial parks. It can be used as a guideline for the feasibility of the project.

A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings (초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구)

  • Kim, Sang Hwan;Choy, Won Cheol;Kim, Ju Hyung;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

MULTI-SCALE MODELING AND ANALYSIS OF CONVECTIVE BOILING: TOWARDS THE PREDICTION OF CHF IN ROD BUNDLES

  • Niceno, B.;Sato, Y.;Badillo, A.;Andreani, M.
    • Nuclear Engineering and Technology
    • /
    • v.42 no.6
    • /
    • pp.620-635
    • /
    • 2010
  • In this paper we describe current activities on the project Multi-Scale Modeling and Analysis of convective boiling (MSMA), conducted jointly by the Paul Scherrer Institute (PSI) and the Swiss Nuclear Utilities (Swissnuclear). The long-term aim of the MSMA project is to formulate improved closure laws for Computational Fluid Dynamics (CFD) simulations for prediction of convective boiling and eventually of the Critical Heat Flux (CHF). As boiling is controlled by the competition of numerous phenomena at various length and time scales, a multi-scale approach is employed to tackle the problem at different scales. In the MSMA project, the scales on which we focus range from the CFD scale (macro-scale), bubble size scale (meso-scale), liquid micro-layer and triple interline scale (micro-scale), and molecular scale (nano-scale). The current focus of the project is on micro- and meso-scales modeling. The numerical framework comprises a highly efficient, parallel DNS solver, the PSI-BOIL code. The code has incorporated an Immersed Boundary Method (IBM) to tackle complex geometries. For simulation of meso-scales (bubbles), we use the Constrained Interpolation Profile method: Conservative Semi-Lagrangian $2^{nd}$ order (CIP-CSL2). The phase change is described either by applying conventional jump conditions at the interface, or by using the Phase Field (PF) approach. In this work, we present selected results for flows in complex geometry using the IBM, selected bubbly flow simulations using the CIP-CSL2 method and results for phase change using the PF approach. In the subsequent stage of the project, the importance of effects of nano-scale processes on the global boiling heat transfer will be evaluated. To validate the models, more experimental information will be needed in the future, so it is expected that the MSMA project will become the seed for a long-term, combined theoretical and experimental program.

Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan

  • Musarat, M. Ali;Ahad, M. Zeeshan
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.1-6
    • /
    • 2016
  • Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.

A Study on the Agile Approach in Battlefield Management Information System R&D Project in Korea Military (국방 전장관리정보체계 연구개발사업의 애자일 적용 방안 연구)

  • Yun, SungHyun;Lim, GyooGun
    • Journal of Information Technology Services
    • /
    • v.20 no.1
    • /
    • pp.41-54
    • /
    • 2021
  • The SW-centered battlefield management information system R&D project takes a long period of 5-10 years or more by applying a complex and rigid batch acquisition strategy. In order to solve this problem, it is necessary to institutionalize a rapid and flexible battlefield management information system R&D project management procedure applying agile development methodology, and a government project management organization and contract management method to support it In this study, we analyzed the case of applying the Agile development method centered on Scrum to the US SW-centered weapon system R&D project and the characteristics and problems of the battlefield management information system R&D project in Korea, and suggested improvement measures as follows. First, the battlefield management information system R&D model applies the hybrid development method, and the system requirements analysis and system structure design use the existing waterfall development procedure, and the agile method is applied from the SW requirements analysis to the system integration stage. Second, flexible adjustment of performance, schedule, and cost by organizing an Agile IPT in which military (requirements) - DAPA (project management) - developer - functional specialized organizations (test and evaluation, quality, government research institutes, etc.) participate. Third, improving the Basic Order Agreement so that it can be applied to agile R&D.