• Title/Summary/Keyword: building work

Search Result 2,687, Processing Time 0.03 seconds

A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building (초고층 골조공사 생산성 향상을 위한 작업 프로세스 개선)

  • Jang Ji-Sun;Shin Yoon-Seok;Kang Kyoung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.161-164
    • /
    • 2005
  • According to the trend of tail building, it is essential to improve productivity in tall building construction. However, the study on that is insufficient until now. Therefore, the purpose of this study is to propose a new work process of efficient concrete structural fame work to improve productivity in tall building construction. The results of being applied proposed work process are that the 5day cycle time of concrete structural frame work is cut by 0.5day and the quantity of rebar to be demanded in concrete structural frame work is reduced.

  • PDF

A Study on the Work-Planning Method of High-rise Building (초고층 건물의 구조체 공사의 작업계획방법에 관한연구)

  • Kim Dae-Gil;Hwang Jae-Hoo;Jung Ho-Geun;Kim Ju-Hwan;Lee Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.129-132
    • /
    • 2006
  • Recently, Society increasingly need the hish-rise building because of urban population concentration. and The hish-rise building need new systematic work-planning method. but it didn't use the construction project's work plan and management. his paper investigated efficient work-planning method. and the work-planning method in using domestic High-rise building's structure work. A investigated result is TACT, DOC LOB etc. and domestic using method is 3day and 4day-Cycle among the Tact. This paper is to compare and analysis two method. a purpose of paper is to analyse application through the case of using the work-planning method. also To find efficient method.

  • PDF

Influence of Capacity Building and Attitude to Work of librarians in Edo State Public Libraries, Nigeria

  • Omigie, Christopher Agbeniaru;Bosah, Gabriel Ejiobi
    • International Journal of Knowledge Content Development & Technology
    • /
    • v.10 no.1
    • /
    • pp.35-45
    • /
    • 2020
  • This study is on capacity building and attitude to work of librarians in Edo State public libraries, Nigeria. Investigation was on the capacity building programs in the Edo State public libraries, the levels of librarians' awareness and participation in the programs, methods of building the capacity programs, influence on the librarians' attitudes to work and factors militating against the programs. Descriptive survey design was adopted for the study and the entire population of 23 librarians were used. Results indicate that the capacity building programs in the library include computer literacy skills, online public access catalogue (OPAC), Internet collection management and general trends in librarianship. The methods used in building the capacity programs in the library include conferences, workshops/seminars, on-the-job and internally organized courses. Respondents indicated very low level of participation in the programs and a negative influence of the programs on their attitudes to work. Various problems were identified as militating against the capacity building programs and solutions were suggested.

Facade Cleaning Process Analysis For Construction Robot System Design of High-rise Building External wall Maintenance (고층건물 외벽 유지보수 건설로봇 시스템 개발을 위한 청소공정 작업절차 분석)

  • Kim, Dae-Geon;Kim, Bok-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.77-79
    • /
    • 2011
  • As residents and building owners demand maintenance that is required to achieve sustainable building performance, efficient building management methods are required. Even though the demand for maintenance systems is increasing, current maintenance work for high-rise buildings mostly uses conventional ropes and gondolas that pose a high risk of accidents and exhibit poor performance and efficiency. Thus, there is an urgent need to develop an automation robot system that can reduce accidents and improve the maintenance efficiency of the conventional high-rise building façade maintenance system. As a preceding work for the development of an automation robot system, this study classified and analyzed the work processes of actual construction sites and proposed basic techniques for the work mechanisms of the robot system by investigating the motions of cleaning workers.

  • PDF

An Analysis of the Effect of Weather Condition with Work Sections in Building Construction (건축공사 공종별 기후요소 영향도 분석)

  • Kim Baek-Joong;Seo Jang-Woo;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.141-144
    • /
    • 2006
  • The building construction is an essential field to consider weather condition because construction works are performed in a site. From this reason, this study evaluated the effect of weather condition with work sections in building construction by Analytic Hierarchy Proces (AHP) method. The results of this study as follows : (1) The effect of weather condition with work sections is affected by rainfall in summer season, and by a low temperature in winter season (2) The effect of weather condition with work sections is 0.235 for mold work, 0.210 for concrete work, 0.181 for steel-frame work.

  • PDF

The Property of Building Construction Accident According to the Analysis of Building Accident Cases (재해사례분석을 통한 빌딩공사 재해 특성)

  • Lee Jong-Bin;Ro Min-Rae;Go Seong-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.3 s.67
    • /
    • pp.101-107
    • /
    • 2004
  • Recently, construction work's tendency has become a high-rise building, a complexity and a large size. According to the KOSHA data, construction work accidents have not been decreased. Looking at from the side of accident accidents of construction industry are occupied over 1/3 among all industry accidents. Therefore, this study will analyze the accident of the building construction work from the data of KOSHA which were collected during 11 years$(1992\~2002)$ data relating to serious accidents of the building construction work suggest the counterplan according to the each work type in building construction work.

A STUDY ON THE SAFETY INFORMATION SYSTEM TO PREVENT HAZARD OF BUILDING CONSTRUCTION

  • Han-Min Lee;Seong-Seok Go;Hyuk Song;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1048-1052
    • /
    • 2005
  • In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.

  • PDF

Case Study on Landscape Defect Type of Defect Lawsuit in Apartment Building (공동주택 하자소송에서의 조경하자유형 사례분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.263-264
    • /
    • 2016
  • Since 2000s in Korea, apartment building tended to become goods or assets rather than houses. Therefore, conflicts between supplier and consumer were aggravated, and the defect dispute has been increased rapidly. This dispute enlarges to defect lawsuit and it is social and economical matter. The landscape work in apartment building is main work for a resident that appearance and convenient facility which lawn, tree, fountain, chair, playground, and etc. A number of defects surround landscape work are important issue in defect lawsuit, but, a related research is a minority, and a regulation is incomplete. Therefore, this study is basic study for standard of landscape defect type. As case study on defect lawsuit, draw a landscape defect type in apartment building.

  • PDF

Ergonomics Job Hazard Evaluation of Building Cleaners

  • Lee, Kyung-Sun;Lee, In-Seok;Kim, Hyun-Joo;Jung-Choi, KyungHee;Bahk, Jin-Wook;Jung, Myung-Chul
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.3
    • /
    • pp.427-435
    • /
    • 2011
  • Objective: The objective of this study was to evaluate a work of building cleaners using the ergonomic methods. Background: Previous studies about cleaning worker describe typical physical demands of this work. They found that the most significant risk factors associated with the physical work of cleaners are static loads and repetitive movements and high output of force. Method: A head of ergonomics estimation was work analysis(define of combined task, work tool, work time and frequency of combined task) and posture analysis of worker. Results: The results showed that combined task of building cleaners was classification sweeping, mopping(wet), mopping(oil), moving barrels/carts, dumping trash bags, scrubbing, arrangement of cleaning tool, arrangement of circumferential, moving of cleaning tool, and waiting. The work time of combined task such as mopping(wet) and scrubbing indicated high ratio. The posture analysis of building cleaners indicated high value in bending of the head, lower arm, and hands. Conclusion: The findings appear to indicate that building cleaner were related to high risk of work-related musculoskeletal disorders. So, building cleaner would be required an interventional strategy, improvement of cleaning tools and working environment. Application: If ergonomics rule can be integrated into existing cleaning tools and work environments, the risk of occupational injuries will be reduced.

Case Study for Developing of Standard Process about Defect Consulting Work in Apartment Building (공동주택 하자감정업무 표준절차개발을 위한 사례분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.158-159
    • /
    • 2014
  • There is urgent for defect consulting work to standardize the investigated method, repaired and reinforced method, and estimated cost about defect in increasing a defect lawsuit of apartment building. For the purpose of developing the standard process of defect consulting work, the review that a used process in law and institution should take precedence. There is not prepared the national standard for defect consulting but is dependent on an experience and a practice of consultants. This study analyzes defect consulting case, defines main steps for developing the standard process, and draws phased work factors. As systemizing this, it is expected to apply to basic structure for developing the standard process of defect consulting work for the next.

  • PDF