Construction of a 300-Meter Vertical City: Abeno Harukas

  • Mizutani, Kenichi;Hirakawa, Kiyoaki;Nakashima, Masato
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.3
    • /
    • pp.199-207
    • /
    • 2015
  • Abeno Harukas is the tallest building in Japan and is located in Abeno, which is one of the three main railway transport nodes in Osaka. This building has a height of 300 meters, and its lowest levels are 30 meters below ground. It contains a department store, museum, offices, a hotel, and an observatory. In this urban renewal project, a section of the department store that encloses the station was dismantled and replaced by a supertall building complex, while infrastructure was simultaneously constructed, including: upgrades to the station and the existing department store, improved connections to the subway and pedestrian bridges, and a new pedestrian walkway over the road. In this paper, the ingenious erection processes, newly developed technologies, and precise construction management techniques are introduced for Japan's tallest building.

Industrialized Building Systems for the Kingdom of Saudi Arabia

  • Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.73-79
    • /
    • 2017
  • Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.

  • PDF

APPLICATION OF SPACE SYNTAX FOR PARTITION SEQUENCING OF WORKING SPACE IN BUILDING CONSTRUCTION

  • Li-Wen Wu;Sy-Jye Guo
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.573-582
    • /
    • 2007
  • Working spaces in the construction site are much more complicated than completed spaces in the building. There are many researches focus on partition of building spaces. However, few discussed partition sequencing in building construction sites. Space syntax is a set of techniques for analyzing spatial configurations. It has become a useful tool in a variety of researches. Partition sequencing of working spaces should be related to the working direction. However, with convex space and axial line, the partition sequencing became unrelated to the working direction. When critical space is blocked, the partition sequencing with axial line will be changed. It is significant to reveal the impact of the entire spatial structure when some of the working spaces are blocked. This paper discussed the improved partition sequencing theory and highlighted the importance of critical space and analyzed the spatial structure of working space. A real case project was demonstrated in this paper.

  • PDF

SUSTAINABLE AND ENVIRONMENTALLY RESPONSIBLE DESIGN USING BIM: A CASE STUDY OF A RESIDENTIAL PROJECT

  • Hyunjoo Kim;Kwok K. Tam
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.84-87
    • /
    • 2011
  • This paper describes the application of the three sustainable design elements for a residential project in the county of Los Angeles, USA. The first design element is the green building design in which a base model will be created using the Autodesk REVIT MEP program for the analysis by Building Information Modeling (BIM) for the energy analysis modeling process to determine the energy savings for each of the recommended design features. The second element is the Low Impact Development design for the site design using specialty material and structural devices for infiltration and recycling of storm water for reuse. The third element is the application of drought tolerant plant species in the site's landscaping design as a means to conserve water. The construction cost associated with the application of these three elements will be reviewed to determine the practicality and effectiveness of this sustainable design approach.

  • PDF

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

Critical Environmental Management Factor by Project Participants for Considering Work Importance and Difficulty (업무 중요도-난이도를 고려한 프로젝트 참여주체별 핵심 환경관리 항목 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.214-215
    • /
    • 2013
  • Recently, Construction industry has been trying to reduce environmental impacts reflecting the global trend 'Green Growth'. However most of previous studies focused on operation & maintenance phases and do not have been approached construction phases. In addition, environmental management factors by project participants are assessed with only weight of factors, overlooking these work difficulty. Therefore This study aims to deducted the critical environmental management factors by project participants considering work difficulty in plan, design and construction phase. The basis data is collected through literature reviews and interview targeting each project participant and analyze these data using importance-difficulty analysis(IDA).

  • PDF

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

A Study on Waste Management Method of Construction Project in Planning Stage (건설프로젝트 계획단계에서 폐기물 관리방안 연구)

  • Cho, sung;Cho, Yong;Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.155-158
    • /
    • 2008
  • This paper shows construction management focused on waste management in construction project in planning stage Construction waste is given a great deal of weight on total waste. And it is issued in government policy. But it show the limit of problem.As a result of having referenced idea as describe above, this paper will be studied by this process. First, present condition of development waste, cases is researched in construction projects. Second, problems of development pattern and management system are investigated and checked in project cases. Third, maintenance and management method project are proposed by application of planning Stage.

  • PDF

Competency-Based Career Management System Plan for Construction Manager (건설사업관리자의 역량기반 경력관리체계 구축 방안)

  • Jung, Seo-Young;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.

  • PDF

Development of Safety Management System Based on Location Determination Technology for Construction Workers in Nuclear Power Plant Construction Project (무선측위 기술을 활용한 원전 건설현장 인원 안전관리 시스템 개발 방안)

  • KIM, WooJoong;Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.239-240
    • /
    • 2016
  • The nuclear power plant construction project is a large-scale project that involved a daily maximum of thousands of workers. many equipment and laborers involved has been required consistently to minimize the need for safety through real-time safety management. But current nuclear power plant construction site is only managed to access of workers and equipments. The purpose of this study is the owner requirements reflects the characteristics of the nuclear power plant construction project integrated safety management system utilizing active RFID and GPS positioning technology.