• Title/Summary/Keyword: bottom lateral bracing

Search Result 10, Processing Time 0.025 seconds

After-fracture redundancy in simple span two-girder steel bridge

  • Park, Yong-Myung;Joe, Woom-Do-Ji;Hwang, Min-Oh;Yoon, Tae-Yang
    • Structural Engineering and Mechanics
    • /
    • v.27 no.6
    • /
    • pp.651-670
    • /
    • 2007
  • An experimental study to evaluate a redundancy capacity in simple span two plate-girder bridges, which are generally classified as a non-redundant load path structure, has been performed under the condition that one of the two girders is seriously damaged. The bottom lateral bracing was selected as an experimental parameter and two 1/5-scale bridge specimens with and without bottom lateral bracing have been prepared. The loading tests were first performed on the intact specimens without cracked girder within elastic range. Thereafter, the ultimate loading tests were conducted on the damaged specimens with an induced crack at the center of a girder. The test results showed that the cross beams and concrete deck redistributed partly the applied load to the uncracked girder, but the lateral bracing system played a significant role of the load redistribution when a girder was damaged. The redundancy was evaluated based on the test results and an appropriate redundancy level was evaluated when the lateral bracing was provided in a seriously damaged simple span two-girder steel bridge.

An Experiment on Redundancy in Continuous Span Two-Girder Bridge - Effects of Lateral Bracing (연속 2-거더교의 여유도 평가 실험 - 수평브레이싱의 효과)

  • Park, Yong-Myung;Joe, Woom-Do-Ji;Hwang, Min-Oh;Yoon, Tae-Yang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.417-429
    • /
    • 2008
  • This paper presents an experimental result to evaluate the redundancy in continuous span two plate-girder bridges which are generally classified as a non-redundant load path structure. The experiments were performed when one of the two girders is seriously cracked. To estimate the effects of bottom lateral bracing on the redundancy, the experiment variable was considered as the bottom lateral bracing, and two 1/5-scaled bridge specimens with and without lateral bracing system were fabricated. The ultimate loading tests were conducted on the damaged specimens with an induced crack at a girder in the side span. The test results showed that the load carrying capacity of damaged specimen with bracing was about 1.2 times higher than that without bracing. To evaluate the redundancy in each specimen, numerical analysis was performed to calibrate the difference of dead load between the actual bridge and the test specimens. When the dead load calibration is considered, the results showed that a continuous span two-girder bridges have a reasonable redundancy even without lateral bracing. Especially, the level of redundancy is increased by about 1.8 times when the lateral bracing is provided.

Effects of Lateral Bracing on the Load Distribution and Torsional Behaviors in Continuous Two-Girder Bridges (연속 2-거더교에서 수평브레이싱이 하중 분배 및 비틂 거동에 미치는 영향)

  • Hwang, Min Oh;Yoon, Tae Yang;Park, Yong Myung;Joe, Woom Do Ji;Hwang, Soon Young
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.6
    • /
    • pp.671-680
    • /
    • 2007
  • In this study, we performed a loading test to evaluate the effect of load distribution on continuous two-span plate-girder bridges with or without bottom lateral bracing using one-fifth-scale bridge specimens. From the test results, when specimens with lateral bracing were loaded eccentrically, the load distribution capacity of the concrete deck and cross beam improved and greater loading was distributed to the other side of the girder subjected to loading. The load distribution rate of the specimens with and without lateral bracing system was evaluated from the analytical model that was verified by the test results. From the result of the quantitative evaluation, when specimen without lateral bracing was loaded eccentrically, mostly 21% of loading according to the concrete deck was distributed to the other side of the girder subjected to loading. However, when specimen with lateral bracing was loaded eccentrically, the load distribution rate increased by 1.7 times as all cross beams, bracing and concrete deck participated in load distribution. The reason is that the torsional rigidity increased as the model with lateral bracing behaved like a pseudo-closed box section.

An Experiment on Redundancy in Simple Span Two-Girder Bridge - Effects of Lateral Bracing (단경간 2-거더교의 여유도 평가 실험-수평브레이싱의 효과)

  • Park, Yong Myung;Joe, Woon Do Ji;Hwang, Min Oh;Lee, Dae Yong;Yoon, Tae Yang
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.3
    • /
    • pp.271-280
    • /
    • 2007
  • This paper presents the results of an experimental study to evaluate the redundancy in two plate-girder bridges, which are generally classified as non-redundant load path structures. The study was performed at a time when one of the two girders was damaged. The bottom lateral bracing was considered the experimental variable, and two 1/5-scale bridge specimens of simple span with and without a lateral bracing system were fabricated. Loading tests were first performed on the intact specimens without a cracked girder, within an elastic range. Thereafter, the ultimate loading tests were conducted on the damaged specimens with an induced crack at the center of a girder. The test results showed that the cross beams and the concrete deck redistributed some of the load to the uncracked girder, but the lateral bracing system played an important role in improving the redundancy during the damage and was also effective for load redistribution even when the bridge was intact.

Redundancy Evaluation of the Composite Two Steel Plate-Girder Bridges (강합성 플레이트 2-거더교의 여유도 평가)

  • Park, Yong-Myung;Joe, Woom-Do-Ji
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4A
    • /
    • pp.611-620
    • /
    • 2006
  • The composite two plate-girder bridges are generally defined as a non-redundant load path structure because the bridge can collapse if one of the two girders is seriously damaged by a fatigue crack. In this paper, a numerical study on the evaluation of the after-fracture redundancy of the composite two-girder bridges was accomplished. The evaluation has been performed on the simple and three-span continuous bridges with I-section cross beams which serve as transverse bracing, and with or without the bottom lateral bracing system. The load carrying capacities of the intact and damaged bridges with or without lateral bracing were evaluated from material and geometric nonlinear analysis, respectively and the redundancy was evaluated for each case. It was acknowledged from the analytical results that both simple and continuous intact two-girder bridges have sufficient redundancy even without lateral bracing, but it takes an important role to improve the redundancy of damaged bridges.

Study of an innovative two-stage control system: Chevron knee bracing & shear panel in series connection

  • Vosooq, Amir Koorosh;Zahrai, Seyed Mehdi
    • Structural Engineering and Mechanics
    • /
    • v.47 no.6
    • /
    • pp.881-898
    • /
    • 2013
  • This paper describes analytical investigation into a new dual function system including a couple of shear links which are connected in series using chevron bracing capable to correlate its performance with magnitude of earthquakes. In this proposed system, called Chevron Knee-Vertical Link Beam braced system (CK-VLB), the inherent hysteretic damping of vertical link beam placed above chevron bracing is exclusively utilized to dissipate the energy of moderate earthquakes through web plastic shear distortion while the rest of the structural elements are in elastic range. Under strong earthquakes, plastic deformation of VLB will be halted via restraining it by Stopper Device (SD) and further imposed displacement subsequently causes yielding of the knee elements located at the bottom of chevron bracing to significantly increase the energy dissipation capacity level. In this paper first by studying the knee yielding mode, a suitable shape and angle for diagonal-knee bracing is proposed. Then finite elements models are developed. Monotonic and cyclic analyses have been conducted to compare dissipation capacities on three individual models of passive systems (CK-VLB, knee braced system and SPS system) by General-purpose finite element program ABAQUS in which a bilinear kinematic hardening model is incorporated to trace the material nonlinearity. Also quasi-static cyclic loading based on the guidelines presented in ATC-24 has been imposed to different models of CK-VLB with changing of vertical link beam section in order to find prime effectiveness on structural frames. Results show that CK-VLB system exhibits stable behavior and is capable of dissipating a significant amount of energy in two separate levels of lateral forces due to different probable earthquakes.

Incomplete fabrication effects on represtressing preflex girders encased in concrete

  • Jeong, Euisuk;Lee, Hwan-Woo;Lee, Jaeha
    • Steel and Composite Structures
    • /
    • v.43 no.1
    • /
    • pp.67-77
    • /
    • 2022
  • In the current study, ordinary design of Represstessed Pre-Flex (RPF) girder by classical beam theory and numerical model taking buckled shape into consideration were compared with field-survey data to find imperfections on the RPF girder before prestressing and after preflexion. It should be noted that the ordinary design do not consider deformed shape of steel girder in RPF beam. The deformed shapes of steel girder due to the incomplete fabrication that could be caused by self-weight, preflexion misalignment, existence of lateral bracing at mid-span and stiffness of reaction frame were found using a newly developed model which was verified against a deformation survey conducted on actual RPF girder in the field. The final observed deformed shapes of RPF after concrete shrinkage and before prestressing were classified into W, C and Unsymmetric shapes in regard to both survey and analytical results. The deformation survey showed negligible amount of unwanted deformation compared to the large size of the RPF girders. The shallower width of the bottom flange of steel girder caused amount of lateral torsional buckling under self-weight and preflexion thereby affecting the unwanted final overall shape of the RPF girders. However, it was found that the unwanted deformation of RPF girders by fabrication errors even though it is negligible compared to the size of the girder, caused unsymmetrical stress contours in concrete and additional tensile stress and raise some safety issues.

The Optimization Algorithm for Wall Bracing Supports of Tower Cranes (타워크레인의 횡지지 최적설계 알고리즘 개발)

  • Lee, Hyun-Min;Ho, Jong-Kwan;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.130-141
    • /
    • 2010
  • Poor expertise in equipment operation and installation, coupled with unpredictable natural disaster, usually directly leads to disastrous accidents of large lifting equipment such as tower cranes. For example, 52 tower cranes fell down due to the unstable support in Korea at the attack of Typhoon "Maemi" in 2003, which damaged property and caused loss of life. In high-rise construction projects, top-slewing or luffing-jib tower cranes needs checking the stability of lateral-support in addition to the bottom support such as the foundation. In this study, the optimization algorithm for lateral-support of tower cranes is conducted, which is expected to enhance the structural stability of tower cranes and save the cost in conflict with the safety.

An Experimental Study on the Stress Behavior of Coped Stringers in Steel Railway Bridge - I : the Reason Why Crack Occurs (철도교 세로보 절취부에서의 응력거동에 관한 실험적 연구 - I : 균열 발생원인)

  • Li, Guang Ri;Park, Young Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.299-305
    • /
    • 2009
  • In this study, in order to research the causes lead to fatigue crack in the coped stringer of a steel railway bridge, we take the steel railway bridge which actually occurs fatigue crack as a research object and manufacture the full size of crossbeam-stringer and floor system model to perform the experimental test. The results indicates that, the fatigue crack in the top of coped area of stringers is caused by the reciprocal action of the in plane stress in the tip of coped area of web by the negative moment occurred in the end of the stringers. While the fatigue crack in the bottom of coped area of stringers is due to the plane stress caused by the out-plane deformation relative to the bottom of coped area of web of the fixed end in the stringers.

A Study on Design of Earth-Retaining Structure Constructed by a Row of Bored Piles (주열식(柱列式) 흙막이벽(壁)의 설계(設計)에 관한 연구(研究))

  • Hong, Won Pyo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.2
    • /
    • pp.11-18
    • /
    • 1985
  • A row of bored piles has been used in several excavation works to retain the earth. This excavation bracing system has much effect on low-vibration and low-noise during construction. The system is also effective to provide protection to the adjacent existing ground and structures. For the purpose of establishment of a logical design method for the bored piles, first, a theoretical equation to estimate the resistance of piles is derived. Because arching action of soils between piles is considered in the equation, the characteristics of soils and the installation condition of piles would be considered logically from the beginning. Then a method is investigated to decide the interval ratio of piles. According to the method, the interval between piles can be decided from the information of the Peck's stability number, the coefficient of lateral earth pressure and the internal friction angle of soil. Finally, a design method is presented for the bored piles used for excavation work. In the presented design method, such factors as depth of excavation, pile diameter, interval between piles, pile length below bottom of excavation and pile stiffness, can be selected systematically.

  • PDF