This study aims to analyse the coefficient used to estimate the quay capacity per year at the container terminal. The capacity of the container terminal is composed of the capacity at the quay side and the other working conditions at the back of the quay side. But when we refer the capacity of the container terminal, generally we used capacity as that of the container terminal. To estimate the quay capacity independently of the working conditions at the back of quay side, we calculate the quay capacity as th product of working hours per year, productivity of container crane and relate other coefficients, such that berth utilization, crane utilization and efficiency. So that coefficients are properly defined to reflect the other working conditions. If we calculate the quay capacity by the product of working hours modified by the berth utilization and crane productivity modified by the crane utilization and efficiency, the meaning of that coefficients must be strictly defined. So there could be no confusion to apply that coefficients to calculate the quay capacity. In this study, we exclusively define the meaning of the berth utilization, crane utilization and efficiency according to the internal-meaning of thats in the function to calculate the quay capacity. And compare each coefficients by decomposing the working hours at the terminal.
The ship’s safe mooring stability is a principles for the safe cargo handling works at the mooring berth. Today numerous standards, guidelines and recommendations concerning mooring practices, fittings and equipments exist throughout the worldwide maritime industries. In recently, the mooring facilities were constructed as dolphin types at the open sea area apart far from shoreside instead of enclosed coastline area in accordance with increasing ship’s size and for preventing environmental pollution. Therefore the exciting wave condition must be considered as a basic environmental criteria with the wind force and current force for all of the mooring ships at the sea berth facilities. In this study, this added wave force as one of the environmental external forces by using the theoretical formula was applied to the LNG ship in Pyeongtaeg harbor needed the special mooring stability of the sea berth. Through this research, it can be confirmed that wave force is the very important factor in the mooring force and the strength of wave force works much more in the full laden condition than in the lightship condition. And also the wave force changes to non-linear states according to the wave frequency and wave length. In addition, the maximum limit criteria of environmental force of prohibiting the entering ship on the berth and loading works controlled by the port authority concerned of Pyeongtaeg port fully satisfies the condition of the mooring limit force recommended by OCIMF that the safe permitted force of the mooring line have to be within 55 % of MBL.
Most domestic container terminals are lack of container storage capacity compared to the throughput of container. The main reason is the difference between the theoretical capacity applied to the development of terminals and the real capacity of a berth Another reason seems to be the increase of the container crane in number per berth to match the need for the getting larger vessel, which is resulted from the increase of the berth capacity from the start. This study, therefore, aims to suggest the economic size of container yard by comparing the existing one. For this the berth capacity was recalculated, the required yard size derived considering up to 10,000TEU vessel and then cost comparison done.
Navy surface vessels require pier services such as emergency repair, oil supply, arm loading / unloading, craning, standby readiness, normal repair, gun arrangement, ammunition loading, and food loading during the period in port. The purpose of this study is to establish efficient berth allocation plan for navy surface vessels in home port under the limited resources of piers and equipments. This study suggests Mixed Integer Programming model for berth allocation problem, considering precedence relationships among services. For an effective analysis, the model is implemented by ILOG OPL(Optimization Programming Language) Studio 3.1 and ILOG CPLEX 7.0. The results of the model show reduction of berth shifts and increasement of service benefits.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.2
/
pp.165-171
/
2006
The appearance of over 10,000 TEU containerships (so called Mega-containerships) is determined. In order to operate these ships effectively, the number of these calling ports will diminish, and then feeder ships will transport cargoes from the hub-ports where mega-containerships call to the destination ports. In the hub-ports, handling containers for mega-containerships become huger, thus it is important for terminals to deal with cargo handling as soon as possible. However, the present terminal layout might have the limitation of maximum throughput per time unit. And then the transit time at the ports become longer. Therefore, we investigate the effect on some different terminal layouts with new alternatives. Actually, we discuss the ship-to-berth allocation at some adjacent berths for mega-containerships on three types of terminal layouts. First one is the conventional type consisted by some linear berths, most container terminals in the world are normally this type. Second one is the indented type consisted by linear berths and indented berths which we can handle from both sides of mega-containership simultaneously. Third one is the floating type consisted by linear berths and the floating berth. On this type, mega-containerships can moor between linear and floating berths. The merits of this type are that we can also handle from both sides of mega-containerships simultaneously, and ships can go through between linear berth and floating berths. Thus it is easier for ships to moor and leave berths. Under such assumptions, we examine the numerical experiments. In most cases, the total service times on the indented type are the longest among three types, these on the floating type are the next longer. Those reasons are that these layouts have the differences of berth occupancy obtained by the time and space axes, and whether the precedence constraints of ship service order needs or not.
Proceedings of the Korean Operations and Management Science Society Conference
/
2003.11a
/
pp.350-353
/
2003
Navy surface vessels require pier services such as emergency repair, oil supply, fm loading/unloading, crane, standby readiness, normal repair, gun arrangement, ammunition loading, and food loading during the period in port. The purpose of this study is to establish efficient berth allocation plan for navy surface vessels in home port under the limited resources of piers and equipments. The study suggests Mixed Integer Programing (MIP) model for bath allocation problem, considering precedence relationships among services. For a effective analysis, the model is implemented by ILOG OPL(Optimization Programming Language) Studio 3.1 and ILOG Cplex 7.0. The results of the model show reduction of berth shifts and increasement of service benefits. And thus, it would be a possibility of contribution in the improvement of fleet readiness.
This paper discusses the problem of scheduling berth and container cranes simultaneously in port container terminals. A mixed-integer programming model is formulated by considering various practical constraints. A heuristic algorithm is suggested for solving the mathematical model. A numerical experiment was conducted to test the performance of the suggested heuristic algorithm.
Proceedings of the Korea Society for Simulation Conference
/
2002.05a
/
pp.33-41
/
2002
This paper deals with the development of simulation model for the container terminal consisting of 3 berths, 8 container cranes, 16 yard blocks with each yard cranes and 90 yard trucks in order to evaluate the various operational rules. The proposed operational rules are 3 ship dispatching rules, 3 berth allocation rules, 2 crane allocation rules, 2 yard allocation rules and 2 yard truck allocation rules and 4 performance measures like ship time in the terminal, ship time in the port, the number of ships processed and the number of containers handled are considered. The simulation result are as follows. 1) no difference among 3 ship dispatching rules, 2) berth allocation rules depends on performance measures 3) dynamic crane allocation is better than fixed policy 4) pooling yard allocation is better than short distance yard allocation rules and 5) fixed yard truck allocation by berth is a little better than pooling policy.
The project comprised the construction of the new oil pier and associated topside facilities and demolition of exiting south pier. The site is located approximately 33km south of Kuwait city at MAA refinery. The approach trestle and berth structures of the new oil pier were designed to be supported by steel tubular piles Total 2,480 numbers of piles(795 piles at Approach Trestle, 1187 piles at Berth 1 -4 and 498 piles at Berth 5-6) had to be driven through the calcareous silty sand In this study, the design procedures for offshore steel pipe piles, evaluation for the compression and tension capacities by static and dynamic load test and effective driving criteria by the final set values are discussed
This paper deals with the development of a simulation model for the container terminal, which consists of 3 berths, 8 container cranes, and 16 yard blocks with each yard crane and 90 yard trucks in order to evaluate the various operational rules. The proposed operational rules are 3 ship-dispatching rules, 3 berth allocation rules, 2 crane allocation rules, 2 yard allocation rules, and 2 yard truck allocation rules. These rules are simulated using 4 performance measures, such as ship time in the terminal, ship time in the port, the number of ships processed, and the number of containers handled. The simulation result is as follows: 1) there is no difference among 3 ship-dispatching rules, 2) berth allocation rules depend on performance measures, 3) dynamic crane allocation is better than fixed policy, 4) pooling yard allocation is better than short distance yard allocation rules, and 5) fixed yard truck allocation by berth is a little better than pooling policy.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.