A Case Study on the Design and Drivability Criteria of Steel Pile in Offshore

해상 강관말뚝의 설계 및 항타시공관리 사례연구

  • 송명준 (현대건설 기술연구소) ;
  • 박영호 (현대건설 기술연구소) ;
  • 유석준 (현대건설 대만고속철도현장 설계과) ;
  • 심동현 (현대건설 기술개발원 토질부)
  • Published : 2006.12.01

Abstract

The project comprised the construction of the new oil pier and associated topside facilities and demolition of exiting south pier. The site is located approximately 33km south of Kuwait city at MAA refinery. The approach trestle and berth structures of the new oil pier were designed to be supported by steel tubular piles Total 2,480 numbers of piles(795 piles at Approach Trestle, 1187 piles at Berth 1 -4 and 498 piles at Berth 5-6) had to be driven through the calcareous silty sand In this study, the design procedures for offshore steel pipe piles, evaluation for the compression and tension capacities by static and dynamic load test and effective driving criteria by the final set values are discussed