This paper deals with an economical sampling plan, recently being concentrated on and, namely, investigates how to determine the basic concepts to settle the sampling plan of a minimum cost. On an inspection of sampling, a Linear Cost Model of a cost function which is concerned with the representative cost dements, is established and by the investigation of its possible solution economical single sampling plan for recitying inspection by attribute is suggested.
Recently, the issue of construction safety is growing. In the construction industry, accidents have continued to increase since 2000. In particular, the number of accident deaths at small and medium-sized construction sites accounts for 72.11% of the total number of accident deaths in the construction industry. For construction safety, prior safety evaluation systems such as Design for safety and safety management plan preparation are in place. However, at construction sites, these systems are recognized as formal legal documents, and their effectiveness is greatly reduced. Therefore, in this study, a linkage model that links design safety review information and safety management plan information was presented so that the safety management plan can be efficiently established. In addition, the effectiveness of the proposed process was verified as an example of actual work. The linkage model will contribute to improving the safety management environment at the site by increasing the productivity of safety management work by enabling easy sharing of risk factor information in the construction stage safety management work. The results of this study will be used as basic information for the development of the integrated safety management system.
[Purpose] Recently, skyscrapers have sharply increased throughout the world, including South Korea. Although a skyscraper has its own merit such as the landmark of a city, it also has various problems like massive energy consumption. This study is aimed to establish the concept of environment-friendly skyscraper and propose a plan to realize skyscraper after analyzing the architectural, facility and environmental friendly elements of skyscrapers. [Method] This study lists up skyscrapers over 40 floors and 200 meters high. Upon 10 constructed buildings, it analyzes their basic plans and the green building technologies applied to them and suggests effective and environment-friendly architectural plan. [Result] This study examined the distinctions of the layout, shape, facade, and floor plan plane of 10 skyscrapers and found out specific techniques to be used for the use plan of natural energy, plan for saving resources and reducing wastes and a plan for environmental architecture and system.
Jang Seog-Jae;Hwang In-Bum;Sung Jung-Hwa;Kim Hae-Seok
Journal of the Korean Society for Railway
/
v.9
no.3
s.34
/
pp.325-329
/
2006
Quite a few of persons often fall into an error that ISO has happened an additional work at construction sites. Supervision works, however, are carried out in compliance with 'Guidelines for the Supervision Works' which is including most ISO Requirements. Additional requirements needed for the supervision works are not many. This study has studied on the ISO application of supervision works in relation to, 1) ISO 9001 & KS A 9001 Quality Management System Basic Model, 2) The Process of Railway Construction Work Supervision Quality Management Plan, 3) Supervision Work Performance Guide Book(2005) & KS A 9001(2001) Standard, at the railway construction sites.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.153-157
/
2010
As the recent economic downturn continues to undermine the profits of construction industry in Korea, it has become ever more pressing to improve productivity of the industry. Since construction site management manpower staffing plan has close bearing on the productivity of construction projects, it is essential to estimate and mobilize adequate number of resources as per conditions and characteristics of each construction site. However, there are no reference approaches in practice to provide baseline for site management manpower staffing plan or estimation of manpower requirement. Therefore, this study aims to examine factors affecting productivity that warrants first and foremost consideration in development of site management manpower staffing plan during the initial phase of building construction project by conducting survey on industry stakehoders with hands-on responsibilities in construction sites and analyzing their responses. Conclusions herein will provide basic inputs for subsequent studies on development of site management manpower staffing plan as per project characteristics.
Energy consumption of building is given a sizable portion in total national energy conservation and if current trends continues, energy conservation level will rise as level of developed country. For this reason, a basic plan is proposed for integrated management system to manage energy conservation of buildings using a link with energy information and building information. Specifically, the questionnaire investigation conducted by building energy expert is performed to determine the projects along with time schedule and demands level of management system. In addition, to investigate study on energy usage information and management situation the management architecture of energy supplier is also studied.
The Journal of Korean Association of Computer Education
/
v.13
no.2
/
pp.71-80
/
2010
This study has its purpose on analyzing the problems of data connection between general management institution and itemized management institution shown through the college information disclosure project and presenting the plan to substantialize data connection between general management institution and itemized management institution. To make close inquiry into the related problem and induce plans for substantialization, this study analyzed the previous related research data as well as the connection status of information disclosure item of Korea Foundation for the Promotion of Private School, the itemized management institution, to induce problems; induced substantialization plan for data connection of itemized connection institution. As for the substantialization plan based on such, plan to integrate schools and department codes, plan to automatize data connection and plan to secure reliability of information were established. It is anticipated that the plan to substantialize data connection between management institutions reckoned through the result of this study would be used as the basic data for information disclosure project providing various reliable information from Ministry of Education, Science and Technology, General management institution, itemized management institution and college.
Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.119-123
/
2010
Recent economic slump has highlighted the needs for the construction industry to develop strategies to improve productivity and overhaul organization structure. Notably, it is urgent to improve productivity of apartment building construction projects that account for about half of the aggregate revenue of building construction projects in Korea. As construction site management manpower staffing plan has close relation with the productivity of building construction, it is essential to staff construction sites adequately in consideration of site conditions and characteristics. However, construction companies of Korea are still far from developing site management manpower staffing plan in reference to quantitative standards. Therefore, this research aims to analyze site management manpower staffing plan of apartment building construction project by means of density analysis. To be more specific, site organization charts and staffing plans of apartment building construction projects put together by large construction companies in Korea are studied and essential resources and their mobilization time of apartment building construction projects are examined. Conclusions herein will provide basic inputs to subsequent studies of apartment building construction site management manpower staffing standards.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.