• 제목/요약/키워드: average cost per unit time.

검색결과 43건 처리시간 0.024초

조달기간(調達期間)이 불확실(不確實)한 상황하에서의 부분부(部分負) 재고모형(在庫模型)에 관한 연구(硏究) (A Study on the Inventory Model with Partial Backorders under the Lead Time Uncertainty)

  • 이강우;이상도
    • 대한산업공학회지
    • /
    • 제17권1호
    • /
    • pp.51-58
    • /
    • 1991
  • This paper presents a single-echelon, single item, stochastic lead time and static demand inventory model for situations in which, during the stockout period, a fraction ${\beta}$ of the demand is backordered and the remaining fraction $(1-{\beta})$ is lost. In this situations, an objective function representing the average annual cost of inventory system is obtained by defining a time-proportional backorder cost and a fixed penalty cost per unit lost. The optimal operating policy variables minimizing the average annual cost are calculated iteratively. At the extremet ${\beta}=1$, the model presented reduces to the usual backorder case. A numerical example is solved to illustrate the algorithm developed.

  • PDF

일반화된 모델에 대한 최적 교체정책에 관한 연구 (On Optimal Replacement Policy for a Generalized Model)

  • Ji Hwan Cha
    • 품질경영학회지
    • /
    • 제31권3호
    • /
    • pp.185-192
    • /
    • 2003
  • In this paper, the properties on the optimal replacement policies for the general failure model are developed. In the general failure model, two types of system failures may occur : one is Type I failure (minor failure) which can be removed by a minimal repair and the other, Type II failure (catastrophic failure) which can be removed only by complete repair. It is assumed that, when the unit fails, Type I failure occurs with probability 1-p and Type II failure occurs with probability p, $0\leqp\leq1$. Under the model, the system is minimally repaired for each Type I failure, and it is repaired completely at the time of the Type II failure or at its age T, whichever occurs first. We further assume that the repair times are non-negligible. It is assumed that the minimal repair times in a renewal cycle consist of a strictly increasing geometric process. Under this model, we study the properties on the optimal replacement policy minimizing the long-run average cost per unit time.

주기적인 검사 정책하에서 최적예방 교체시기 결정에 관한 연구 (A Study of Optimal Maintenance Schedules of a System under the Periodic Inspection Policy)

  • 정현태;김제승
    • 산업경영시스템학회지
    • /
    • 제20권44호
    • /
    • pp.263-271
    • /
    • 1997
  • This paper presents a preventive maintenance model for determining the preventive replacement period of a system in which a failure rate is affected by the cumulative damage of fault and inspection. Especially, the failure rate function is considered to be a function of the cumulative damage of the fault and inspection time. Types of replacement considered are preventive replacement and failure replacement. Failure rate and expected cost function between replacement are derived. An optimal policy is obtained that minimizes the average cost per unit time for preventive replacement, failure replacement, inspection and repair.

  • PDF

Inventory Model with Partial Backorders

  • Park Kyung S.
    • 한국국방경영분석학회지
    • /
    • 제9권1호
    • /
    • pp.69-74
    • /
    • 1983
  • This article presents a deterministic inventory model for situations in which, during the stockout period, a fraction ${\beta}$ of the demand is backordered and the remaining fraction $1-{\beta}$ is lost. By defining a time proportional backorder cost and a fixed penalty cost per unit lost, a convex objective function representing the average annual cost of operating the inventory system is obtained. The optimal operating policy variables are calculated directly. At the extremes ${\beta}\;=\;1$ and ${\beta}\;=\;0$ the model presented reduces to the usual backorders and lost sales case, respectively.

  • PDF

[ $P_{\lambda,;,T}^M-policy$ ] of a finite dam with both continuous and Jumpwise inputs

  • Lim Kyung Eun;Baek Jee Seon;Lee Eui Yong
    • 한국통계학회:학술대회논문집
    • /
    • 한국통계학회 2004년도 학술발표논문집
    • /
    • pp.123-128
    • /
    • 2004
  • A finite dam under $P_{\lambda,;,T}^M-policy$ is considered, where the input of water is formed by a Wiener process subject to random jumps arriving according to a Poisson process. Explicit expression is deduced for the stationary distribution of the level of water. And the long-run average cost per unit time is obtained after assigning costs to the changes of release rate, a reward to each unit of output, and a penalty which is a function of the level of water in the reservoir.

  • PDF

Constrained Optimality of an M/G/1 Queueing System

  • Kim, Dong-Jin
    • 한국통계학회:학술대회논문집
    • /
    • 한국통계학회 2003년도 춘계 학술발표회 논문집
    • /
    • pp.203-206
    • /
    • 2003
  • This paper studies constrained optimization of an M/G/1 queue with a server that can be switched on and off. One criterion is an average number of customers in the system and another criterion is an average operating cost per unit time, where operating costs consist of switching and running costs. With the help of queueing theory, we solve the problems of optimization of one of these criteria under a constraint for another one.

  • PDF

Optimal Inspection Period for the System Subject to Random Shocks

  • Kim, Sung-Soon;Choi, Seung-Kyoung;Lee, Eui-Yong
    • Journal of the Korean Data and Information Science Society
    • /
    • 제16권4호
    • /
    • pp.725-733
    • /
    • 2005
  • A system subject to random shocks is considered. The shocks arrive according to a Poisson process and the amount of each shock is exponentially distributed. In this paper, a periodic inspection policy for the system is compared with a random inspection policy. After assigning several maintenance costs to the system, we calculate and compare the long-run average costs per unit time under two policies.

  • PDF

Analysis of a Random Shock Model for a System and Its Optimization

  • Park, Jeong-Hun;Choi, Seung-Kyoung;Lee, Eui-Yong
    • Journal of the Korean Data and Information Science Society
    • /
    • 제15권4호
    • /
    • pp.773-782
    • /
    • 2004
  • In this paper, a random shock model for a system is considered. Each shock arriving according to a Poisson process decreases the state of the system by a random amount. A repairman arriving according to another Poisson process of rate $\lambda$ repairs the system only if the state of the system is below a threshold $\alpha$. After assigning various costs to the system, we calculate the long-run average cost and show that there exist a unique value of arrival rate $\lambda$ and a unique value of threshold $\alpha$ which minimize the long-run average cost per unit time.

  • PDF

Analysis of a Random Shock Model for a System and Its Optimization

  • 박정훈;최승경;이의용
    • 한국데이터정보과학회:학술대회논문집
    • /
    • 한국데이터정보과학회 2004년도 추계학술대회
    • /
    • pp.33-42
    • /
    • 2004
  • In this paper, a random shock model for a system is considered. Each shock arriving according to a Poisson process decreases the state of the system by a random amount. A repairman arriving according to another Poisson process of rate $\lambda$ repairs the system only if the state of the system is below a threshold $\alpha$. After assigning various costs to the system, we calculate the long-run average cost and show that there exist a unique value of arrival rate $\lambda$ and a unique value of threshold $\alpha$ which minimize the long-run average cost per unit time.

  • PDF

다수의 고장유형을 갖는 제철설비의 최적 정비주기 산출 (Determining the Optimum Maintenance Period of the Steel Making Equipment Having Multiple Failure Types)

  • 송홍준;전치혁
    • 산업공학
    • /
    • 제16권1호
    • /
    • pp.27-33
    • /
    • 2003
  • The maintenance cost in K Steelworks has been continuously increased in proportion to the production cost. However, there seems to be a possibility of reducing cost through the optimization of maintenance actions. The failure types of the equipment in steelworks ate various with different failure cost. Thus the failure rate and cost of each type of failures should be considered simultaneously when the optimum maintenance period is to be determined. It is considered that the equipment undergoes periodic replacement and a specified number of incomplete preventive maintenance actions are performed during a replacement period. Assuming that the time to failure follows a Weibull distribution, the parameters of the failure rate are estimated using the maximum likelihood estimation. The optimal replacement period is determined to minimize the average cost per unit time. As the result of analysis it is suggested that the existing maintenance period for a hot-rolling equipment can be extended significantly.