• 제목/요약/키워드: architectural work

검색결과 1,066건 처리시간 0.024초

$1910{sim}1965$ 건조물문화재 보수공사의 시공특징에 관한 연구 (A Study on the Peculiarity of Construction Work for Architectural Properties during $1910{sim}1965$)

  • 김재국
    • 건축역사연구
    • /
    • 제15권1호
    • /
    • pp.77-99
    • /
    • 2006
  • This study is on the construction work of Preservation for Korean architectural properties during the period of japan invader. Korea lost their preservation ability of architectural properties when went through specific background from 1910 to 1945, which was the period of japan invader. Through this situation japan had to face the preservation of architectural properties for japan and korea. After 1945, korea has preserved the architectural properties over 50's years and which accomplishment every yew. Also, there are some architectural properties which registered in world heritages. However, the study of this period is not studied enough. Especially a construction work for architectural properties during this period is not become known. Therefore, the purpose of this study is for three. First is to analyze construction work data(a specifications and etc.) for accessing originality of korea architectural properties. Second is to understand about the construction works of preservation for the korean architectural properties. and the last is to compare the peculiarities of construction work of Preservation for korean architectural properties between during 1910-1945 and 1945-1965.

  • PDF

건축공사 공종별 위험지수 산정모델에 관한 연구 (A Study on the Risk Index Model of Work Type in Architectural Construction Work)

  • 장성록;고성석;이종빈
    • 한국안전학회지
    • /
    • 제22권6호
    • /
    • pp.63-68
    • /
    • 2007
  • The purpose of this study is to verify the relation between the risk index using AHP(Analytic Hierarchy Process) and the risk index using Computing Model. For doing the objective, this research classified 22 work types in architectural construction work from the analysis Korean architectural standard specification and Korea occupational safety & health agency code. Based on the classified 22 work types in architectural construction work, the risk index of each work type was calculated by AHP and Computing Model. For verifying the correlation of risk index between AHP and Computing Model methods, SAS version 8.0 System, which is one of the statistics programs, was used.

Improvement Plan of Daily Work Accomplishment Index based Process Management based on Lean Construction Principles

  • Yoo, Dong Uk;Hong, Eun Hwa;Choi, Byung Sun;Chae, Myung Jin;Chun, Jae Youl
    • Architectural research
    • /
    • 제20권4호
    • /
    • pp.147-152
    • /
    • 2018
  • As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.

AHP를 이용한 건축건설공사 공종별 위험도 분석 (Risk Level Analysis of Architectural Work using AHP)

  • 김정민;이종빈;장성록
    • 한국안전학회지
    • /
    • 제32권5호
    • /
    • pp.96-102
    • /
    • 2017
  • The highest fatal accident ratio was recorded in the construction industry. According to the industrial insurance premium rate & business type example, among the construction industry, the architectural work has the highest fatal and loss time accident ratio. Previous literature has investigated various aspects of accident occurrence and prevention in architectural work. However, those studied were limited in that they only focused on the fatal accident without considering the loss time accident. But non fatal accidents were recorded more than 50 times of fatal accidents. Therefore non fatal accidents must be controlled to lessen industrial accidents. Based on this, the goal of this study was to investigate the nature of the loss time accident and derive the risk index of work type in architectural work. In this study, opinions of safety experts were gathered and the risk index of work type was derived using AHP(Analytic Hierarchy Process). And verification was accomplished by comparing the results of this study with the risk index derived by analysis of accident records. Results showed that the risk index of work type was significantly higher in steel frame work, temporary installation work, earth & foundation work, facilities work, concrete work. And statistical analysis for verification showed that coefficient of Pearson correlation was 0.686 and P-value was 0.001.

Labor Productivity Model for Reinforced Concrete Construction Projects

  • Ho Myun Jang;Kyong Hoon Kim;Sang Hyeon Kim;Kyung Hwan Kim;Jae Jun Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.983-989
    • /
    • 2009
  • This study aims to systematically identify direct and indirect factors that influence labor productivity and to build a model that mathematically quantifies them so as to efficiently manage and increase labor productivity in the construction work. This study was performed based on the productivity model for workers in reinforced concrete construction projects, because it aims to establish a general construction labor productivity model that reflects many factors that influence labor productivity. Using statistical analysis, we found that the components that significantly influence productivity were the worker component, the work characteristic component, the work technique component, the work management component, the equipment & materials component, and the work guide component, while the work delay components did not significantly influence productivity. In addition, a priority analysis was performed based on the components that showed statistically significant effects. The results of the analysis indicated that the influence of work management component and the work technique component is more than that of the worker component and the work characteristic component. The construction labor productivity model that was formulated in this study could be used for the determining the standard productivity during the initial planning stage, so the best strategy for increasing labor productivity could be formulated.

  • PDF

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

석굴암, 세 번의 수리 공사와 세 개의 공간 개념 - 석굴암 건축과 안팎의 공간 구분을 중심으로 - (Thrice Repair Works and Three Space Conceptions in Seokguram - focusing on Seokguram Architecture and Virtual Space Division of Inside and Outside -)

  • 윤재신
    • 대한건축학회논문집:계획계
    • /
    • 제35권8호
    • /
    • pp.89-100
    • /
    • 2019
  • The purpose of this study is to critically review the repair works of Seokguram architecture and to search for its original form and space. Seokguram's architectural form has been transformed throughout three repair works. The first transformation occurred during the repair work of the Colonial Government in 1913-1915, and the second occurred during the repair work of the Colonial Government in 1920-1923. The repair work done by the Korean Government in 1961-1964 also caused a severe change in the architectural form and space of Seokguram architecture. The more the repair work was added to Seokguram, the more its original form flew away like a mirage. Through the three repair works, the spatial composition of Seokguram changed in the following directions: from ((front chamber + passageway) + main chamber) to (front chamber + (passageway + main chamber)) through the second repair work, from (front chamber + (passageway + main chamber)) to (front chamber + passageway + main chamber) through the last repair work. Although the compositional space hierarchy of Seokguram was maintained during the first repair work, the architectural form based on the dry method was changed to the form based on the wet method. The Korean government's repair work was a tragedy for the 'Seokguram conservation project' that the people who led the conservation process misunderstood the architectural nature of Seokguram.

공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석 (Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments)

  • 이진응;김병윤;정병주
    • 한국건축시공학회지
    • /
    • 제15권5호
    • /
    • pp.491-500
    • /
    • 2015
  • 본 연구에서는 공동주택에서 건설 공사비 증가의 원인이 되는 하자에 대하여 건설업체의 공급자 중심이 아닌, 소비자가 법적인 하자보수 책임기간 만기를 앞두고 안전진단 전문기관에 의뢰하여 얻은 하자진단 결과보고서 자료를 근거로 공종별 하자실태를 조사하였다. 또한, 보수비용적 측면에서 세부요인을 분석하여, 시공단계에서의 품질향상과 하자분쟁 해결의 객관적이며 기초적인 자료를 제시하였다.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF