• Title/Summary/Keyword: architectural construction work

Search Result 634, Processing Time 0.029 seconds

A Study on the Peculiarity of Construction Work for Architectural Properties during $1910{sim}1965$ ($1910{sim}1965$ 건조물문화재 보수공사의 시공특징에 관한 연구)

  • Kim, Jae-Kuck
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.77-99
    • /
    • 2006
  • This study is on the construction work of Preservation for Korean architectural properties during the period of japan invader. Korea lost their preservation ability of architectural properties when went through specific background from 1910 to 1945, which was the period of japan invader. Through this situation japan had to face the preservation of architectural properties for japan and korea. After 1945, korea has preserved the architectural properties over 50's years and which accomplishment every yew. Also, there are some architectural properties which registered in world heritages. However, the study of this period is not studied enough. Especially a construction work for architectural properties during this period is not become known. Therefore, the purpose of this study is for three. First is to analyze construction work data(a specifications and etc.) for accessing originality of korea architectural properties. Second is to understand about the construction works of preservation for the korean architectural properties. and the last is to compare the peculiarities of construction work of Preservation for korean architectural properties between during 1910-1945 and 1945-1965.

  • PDF

A Study on the Risk Index Model of Work Type in Architectural Construction Work (건축공사 공종별 위험지수 산정모델에 관한 연구)

  • Chang, Seong-Rok;Go, Seong-Seok;Lee, Jong-Bin
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.6
    • /
    • pp.63-68
    • /
    • 2007
  • The purpose of this study is to verify the relation between the risk index using AHP(Analytic Hierarchy Process) and the risk index using Computing Model. For doing the objective, this research classified 22 work types in architectural construction work from the analysis Korean architectural standard specification and Korea occupational safety & health agency code. Based on the classified 22 work types in architectural construction work, the risk index of each work type was calculated by AHP and Computing Model. For verifying the correlation of risk index between AHP and Computing Model methods, SAS version 8.0 System, which is one of the statistics programs, was used.

Improvement Plan of Daily Work Accomplishment Index based Process Management based on Lean Construction Principles

  • Yoo, Dong Uk;Hong, Eun Hwa;Choi, Byung Sun;Chae, Myung Jin;Chun, Jae Youl
    • Architectural research
    • /
    • v.20 no.4
    • /
    • pp.147-152
    • /
    • 2018
  • As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.

Labor Productivity Model for Reinforced Concrete Construction Projects

  • Ho Myun Jang;Kyong Hoon Kim;Sang Hyeon Kim;Kyung Hwan Kim;Jae Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.983-989
    • /
    • 2009
  • This study aims to systematically identify direct and indirect factors that influence labor productivity and to build a model that mathematically quantifies them so as to efficiently manage and increase labor productivity in the construction work. This study was performed based on the productivity model for workers in reinforced concrete construction projects, because it aims to establish a general construction labor productivity model that reflects many factors that influence labor productivity. Using statistical analysis, we found that the components that significantly influence productivity were the worker component, the work characteristic component, the work technique component, the work management component, the equipment & materials component, and the work guide component, while the work delay components did not significantly influence productivity. In addition, a priority analysis was performed based on the components that showed statistically significant effects. The results of the analysis indicated that the influence of work management component and the work technique component is more than that of the worker component and the work characteristic component. The construction labor productivity model that was formulated in this study could be used for the determining the standard productivity during the initial planning stage, so the best strategy for increasing labor productivity could be formulated.

  • PDF

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

Disaster Risk Assessment by Work Unit of Construction Work for Improve the Efficiency of Design for Safety Task (설계의 안전성 검토(DFS) 업무의 효율성 증대를 위한 공동주택 건설공사의 단위작업별 재해위험성 평가)

  • Kim, Jin-Won;Kim, Jae-Jun
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.6
    • /
    • pp.45-53
    • /
    • 2018
  • The construction work to establish a safety management plan should be carried out Design for Safety(DFS) task by the designers from May 2016 according to the amendment of the Construction Technology Promotion Act. However, designers lack experience in construction work and lack of information on safety accidents, so it is not easy to predict a disaster that may occur during the construction phase. Therefore, the purpose of this study is to provide information about disasters that can occur in each construction work in order to enable designers to efficiently perform DFS task in the design phase. In this study, the construction work was classified by work unit and the disaster risk assessment was conducted using the Failure Mode and Effect Analysis technique. The disaster information by work unit analyzed in this study can be used to provide designers with an alternative to prevent disasters at the design stage. Disaster information by work unit of apartment construction can be used by designers to prepare an alternative for disaster prevention at the design stage.

An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings

  • Kim, Sun-Kuk;Son, Ki-Young;Joo, Jin-Kyu;Lee, Dong-Hoon;Lee, Sung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.396-406
    • /
    • 2011
  • Execution of the finish work for high-rise residential construction occurs when a mixture of work progresses simultaneously at each floor or sector and is carried on by highly-specialized subcontractor teams. Therefore, the finish work plan requires an effective scheduling method that interfaces between the work and the teams. In order to address these issues, the TACT technique is utilized in Korea. This technique is based on Line-of-Balance and Lean construction. However, according to recent case studies, finish work using TACT technique was frequently delayed with cost overruns because the work was performed without a detailed schedule control plan outlining the relationship between architecture and mechanical, electrical, and plumbing work. This paper describes the enhanced-TACT technique which provides a detailed work flow chart and TACT work template. With improved TACT technique, this paper will contribute to improved cash flow and reduced cycle time and provide quality improvement through work continuity.

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • v.15 no.3
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.