• Title/Summary/Keyword: architectural change

Search Result 1,123, Processing Time 0.028 seconds

A Study on the Features of Architectural Concept Applied in Maison Guiette and Le Corbusier's 'Five Points of a New Architecture' (귀에트 주택에 나타난 르 꼬르뷔지에의 건축개념 및 제5원칙에 관한 고찰)

  • Kim, Jong-Sung
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.7
    • /
    • pp.89-99
    • /
    • 2019
  • The purpose of this study is to reveal the meaning of Le Corbusier's works focused on Maison Guiette. This House was completed in 1926, 4 year later than the work of the Citrohan and also, this house is the only remaining mixed use Dwelling in Belgium. It offers a fine example of the early architectural concepts of Le Corbusier's. Despite these important facts, the meanings of the ideas of this house have not been paid attention as much as other houses constructed at the same period, such as Maison La Roche, Maison Stein de Monzie, Villa Savoye, etc. In his book, 'Oeuvre Complete 1910-1929', Le Corbusier mentioned as follows: "A special solution imposed by Belgian housing developments characterized by a dimension of 6 meters of frontage and a very great depth. The staircase serving the various floors is like the ladder of Jacob climbs Charlie Chaplin in the "Kid" and This house is an architectural experiments of his ideas. And this study aims at analysing the relationship between Maison Guiette and spaces on the basic of Le Corbusier's 'Five Points of a New Architecture' which had a great effects on architectural history and became a fundamental elements for the change into the Modern housing. By analysing the points in regard with the Features of Architectural Concept Applied in Maison Guiette, The Five Points are the background of the interpenetration of the interior and the exterior. To attain this, this research appraises each points in detail in regards with Maison Guiette. The study of Maison Guiette will be an important architectural subject to clarify the meaning of his later works and ideas.

A Study on the Usage Change of National Land in Keijo(京城) Focus on Surrounding Area Near #193, 2nd-Hwanggeum-Jeong(黃金町)

  • Sim, Eun Ae;Han, Dong Soo
    • Architectural research
    • /
    • v.18 no.4
    • /
    • pp.165-170
    • /
    • 2016
  • This study investigates the course of transformation of the capital city of the Korean Empire into a colonial city during the Japanese rule by focusing on state-owned lands at and near #193, 2nd jeongmok(丁目), Hwanggeum-jeong(黃金町) in Keijo(京城). The study reveals that although the colonial rulers had made it apparent that they acted in the benefit of the Korean Empire, in reality, they had taken dexterous and gradual steps to change the purpose of the lands in order to utilize them as desired. Briefly, the usage of the lands was changed several times from Daedong-gurakbu(大同俱樂部) to Gyeongseong Exposition(京城博覽會) and to Nongsanggongbu Office(農 商工部) up until the Japan-Korea Annexation Treaty. Following this, the lands were bestowed upon the pro-Japanese, including Guijokhoigwan(貴族會館), as a means of Japan's assimilation policy. The changes in the usage of the buildings on the lands and the land use show how the rulers' intentions were reflected in the space of the ruled.

A study on non-hierarchy of the interior space based on complexity of modern spatial program (현대 공간 프로그램의 복합화에 따른 실내공간의 위계소거에 관한 연구)

  • Park, Eun-Sil;Lim, Jong-Yup
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.11a
    • /
    • pp.209-212
    • /
    • 2006
  • To develop in the long view, based on context of city, the spatial program change to new spatial program that can be adopt city architectural environment. The new spatial program must have paring lot, open space, community center, which are infra structure for citizen. The needs about flexible space Increase according to complexity of spatial program. The space of absolutism, is made up hierarchy, can't accommodate complexity of spatial program. Therefore, modern architectural spaces are characterized by non-hierarchy. This research is tendency to search special quality of space program that is going complex composition according to change of modern society and modern architecture space, and analyze characteristic of inner space that have non-hierarchy to correspond hereupon.

  • PDF

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

A Study on the Architectural Planning of the Spaces Related With Digital Network System in General Hospital (병원 정보화 관련 실(室) 계획에 대한 연구)

  • Lim, Sung-Jae
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.6 no.11
    • /
    • pp.107-116
    • /
    • 2000
  • The digital network system is one of the most important features in the resent hospital buildings. This study is to lay out a guideline of architectural planning according to the hospitals with digital network system. First, this study develops the concept of hospital building digital network system and reports the survey results of domestic general hospitals for this matter. Required spaces by digital network system in general hospital are classified into two categories. One is equipment room, main equipment room and a telecommunication closet, to accommodate network facilities. The other is the spaces related with medical information, medical archives and the department of radiology, because digital network system makes a change the form and use of information. In result, this study proposes models for each equipment room and raises the possibility of size change of information-spaces.

  • PDF

A Study on the Creation and the Meaning of Cadastral Records in Japanese Colonial Period (일제강점기 지적공부(地籍公簿)의 작성과 의미)

  • Song, Hye-Young
    • Journal of architectural history
    • /
    • v.27 no.2
    • /
    • pp.29-38
    • /
    • 2018
  • This study is to find out the process of changes concerning the cadastral records that consist of the cadastre, the cadastral map and various registers of land in Japanese Colonial Period. The cadastre and cadastral map were the most important part of them and became the basis of cadastral records. These two registers were first made out according to the Project of Colonial Land Survey in the year 1912. As the influx of foreign Weights and Measures was greatly influenced by the foreign concession since 1876, the traditional units of the Weights and Measures had abolished finally. The extortion of sovereignty led a rapid change to the Weights and Measures in 1910. Japan compelled us to change into Japanese System of Measurement. From that time on, Lot(筆地) and Pyeong(坪) were settled down on the registers of land.

A study on the Building Use code and Use change (건축물 용도분류와 용도변경 기준에 관한 연구)

  • Shim, Jae-Heon;Lee, Won-Geun;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.3 no.2
    • /
    • pp.39-46
    • /
    • 2003
  • Now we using purpose area rule of city planning code in city planning areas for efficient, economical use of land and increasement of common welfare. Architectural code restrict building purpose after each division of area and this aimed for making more comfortable and convenient living atmosphere in city environment. Through this research we extracted conclusion about purpose area distinction system and restriction of building purpose after examined changes and tendencies of these rules. And the conclusion is the changes of purpose area distinction system issued from 32 kinds of distinctions in 1978, 28, 30, 32 kinds of distinctions in 1992 to 21kinds of distinctions in 1999 are caused by demand of enabling different purposes of programs can exist within one building possible.

  • PDF

Delay Factors in Building Construction Projects in Rwanda

  • Umuhoza, Esperance;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.467-475
    • /
    • 2019
  • Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.

The Establishment and Change of Busan Ami-dong Crematorium in Japanese Colonial Period (일제강점기 부산 아미동 화장장의 설립과 변천)

  • Song, Hye-Young
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.5
    • /
    • pp.89-96
    • /
    • 2018
  • Ami-dong Crematorium in Busan was established as one of the public facilities in 1929(the period of Japanese Occupation). It is the originator of Busan Yeongnak-Park(永樂公園), the funeral facilities of Busan municipality. The crematorium of Busan region was accepted at an earlier stage inside Japanese Concession in accordance with the opening a port. As Ami-dong Crematorium was constructed as a public facilities, the precedent has been maintained so far, providing a background equipped with the leading public corporation facilities in Busan area. This study was based on the expansion construction document founded by National Archives in Korea. Above all things, this research revealed the establishment and change of Busan Ami-dong Crematorium as the historical point for the formation process of recent public funeral facilities.

An Analysis of Seismic Response of High - Rise Building with Mid-Story Isolation System According to Change of Characteristics of the Seismic Isolation Device (중간층 면진시스템이 적용된 고층건물의 면진장치 특성변화에 따른 지진응답분석)

  • Kang, Joo-Won
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.8
    • /
    • pp.149-156
    • /
    • 2019
  • In this study, dynamic responses of high - rise buildings were analyzed through the change of horizontal stiffness and yield strength among characteristics of seismic isolation system by applying middle - layer seismic isolation system to high - rise buildings of 120m height. As a result in order to prevent the displacement of the isolation layer and to control the maximum torsion angle, it is possible to appropriately control by increasing or decreasing the horizontal stiffness and the yield strength. However, depending on the maximum torsional angle and the hysteretic behavior of the seismic isolation system, excessive yield strength and horizontal stiffness increase may induce the elastic behavior of the structure and amplify the response. Therefore, it is considered that it is necessary to select the property value of the appropriate isolation device.