Proceedings of the Korean Institute of Building Construction Conference
/
2013.05a
/
pp.210-212
/
2013
The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.4
/
pp.1299-1306
/
2014
Recently, there are many roundabouts installation works which are ordered to provide convenient transportation to road users as well as to eliminate traffic accidents and traffic delays. This study propose an approximate construction cost estimation model for early stages of roundabout construction. The model is designed considering the conditions of the early stage roundabout construction sites in Jeju. The regression equation of approximate construction cost was derived through regression analysis of 25 design data of roundabout construction in Jeju, and it was analyzed to have a high prediction accuracy. Finally, results verifies high prediction accuracy of the derived regression equation. Difference between the estimation cost and the design cost was only 2.3%, 3.7%, and 5.8% that verifies the high accuracy of the proposed approximate construction cost estimation model.
To effectively secure and execute the national budget, it is very important to estimate the reasonable construction cost of each process in the construction of public facilities and works. The construction cost is generally estimated at the time when the design of the targeted structures has been completed. Without detailed sectional drawings and with only simple information on bridge structures in the planning stage or in the early design stage. it would be very difficult to predict the approximate construction cost. In this study, a more efficient and appropriate approximate construction cost estimation model in the planning stage and in the early design stage is presented and verified as reliable by analyzing the construction cost data of 61 existing steel box girder bridges from previous studies. The results of this study show that when the construction cost that was predicted using the construction cost estimation model in the design stage was compared with the cost from the conventional standards, the suggested model in this study produced results with a very high confidence level.
Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
International conference on construction engineering and project management
/
2009.05a
/
pp.1170-1175
/
2009
When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.
Cho, Jeongyeon;Kim, Sang-Kwi;Kim, Kyoungmin;Kim, Kyong Ju
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.5D
/
pp.677-684
/
2008
The paper provides an approximate cost estimating model that can be used for tunnel. Based on the previous study analyzed critical factors that have impact on tunnel construction cost, this paper establishes a cost variance index table that reflects the cost impacts due to the change of the critical cost factors. An estimating procedure is described utilizing the index table. For the verification of the suggested model, the comparison of the estimated construction cost with real project cost is performed. The estimated results range from 95%~111% of the real project costs. As an approximate tunnel cost estimating model, the model can be utilized to quickly estimate tunnel construction costs based on the conceptual information at the planning stage and to efficiently make a decision on design alternatives.
Korean Journal of Computational Design and Engineering
/
v.20
no.4
/
pp.431-442
/
2015
Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.
Korean Journal of Construction Engineering and Management
/
v.22
no.2
/
pp.42-52
/
2021
The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.
Journal of the Korean Society for Advanced Composite Structures
/
v.6
no.4
/
pp.24-29
/
2015
Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.
Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.5D
/
pp.665-675
/
2008
The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.
Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.212-215
/
2008
When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.