To effectively secure and execute the national budget, it is very important to estimate the reasonable construction cost of each process in the construction of public facilities and works. The construction cost is generally estimated at the time when the design of the targeted structures has been completed. Without detailed sectional drawings and with only simple information on bridge structures in the planning stage or in the early design stage. it would be very difficult to predict the approximate construction cost. In this study, a more efficient and appropriate approximate construction cost estimation model in the planning stage and in the early design stage is presented and verified as reliable by analyzing the construction cost data of 61 existing steel box girder bridges from previous studies. The results of this study show that when the construction cost that was predicted using the construction cost estimation model in the design stage was compared with the cost from the conventional standards, the suggested model in this study produced results with a very high confidence level.
공공 건설공사에서 공사 단계별 합리적인 공사비를 산정하는 것은 국가 예산의 효율적 확보 및 집행 등에 있어 매우 중요한 요소이다. 일반적으로 공사예정가격은 대상 구조물의 설계 종료시점에서 산출된다. 그러므로 대상 구조물의 구체적인 상세 단면이 주어지지 않은 기획단계 및 설계초기단계에서 교량 구조물에 대한 단순 정보만을 가지고 개략공사비를 추정하는 것은 상당히 어려운 문제일 것으로 생각된다. 본 연구에서는 선행연구에서의 61개의 강박스거더교 공사비 분석에 의해 효율적이고 적절한 기획단계 및 설계초기단계의의 개략공사비 산정 모델의 제시 및 타당성을 검증하고자 한다. 연구결과, 본 연구에서 제시된 공사비 산정 모델에 의해 얻어진 추정공사비는 기존에 사용된 방법과 비교할 때 매우 높은 신뢰도를 갖는 것을 알 수 있었다.