• 제목/요약/키워드: alternative process plan

검색결과 208건 처리시간 0.027초

네트 모델을 이용한 대체 공정 계획 생성 (Generation of Alternative Process Plan by Net Model)

  • 박지형;박면웅;강민형
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1994년도 추계학술대회 논문집
    • /
    • pp.743-747
    • /
    • 1994
  • A process planning system that generates alternative process plans offers multiple process plans for a part, thereby provides the flexibility to cope with the changes in shop floor status. In this paper, we introduce the concept of process net as a model for the generation of alternative process plans. We also show the usefulness of process net model by implementing the developed system to generate alternative process plans for rotational parts.

  • PDF

네트 모델을 이용한 대체 공정 계획 생성 (Generation of Alternative Process Plan by Net Model)

  • 박지형;박면웅;강민형
    • 한국정밀공학회지
    • /
    • 제14권1호
    • /
    • pp.168-173
    • /
    • 1997
  • A process planning system that generates alternative process plans offers multiple process plans for a part, thereby provides the flexibility to cope with the changes in shop floor status. In this paper, we intro- duce the concept of process net as a model for the generation of alternative process plans. We also show the usefulness of process net model in generating alternative process plans by implementing the developed sys- tem to construct process net, and devising an algorithm to generate alternative process plans for rotational parts.

  • PDF

계층화분석기법을 통한 구조물적 홍수방어 최적대안 선정 방안 연구 (A Method for Selecting a Structural Optimal Flood Mitigation Plan Using Analytic Hierarchy Process)

  • 이정호;전영준;안재현;김태웅
    • 한국방재학회 논문집
    • /
    • 제9권3호
    • /
    • pp.117-126
    • /
    • 2009
  • 유역종합치수계획 수립 시 유역 내 적용이 가능한 구조물적 비구조물적 치수계획은 매우 광범위하고, 특히 그 중에서도 구조물적 홍수방어 시설들의 특성은 매우 다양하다. 이들을 조합하여 유역의 홍수 저감능력을 최대화 하는 최적대안을 선정하는 것은 쉬운 일이 아니며, 현재 구조물적 홍수방어 후보대안에 대한 적절한 평가 기준이나 다양한 홍수방어 후보대안들 중 최적대안의 선정에 관한 지침 또한 미흡한 실정이다. 본 연구에서는 유역종합치수계획의 구조물적 홍수방어 후보대안들에 대한 치수경제성 및 정책성 평가 결과를 바탕으로 최적대안을 선정하는 과정에서, 의사결정기법 중의 하나인 계층화분석기법을 도입하여 적용함으로써 평가항목들 간의 가중치 결정 및 최적대안을 도출하는 과정을 예시하였다. 후보대안들 각각의 하위 세부 평가항목들의 가중치 결정에는 계층화분석기법 전용 프로그램인 Expert Choice 11.5를 활용하였으며, 연구 결과를 바탕으로 유역종합치수계획의 구조물적 홍수방어 최적대안 선정에 있어 보다 표준화된 절차를 제시하였다.

광양항 동측배후단지 2단계 사업지구 상징공원 및 수변공원 설계 (A Design for the Symbol Park and the Waterfront Park for the Second Stage Development in the Eastern Rear Complex of Gwangyang Harbor)

  • 홍형순;김도경;정한호
    • 한국조경학회지
    • /
    • 제34권3호
    • /
    • pp.104-119
    • /
    • 2006
  • The eastern rear business complex of the Gwangyang Harbor (second stage) has undergone the 'alternative bid' process by which a construction company is selected based on their suggestions for an alternative plan and the bid for the construction expenses is based on the previously completed original plan, thereby implicitly accepting the arrangement and scale of the park which was presented in the original plan. It is possible, however, that the concept and plan of each park needs to be approached in a new way within the extent of given design guidelines. This study focuses on the alternative plan process and the Symbol Park (the second neighborhood park) and Waterfront Park (the third neighborhood park) among the five neighborhood parks in the eastern rear business complex (second stage). These two parks provide scale and function for the structure of the park and greenways system at the eastern rear complex. The neighboring waterway is a significant resource for emphasizing the pre-development features of the site. The alternative plan process focuses on determining the resources for the park's plan based on the environmental analyses of the site and utilizing the results. That is, through an analysis of the current state, all available resources are determined and the facilities and activities are derived based on these results. By this, Symbol Park and Waterfront Park reflect the regional features of the eastern rear complex, and these parks will feasibly perform the role of the region's key parte. The limit of this study is the fact that there is no chance for landscape architecture to actively play a role in the creation of the master plan, land utilization plan, and plan for the complex. Therefore there is a problem that the function scale and location of the park are not distributed appropriately in the rear complex. Also the plan for protecting the waterway's shore, a significant resource, only considers the structural stability of the engineering works, degrading the visual and ecological quality. These experiences will be used as a case for further designing the industrial complex and for the resulting park plan.

유전 알고리즘에 기초한 제조셀의 설계 (Design of Manufacturing Cell based on Genetic Algorithm)

  • 조규갑;이병욱
    • 한국정밀공학회지
    • /
    • 제15권12호
    • /
    • pp.72-80
    • /
    • 1998
  • In this study, a design approach based on genetic algorithm is proposed to solve the manufacturing cell design problem considering alternative process plans and alternative machines. The problem is formulated as a 0-1 integer programming model which considers several manufacturing parameters, such as demand and processing time of part, machine capacity, manufacturing cell size, and the number of machines in a machine cell. A genetic algorithm is used to determine process plan for each part, part family and machine cell simultaneously.

  • PDF

농촌문화마을 주거환경개선을 위한 공간계획 방향 연구 - 경기도 양평군 광탄리 용문지구 문화마을계획을 중심으로 - (A Study on the Planning Alternatives for the Residential Environment Improvement of the New Rural Village(the YoungMoon Project Site))

  • 임승빈;조순재
    • 농촌계획
    • /
    • 제4권1호
    • /
    • pp.22-31
    • /
    • 1998
  • For the improvement of the cultural rural village(new rural village project), it is very important to find the various planning alternatives. The purpose of this study is to suggest the ideas which are able to be applied to the rural site planning. The YoungMoon project site located in Kyunggi province was selected case study, The followings are suggestions developed in the process of preparing an alternative plan for the case study. 1) The preparing of the rural site plan is the organizing process of the planning ideas responsive to the condition of both a project site and the project directions. 2) In developing the schematic plan, it is very useful to introduce the cluster madang (small public open space) including 25 houses as a basic planning unit. 3) In comparison with the project plan, the alternative plan presented by this study has advantages of amenity and public space of the residential environment of the new rural village. It is properly said that we have to more and more discuss the best solution to take in planning the rural site, and this efforts contribute the improvement of the quality of the new village project.

  • PDF

AHP 기법을 이용한 교량상부구조의 VE 검토 (Examination of Value Engineering for Bridge Superstructures using Analytic Hierarchy Process)

  • 박장호;신영석;안예준;이광균
    • 한국안전학회지
    • /
    • 제24권6호
    • /
    • pp.79-85
    • /
    • 2009
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types(Steel box girder, Rational girder, PSC-I girder) using Value Engineering(VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost(LCC). Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process(AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.

카노모델을 활용한 VE대안 검증방법 (VE Alternative Verification Method Using KANO Model)

  • 리우쥔난;차오러;박진영;김병수
    • 대한토목학회논문집
    • /
    • 제39권6호
    • /
    • pp.923-932
    • /
    • 2019
  • VE는 기능을 향상시키고 비용을 절감함으로써 시설물의 가치를 제고하는 강력한 도구로 활용되고 있다. VE의 프로세스 중 발주자의 요구사항을 파악하여 품질모델에 반영함으로써 개발된 대안이 발주자의 요구사항을 충족시키도록 하고 있다. 그러나 기능분석과 아이디어 도출 및 평가를 통하여 개발된 대안이 발주자의 요구사항을 얼마나 반영하고 있는지를 검증할 수 있는 프로세스는 없다. 본 연구는 VE Job Plan 중에 개발된 대안에 대한 발주자의 만족도를 평가할 수 있는 방법론을 개발하여 검증하고 효과성을 입증하고자 하였다. 상품기획에서 요구사항의 만족, 불만족 여부를 파악할 수 있는 카노(KANO) 모델을 VE의 대안 검증절차를 위한 방법론으로 설정하고 본 연구의 목적에 맞게 개선하여 적용하였다. 연구 결과 본 연구에서 개발된 대안평가 방법은 유용한 것으로 판단되었다. 향후 카노(KANO) 모델이 VE Job Plan 분석단계에서 VE대안에 대한 만족도를 평가하는데 활용될 것으로 기대한다.

공공교육시설 설계프로세스의 디지털 건축 디자인 도입 가능성에 관한 연구 -계획설계 단계에서 BIM의 데이터베이스(DB)이용 중심으로- (A Study on the Possibility of Introduction of Digital Architectural Design by Public Education Facilities of the Design Process - Focus on Use the Database of BIM -)

  • 성기용;조병성
    • 한국디지털건축인테리어학회논문집
    • /
    • 제12권4호
    • /
    • pp.5-12
    • /
    • 2012
  • In this study, a digital design process by utilizing the program's database functionality in BIM, public education facilities master plan presented an alternative model to the layout of the design process. First of all, public education facilities master plan design process with digital design process and how to use the database of BIM in the process for review of the possibility of. Secondly, public educational facility planning the placement as needed for the switch to digital design limits, and the basic plan design at various elementary school planning alternatives in a school building and the school site is required to investigate. Thirdly, as a way of using the database features of GDL BIM lnn and teachers on how to create a variable by setting up a number of different alternatives so that you can choose the architect thought to have to organize and visualize the possibility of quick. A quantitative way the basic plan design that repeats some of the measures that can be used for digital design change as a process of continuous research is needed.

Makespan 최소화를 위한 공정계획/일정계획 통합 시스템 (An Integrated System of Process Planning/Scheduling for Minimizing Makespan)

  • 김기동
    • 산업기술연구
    • /
    • 제18권
    • /
    • pp.139-148
    • /
    • 1998
  • Traditionally, the problems of manufacturing technology and manufacturing management have been treated independently. In this research, we endeavor to integrate the process planning and scheduling activities as an attempt to integrate the two realms. To draw up a plan of process planning and scheduling in real manufacturing environment is not an easy task because available time to plan could be limited and the shop status could change frequently. So we propose an architecture of integrated process planing and scheduling problem within the allowed time even if sheep situations change rather frequently. We argue that we can obtain a better and practical scheduling solution by dynamically changing the processing machines and operations as the shop condition changes. The proposed system takes the initial information for alternative machines and operations represented by an AND/OR graph as its input. Other informational inputs to the system are part order and shop statues. The system then generates new process plan and schedules during permitted time. Experimental results show that the proposed scheme provides a viable solution for real world scheduling problems.

  • PDF