• Title/Summary/Keyword: alternative plan

Search Result 877, Processing Time 0.027 seconds

A Study on Rational Alternative Comparison of Prior Review on Environmental Conditions for Basic Plan of Public Waters Reclamation (공유수면매립 기본계획 사전환경성검토의 합리적인 대안비교에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo;Byon, Seong-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.6
    • /
    • pp.563-571
    • /
    • 2010
  • In carrying out the prior review on environmental conditions for basic plan of public waters reclamation, the important item is review on conditions of location on prearranged reclaimed land. In this study, environmental assessment which needs careful consideration in the first stage of selecting location is presented by analyzing environmental impact assessment on public waters reclamation projects for about 10 years. The assessment index for alternative comparison is divided into two parts according to importance level. What is most important in alternative comparison is the comparison on direct influence due to reclamation. In other words, it figures out damaged extent of natural shoreline as well as intertidal and infralittoral zones. Comparing influence extent due to reclamation through the 1st comparison on this is regarded as to be important. In case there is no significant difference by alternatives through the 1st assessment, the 2nd assessment should be carried out. In the 2nd assessment indexes are damaged quantity of benthic organism, change in seawater current, erosion, accumulation and exchangeable rate of seawater. The plan for selecting optimal location which minimizes environmental influence in establishing public waters reclamation plan is demonstrated through model cases. For this, 3 districts which have similar environment and scale are selected, and then comparison on location alternative is made through environmental assessment index. In addition, the comparison on 3 arrangement alternatives are conducted, targeting certain areas. It is thought that carrying out comparison review on respective areas in the same cities and counties, not merely comparing arrangement plan by selecting 1 targeting area in advance, is the most appropriate. Besides, selection of arrangement plan considering environment, which minimizes damage of natural shoreline and influence due to change of seawater current is required in alternative comparison on arrangement plan as well. In case of the prior review on environmental conditions though alternative comparison method presented in this study is carried out, it is safely said that the influence on ocean environment due to public waters reclamation can be minimized.

A Design for the Symbol Park and the Waterfront Park for the Second Stage Development in the Eastern Rear Complex of Gwangyang Harbor (광양항 동측배후단지 2단계 사업지구 상징공원 및 수변공원 설계)

  • Hong Hyoung-Soon;Kim Do-Kyong;Jeong Han-Ho
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.3 s.116
    • /
    • pp.104-119
    • /
    • 2006
  • The eastern rear business complex of the Gwangyang Harbor (second stage) has undergone the 'alternative bid' process by which a construction company is selected based on their suggestions for an alternative plan and the bid for the construction expenses is based on the previously completed original plan, thereby implicitly accepting the arrangement and scale of the park which was presented in the original plan. It is possible, however, that the concept and plan of each park needs to be approached in a new way within the extent of given design guidelines. This study focuses on the alternative plan process and the Symbol Park (the second neighborhood park) and Waterfront Park (the third neighborhood park) among the five neighborhood parks in the eastern rear business complex (second stage). These two parks provide scale and function for the structure of the park and greenways system at the eastern rear complex. The neighboring waterway is a significant resource for emphasizing the pre-development features of the site. The alternative plan process focuses on determining the resources for the park's plan based on the environmental analyses of the site and utilizing the results. That is, through an analysis of the current state, all available resources are determined and the facilities and activities are derived based on these results. By this, Symbol Park and Waterfront Park reflect the regional features of the eastern rear complex, and these parks will feasibly perform the role of the region's key parte. The limit of this study is the fact that there is no chance for landscape architecture to actively play a role in the creation of the master plan, land utilization plan, and plan for the complex. Therefore there is a problem that the function scale and location of the park are not distributed appropriately in the rear complex. Also the plan for protecting the waterway's shore, a significant resource, only considers the structural stability of the engineering works, degrading the visual and ecological quality. These experiences will be used as a case for further designing the industrial complex and for the resulting park plan.

A Study on the Site Plan of the Contemporary Architecture in Jeju -Focused on the Comparative Study of Culture and Meeting Facilities in Domestic and Jeju- (제주지역 현대건축의 배치계획특성에 관한 연구 -국내 및 제주의 문화·집회시설에 관한 비교분석을 중심으로-)

  • Hong, Kwang-Taik;Park, Chung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.2
    • /
    • pp.117-124
    • /
    • 2010
  • This study has the purpose to examine the elements of deducing site plan of contemporary architecture in Jeju by looking into the mainly used measures and value in establishing the site plan of contemporary architecture of Jeju. Being the initial decision making stage that serves as basis in creating design alternative and completes overall designing alternative frame, Site plan is the core stage of initial architectural planning. In addition, analysis of site plan concept the central overall idea for site plan offers the perspective to access the problem for solution in site plan. Therefore, through the analysis of elements to deduce the site plan concept of the contemporary architecture in Jeju, the characteristics of site plan concept that considered the placement and locality of Jeju can be objectively examined in planning out the site plan of contemporary architecture in Jeju, and such analysis results may become objective basic data in planning out the site plan of the contemporary architecture in Jeju.

A Method for Selecting a Structural Optimal Flood Mitigation Plan Using Analytic Hierarchy Process (계층화분석기법을 통한 구조물적 홍수방어 최적대안 선정 방안 연구)

  • Lee, Jeong-Ho;Jun, Young-Joon;Ahn, Jae-Hyun;Kim, Tae-Woong
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.3
    • /
    • pp.117-126
    • /
    • 2009
  • Various dimensions of watershed structural/non-structural planning can be applied in comprehensive flood mitigation plan in a river basin. Especially structural counterplans have very broad and diverse nature as flood control facilities. It is not easy to find the optimum alternative to maximize the ability of a basin to reduce flood risk using a combination of structural counterplans. In addition, there is no standard for evaluating the performance of structural counterplans and for selecting optimal combination of them. This study focused on how to select the best alternative of a comprehensive watershed structural plan from various flood defense alternative candidates. By introducing an analytic hierarchy process, we would like to show how we decide the best alternative using standard worksheets developed in this study for economics and policy evaluation, and Expert Choice 11.5, which calculates weights for evaluation items. Based on the results from this study, we would like to suggest the best practice of a standardized watershed plan for flood protection.

Research on the method used to select an adequate rehabilitation plan for Natural River based on the river's degree of naturalness (하천자연도를 이용한 자연형하천 대안 선정기법)

  • Cho, Hong-Je;Yoon, Jong-Chun
    • Journal of Wetlands Research
    • /
    • v.11 no.3
    • /
    • pp.71-80
    • /
    • 2009
  • Due to the various characteristics of urban river, rehabilitation project for natural river requires distinct alternative approach and selection method for each different types of river. In this study, naturalness of a river was used to establish such alternative for the business and rehabilitation plan for natural river. To assess the naturalness of a river, through AHP, designed to fit the environmental conditions in Korea, was employed. Furthermore, a method that conveniently compares and selects an alternative for rehabilitation plan for natural river by referencing Urban River Basin Enhancement Methods (URBEM) was proposed. After selecting the evaluation items for assessing the naturalness of the river based on the characteristics of the river, multiple alternatives were constructed and the naturalness of river for each of those alternatives were estimated. Comparing the estimated values has made the measurement of the natural recovery effect and the product of river rehabilitation plan for each alternative efficient. In conclusion, selecting the items for evaluating the naturalness of a river with respect to its characteristics was found to be effective for establishing the rehabilitation plan for natural river.

  • PDF

A Study on the Way of Operation of EMU in Suwon-Incheon Line (수인선의 전동열차 운영방법에 관한 연구)

  • Kim, Heui-Kon;Oh, Jong-Eop;Lee, Weon-Soon;Shin, Tack-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1859-1870
    • /
    • 2009
  • Suin line is expected to be opened completely in 2015 by three stages. And the line between Suwon and Incheon(54.0km) is under construction to supply the users of southwestern area transportation convenience. The route of Suin line will be constructed to share partly with Ansan line and connect directly with Bundang line to the east and Kyeongin line to the west. That's why a lot of difficulty in train and rolling stock operation IS expected. This paper proposes an alternative plan of train operation when the line is opened partly and completely and makes an optimally alternative plan through the analyses of transportation demand, the change of human resources of operation sector according to train operation plan by an alternative proposal and operation cost.

  • PDF

Some Problems in the Evaluation of the Transportation Plan (교통계획평가에서의 제문제)

  • 최창의
    • Journal of Korean Society of Transportation
    • /
    • v.5 no.2
    • /
    • pp.37-54
    • /
    • 1987
  • The methods of the transportation plan evaluation have appearently been improved. Yet we are frequently confronted with many problems when we are trying to apply those various methods in practice. This paper aims at reviewing the major problems in the transportation plan evaluation and considering the way to resolve such kinds of problem. The selection of the evaluation criteria and the weighting systems between such criteria are the moat important things in the multi-criteria approaches. In this respect, this paper suggests some alternative evaluation criteria in consideration of the levels and the purpose of the plan. Also the increased capacities and new demands of generated trip are the main effects of the transportation investment. Nevertheless such significant effects have been neglected in the calculation of benefits due to the transportation investment in the past. Therefore this paper suggests that the surplus capacities and new demands of generated trip according to the alternative investment plans should be included in the calculation of benefits for the plan evaluation.

  • PDF

Planning of alternative countermeasures for a station blackout at a boiling water reactor using multilevel flow modeling

  • Song, Mengchu;Gofuku, Akio
    • Nuclear Engineering and Technology
    • /
    • v.50 no.4
    • /
    • pp.542-552
    • /
    • 2018
  • Operators face challenges to plan alternative countermeasures when no procedure exists to address the current plant state. A model-based approach is desired to aid operators in acquiring plant resources and deriving response plans. Multilevel flow modeling (MFM) is a functional modeling methodology that can represent intentional knowledge about systems, which is essential in response planning. This article investigates the capabilities of MFM to plan alternatives. It is concluded that MFM has a knowledge capability to represent alternative means that are designed for given ends and a reasoning capability to identify alternative functions that can causally influence the goal achievement. The second capability can be applied to find originally unassociated means to achieve a goal. This is vital in a situation where all designed means have failed. A technique of procedure synthesis can be used to express identified alternatives as a series of operations. A case of station blackout occurring at the boiling water reactor is described. An MFM model of a boiling water reactor is built according to the analysis of goals and functions. The accident situations are defined by the model, and several alternative countermeasures in terms of operating procedures are generated to achieve the goal of core cooling.

Generation of Alternative Process Plan by Net Model (네트 모델을 이용한 대체 공정 계획 생성)

  • 박지형;박면웅;강민형
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1994.10a
    • /
    • pp.743-747
    • /
    • 1994
  • A process planning system that generates alternative process plans offers multiple process plans for a part, thereby provides the flexibility to cope with the changes in shop floor status. In this paper, we introduce the concept of process net as a model for the generation of alternative process plans. We also show the usefulness of process net model by implementing the developed system to generate alternative process plans for rotational parts.

  • PDF

Ecological Restoration Plan for a Small Scale Public Construction Area - A Case Study on Ilsan Water Treatment Plant, Goyang-Si - (소규모 공공시설 개발 사업지의 생태적 복원 연구 - 고양시 일산정수장 조성예정지를 사례로 -)

  • Lee, soo-Dong;Kang, Hyun-Kyung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.6
    • /
    • pp.48-63
    • /
    • 2008
  • This research is to apply suitable natural ecosystem evaluation criteria in order to develop the ecosystem conservation, restoration and ways to build substitute habitats as a compensation plan for damaged soundly natural ecosystems in small-scale projects such as resource recovery facility, filtration, etc. The environmental ecology evaluation i.e. generally based on their actual vegetation, community structure, wildlife, water system survey were measured the primary plans for reflecting unique natural environment level of site. As a result, it is necessary to conserve the land in fallow type of wetland, good conservative condition of deciduous forest, wetlanded watercourse for amphibia and reptiles crossing. However, the plan of filtration plant was destroyed wetland(sound ecosystem), natural forest, asian toad spawning area. According to the result of it schemed to build alternative wetland and spawning area, plan to healthy ecosystem and surface soil transplantation as compensation plan. The alternative wetland and spawning area are not only created a various water levels like depth of water is $0{\sim}30cm,\;30{\sim}60cm$, more than 1.5m but also it leads to asian toad spawning and wildlife inhabitant. Moreover, the ecosystem and surface soil transplantation be applied to use the Quercus acutissima forest resources(114 upper trees, 71 canopy trees, 401 shrubs) and surface soil$(5,072m^3)$ in ecology creation sets.