• Title/Summary/Keyword: acceptance inspection

Search Result 90, Processing Time 0.024 seconds

Practical Limitations of Theoretical Acceptance Sampling (이론 샘플링 검사의 실무적 한계)

  • Choe, Seong-Un
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.205-211
    • /
    • 2011
  • The papaer reviews four theoretical acceptance sampling plans as OC(Operating Characteristics) curve based inspection, rectifying inspection, switching inspection, and continuous inspection. In addition, the study presents practical limitations of theoretical acceptance sampling by attribute and by variable. Finally, following research also recommends the sampling inspection based on production technology. However, the inspection method requires quality expertise with various experience and implicit knowledge of the field.

  • PDF

A Study on the Fluctuations in Quality of Incoming Materials and Determination of the Acceptance Inspection Type with Inspection Error (검사과오를 고려한 자재의 품질변동과 수입검사방법의 결정)

  • Lee, Hoe-Sik
    • Journal of Korean Society for Quality Management
    • /
    • v.24 no.2
    • /
    • pp.54-64
    • /
    • 1996
  • The inspection policy and inspection error are very critical factors which influence the outgoing quality. In other words, such factors influence the acceptance rate of the incoming matarials. Hence, the outgoing lot size is varied. This paper presents a method to compute the break-even point(pb1, pb2) under these two factors, which canbe used to determine the economic acceptance inspection type.

  • PDF

Bayesian Multiattribute Acceptance Sampling Plans under Curtailed Inspection (베이지안 다특성(多特性) 단축(短縮) 샘플링 검사 방식의 설계)

  • Lee, Jong Seong
    • Journal of Industrial Technology
    • /
    • v.9
    • /
    • pp.51-56
    • /
    • 1989
  • A methodology for determining optimal sampling plans for Bayesian multiattribute curtailed inspection models is proposed, whereby sampling inspection is terminated as soon as the disposition of the inspection lot is determined. An iterative solution procedure is developed for obtaining optimal multiattribute acceptance sampling plans under cuntailed sampling inspection.

  • PDF

Design and Operation of Acceptance Control Chart Using Variable Acceptance Sampling Scheme Based on Operating Characteristics(OC) Curve (계량 규준형 샘플링 검사 스킴을 이용한 합격판정 관리도의 설계 및 운영)

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.04a
    • /
    • pp.443-450
    • /
    • 2008
  • This paper is to present design principle and operation strategy of acceptance control chart by the use of OC-Based sampling inspection for continuous data. The unified control limits for acceptance control chart when considering both APL(Acceptable Process Level) and RPL(Rejectable Process Level) are proposed. The control limits can be also extended to the acceptance control chart with unknown process standard deviation.

  • PDF

Inspection and Sampling for Bulk Materials (집합체의 검사와 샘플링)

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.11a
    • /
    • pp.305-309
    • /
    • 2007
  • This study introduces acceptance sampling plans and procedures for the inspection of bulk materials. This paper also presents statistical aspects of sampling bulk materials such as general principles and sampling of particulate materials.

  • PDF

Development of Reliability Acceptance Sampling Plan for the Exponential Lifetime Distribution under Periodic Inspection and Type I Censoring (수명이 지수분포를 따를 때 정기검사 및 정시종결하에서 신뢰성 샘플링검사계획의 개발)

  • 서순근;김갑석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.21 no.1
    • /
    • pp.115-129
    • /
    • 1996
  • A reliability Acceptance Sampling Plan (RASP) is developed for testing the exponential mean lifetime under the periodic (i. e., equally-spaced) inspection and Type I censoring. Under the periodic inspection, the exact sampling distribution of maximum likelihood (ML) estimator of mean can not be derived. Hence sample size and acceptance criterion are determined by the algorithm proposed on the basis of Monte Carlo simulation such that the producer's and consumer's risks are satisfied for given censoring time and number of inspections. In addition, the developed RASP is compared in terms of sampling size, OC curve, and expected completion time. The effects for the RASP by the chosen inspection scheme are also discussed.

  • PDF

The Cost Breakeven Points in Rectifying Inspection Plans (선별형(選別型) 검사(檢査)의 경제성(經濟性)에 관한 연구(硏究))

  • Jo, Chung-Ho;Kim, Seong-In
    • Journal of Korean Society for Quality Management
    • /
    • v.11 no.2
    • /
    • pp.37-41
    • /
    • 1983
  • Nine different rectification inspection policies are considered. For each variation, the cost breakeven points between acceptance without inspection, 100% inspection and sampling inspection are evaluated in both cases where process average is constant and varies as a beta distribution.

  • PDF

A study on equilibrium of the amount of requisite materials and purchasing materials considering the fraction defective of the lot (로트불량율을 고려한 자재소요량과 자재구입량의 균형화 연구)

  • 이회식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.9 no.13
    • /
    • pp.13-16
    • /
    • 1986
  • In this paper we study the decision rule for the amount of purchasing materials according to the fraction defective in the single sampling inspection by attributes based on operating characteristics. In deciding the amount of purchasing materials, it is important that we ought to occupy the practical purchasing amount, considering the fraction defective of the lot in acceptance inspection, because the acceptance probability is variant with the fraction defective of the lot.

  • PDF

ISO/DIS 2859-1(1997), Sampling Plans Indexed by AQL for Lot-by-Lot Inspection (ISO/DIS 2859-1(1997), 계수조정형 샘플링 검사규격)

  • 홍성훈;이상영;최성일
    • Journal of Korean Society for Quality Management
    • /
    • v.27 no.1
    • /
    • pp.135-150
    • /
    • 1999
  • The second edition of the International Standard ISO/DIS 2859-1(1997) is the revised version of ISO 2859-1(1989). Significant changes in this edition include the following; ⅰ) a new procedure for switching from normal to reduced inspection is used, ⅱ) optional fractional acceptance number sampling plans are added, and ⅲ) reduced plans are changed to eliminate the gap between the acceptance and rejection numbers. In this paper, major changes and additions incorporated into the revised version are discussed.

  • PDF

A Study on the Rectifying Inspection Plan & Life Test Sampling Plan Considering Cost (소비자 보호를 위한 선별형 샘플링 검사와 신뢰성 샘플링 검사의 최적설계에 관한 연구)

  • 강보철;조재립
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.1
    • /
    • pp.74-96
    • /
    • 2002
  • The objectives of this study is to suggest the rectifying sampling inspection plan considering quality cost. Limiting quality level(LQL) plans(also called LTPD plans) and outgoing quality(OQ) plans are considered. The Hald's linear cost model is discussed with and without a beta prior for the distribution of the fraction of nonconforming items in a lot. It is assumed that the sampling inspection is error free. We consider the design of reliability acceptance sampling plan (RASP) for failure rate level qualification at selected confidence level. The lifetime distribution of products is assumed to be exponential. MIL-STD-690C and K C 6032 standards provide this procedures. But these procedures have some questions to apply in the field. The cost of test and confidence level(1-$\beta$ risk) are the problem between supplier and user. So, we suggest that the optimal life test sampling inspection plans using simple linear cost model considering product cost, capability of environment chamber, environmental test cost, and etc. Especially, we consider a reliability of lots that contain some nonconforming items. In this case we assumed that a nonconforming item fail after environmental life test. Finally, we develope the algorithm of the optimal sampling inspection plan based on minimum costs for rectifying inspection and RASP. And computer application programs are developed So, it is shown how the desired sampling plan can be easily found.