Analysis and Countermeasures for the Trouble Factors of the Spot Installation Pile Using Machine Excavation Method (기계굴착공법을 적용한 현장타설말뚝 시공시 부조화 발생요인 분석 및 대응 방안)

  • Park, Hong-Tae;Son, Chang-Baek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.75-83
    • /
    • 2009
  • Although a range of machine excavation methods are in wide use, including casing, earth drill and reverse circulation drilling, deterioration in pile quality and faulty construction can be often found these days because of trouble in the construction field. For this study, research was conducted in the form of a survey of construction engineers working in the field in order to identify the types and the causes of trouble by focusing on all casing, earth drilling and reverse circulation drilling. By analyzing the causes of trouble, countermeasures could be presented. The data and the analysts presented in this study could be effectively used for minimizing trouble in future machine excavation work during construction.

Develpment of Heavy Sheet Pile KWSP VL (Sheet pile VL의 profile 개발과 냉각방법의 개선)

  • 김효섭;조경희;김정태
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1999.08a
    • /
    • pp.37-46
    • /
    • 1999
  • Sheet pil VL 제조에 있어서 핵심적인 중요 기술은 압연 중 진행 소재가 좌우 휨이 없이 직진토록하여 치입 상에 문제가 없어야 하는 것이며, 또 하나는 압연 완료후 냉각 중에 있는 제품의 bending량을 최소로 하여 roller 교정기에서 1차 교정으로 교정이 완료되게 하는 것이다. 압연중 소재가 직진토록 하기 위해서 web와 flange 등의 caliber 협상에서 balance가 유지되어야 하므로, web와 flange의 reduction을 1:1 vs 1.0으로 web의 압하가 flange에 비해 10%정도 크게 하였고, 좌우 flange의 reduction이 변화하지 않도록 flange 온도 보존을 위하여 intermediated에서 2 pass를 생략하여 약 40초의 rolling time을 단축시켰고, 이는 7$0^{\circ}C$정도의 온도 drop를 방지하는 효과를 나타내었다. 이로 인한 roll force는 약 15%정도 down 되었다. 논리상으로 A3 변태점 이하에서 web(두꺼운 부분 24.3mm)나 flange(얇은부분 9.5mm)가 동시에 압연이 완료된다면 bending량은 휠씬 줄어든 것이나, 이 경우 roll force 증가에 따른 roll 절손 사고의 위험과 설비 trouble이 우려되기 때문에 web 온도를 약 95$0^{\circ}C$에서 flange 온도를 83.$0^{\circ}C$에서 압연 완료토록 함으로써 설비 안전을 도모하였고, 1차 교정을 위하여 냉각 주수 설비를 설치하여 공냉시켰을 때의 1400mm에서 700mm로 bending량을 감소시킴으로써 이를 가능토록하였다.

  • PDF

Compatibility Test of the Capsule with Cone Shape Bottom Guide Structures to the HANARO Reactor (원추형 하단부 구조를 갖는 캡슐의 하나로와의 양립성시험)

  • Choi, M.H.;Cho, M.S.;Choo, K.N.;Park, S.J.;Kim, B.G.;Kang, Y.H.
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.444-449
    • /
    • 2004
  • The design modification of bottom guide structures of the instrumented capsule, which is used for the irradiation test in the HANARO reactor, was required because of the trouble of the bottom guide arm's pin during irradiation. The previous structure with 3-pin arms was changed into the cone shape of one body. The specimens of the bottom end cap ring with three different sizes (${\Phi}68/70/72mm$) were designed and manufactured. The out-pile tests for the capsule with previous and new three bottom guide structures were performed in the one-channel flow test facilities. In order to evaluate the compatibility with HANARO and the structural integrity of the capsule, a loading/unloading, a pressure drop, a thermal performance, a vibration, and an endurance test were conducted. From out-pile test results, the capsule with the cone shape bottom guide structures was found to be more stable than the previous structure and the optimized size of the bottom guide structure selected was 70mm in diameter. It is expected that the new bottom guide structures will be applicable to all material and special capsules which will be designed and manufactured for the irradiation tests in the future.

  • PDF

A study on the stability of pile bridge abutment on soft ground undergoing lateral flow (연약지반에서의 말뚝기초 교대의 측방유동 대책공법 적용에 관한 연구)

  • 오일록;채영수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.753-760
    • /
    • 2003
  • An existing studies concern about movement of pile bridge abutments. However, lateral displacement cause the serious failure of bridge by embankment under soft soil lateral flow A intention is obtained by analyzing the relationship between the safety factor of evaluation for lateral movements. Precise investigation and analysis are performed, in which the lateral movement of bridge abutments has occurred, and construct design strut-slab between bridge abutments in order to restraint lateral flow. As a result of this study, it was found that when evaluation for lateral movements is allowed to use Tschebotarioff's method and lateral flow decision number (I) and revision lateral flow decision number (M$_{I}$) by Korea Highway Corporation. Most important thing is decision of pressure of lateral flow at this case. Tschebotarioff's isoscales triangle method have no trouble analysis of pressure of lateral flow. Strut-slab method are nearly not have constructed case in this field site study that applied method. The method are between abutments combined steel strut and reinforced concrete slab. This method are effective restraint lateral flow but have little difficulty if long span bridge between abutments.s.