• Title/Summary/Keyword: Yard Planning

Search Result 81, Processing Time 0.019 seconds

Development of Integrated Planning System for Efficient Container Terminal Operation (효율적인 컨테이너 터미널 운영 계획 작성을 위한 통합 시스템 개발)

  • 신재영;이채민
    • Journal of Intelligence and Information Systems
    • /
    • v.8 no.2
    • /
    • pp.71-89
    • /
    • 2002
  • In this paper, an integrated planning system is introduced for the efficient operation of container terminal. It consists of discharging and loading planning, yard planning, and berth scheduling subsystem. This interface of this system is considered for user's convenience, and the rule-based system is suggested and developed in order to make planning with automatic procedures, warning functions for errors.

  • PDF

Decision-making Problems for the Operation of Container Terminals (컨테이너터미널 운영을 위한 의사결정문제의 소개)

  • Kim, Kap Hwan
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.3
    • /
    • pp.290-302
    • /
    • 2007
  • This paper introduces several decision-making problems that need to be solved in order to facilitate the efficient operation of container terminals. These decision-making problems include the berth planning problem, the quay crane scheduling problem, the unload/load sequencing problem, the yard allocation problem, and the short-term scheduling of transporters and yard cranes. These problems can be classified into strategic decision problems, tactical decision problems, and real time operational decision problems. This paper proposes definitions of the problems that can be used to develop mathematical models for the problems.

A Study on The Plan of Terminal by RFID (RFID를 이용한 터미널 운영의 효율성에 관한 연구)

  • Kim, Sung-Soo;Lee, Myoun-Soo;Song, Yong-Seok;Nam, Ki-Chan;Kwak, Kyu-Suk
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.29 no.1
    • /
    • pp.487-492
    • /
    • 2005
  • Domestic Container Terminals have a problem of Yard Planning to load containers at terminal storage because of the narrow yard area, incorrectness of container information and late transmission of information. So this paper has an object that is a plan to use the gate and the storage of container terminal. After the information of vehicle and container is collected in advance by RFID(Radio Frequence Identification) doing active research now.

  • PDF

An Optimization of Process Planning around Quays based on the Yard Customized GIS and the Simulator (조선 전용 GIS와 안벽 시뮬레이터를 이용한 후행 중일정 최적화)

  • Ruy, Won-Sun;Hwang, Ho-Jin;Park, Chang-Kyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.2
    • /
    • pp.97-103
    • /
    • 2015
  • This paper has focused on the middle term process planning around quays based on the prefixed long-term plan of the product mixed ships. Recently, the order rate of high add-value ships in domestic shipyards has been sharply increased and the spending time at quays is accordingly on an increasing trend. For proper and practical process planning related to quays, it has to be closely connected with a long-term plan and product calendar, erection network and result of ship allocation around quays. Moreover, it is also required to include the integrated consideration of the whole process of a yard, each ship, and each team respectively. The most distinguishing feature of this study is that it would run on the ship allocation simulator and GIS framework in order not to be limited to the specific one yard and the readers can figure out the optimization formulation containing the work load leveling and a different approach from PERT/CPM. The proposed approach reflected all requirements from the department of process planning and management in a shipyard, and the analysis of the results has explained its performance of the optimization result with the examples of total 43 ships under construction from 2008 to 2013.

An Efficient Method for Allocating Storage Yard for Container Terminal (컨테이너 터미널의 장치장 활용 방안에 관한 연구)

  • Song Yong-Seok;Nam Ki-Chan;Yoo Ju-Young;Kim Tae-Won
    • Journal of Navigation and Port Research
    • /
    • v.30 no.3 s.109
    • /
    • pp.203-209
    • /
    • 2006
  • Maritime transport has been occupying the biggest part of the container transportation market. With regard to container terminal management, the planning technology and the space allocation system on the yard are very significant factors to secure the stability of ship and to ensure the reliability of schedules of ship throughout keeping barycenter of vessel by right loading and fast handling of cargoes. The purposes of this paper are to illustrate the existing yard management systems such as Grouping method and Random Grounding method, and then to evaluate and compare the efficiency of yard availability between the existing management system(Grouping method) and Random Grouping which uses the forecasted inbound cargo volume at the gate by Time Base Operation.

A Simulation-Based Capacity Analysis of a Block-Assembly Process in Ship Production Planning (시뮬레이션을 이용한 블록조립 공정 능력 분석)

  • Song, Young-Joo;Lee, Dong-Kun;Choe, Sung-Won;Woo, Jong-Hun;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.1
    • /
    • pp.78-86
    • /
    • 2009
  • A capacity calculation and process analysis is a very important part for the entire ship production planning. Ship's production plan is set up with a concept that the product is produced based on the capacity achievable by the processes while general manufacturing sets up the production plan based on product lead-time. Therefore, in case the calculation of capacity for each process of shipbuilding yard is different from actual conditions, a series of production plan - ship table composition, dual schedule plan and execution schedule plan, etc - may accumulate errors, lose reliability of planning information and cause heavy cost deficit in this course. In particular, in case of new shipbuilding yard, stocks between processes are built up and half blocks are not supplied in timely manner, and that is sometimes due to the clumsiness of the operator but it is more often because of the capacity to execute each process is not logically calculated. Therefore, this paper presents the process to calculate the assembly leadtime and assembly process capacity for shipbuilding yard assembly factory. This paper calculated the block type for calculation of assembly lead time based on block DAP(detailed assembly procedure), and introduced cases that calculate production capacities by assembly surface plate by considering the surface plate occupied area of the blocks that change depending on assembly field area and assembly processes through assembly simulation.

Study on the Resource Allocation Planning of Container Terminal (컨테이너 터미널의 자원 할당계획에 관한 연구)

  • Jang, Yang-Ja;Jang, Seong-Yong;Yang, Chang-Ho;Park, Jin-Woo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.28 no.1
    • /
    • pp.14-24
    • /
    • 2002
  • We focus on resource allocation planning in container terminal operation planning problems and present network design model and genetic algorithm. We present a network design model in which arc capacities must be properly dimensioned to sustain the container traffic. This model supports various planning aspects of container terminal and brings in a very general form. The integer programming model of network design can be extended to accommodate vertical or horizontal yard configuration by adding constraints such as restricting the sum of yard cranes allocated to a block of yards. We devise a genetic algorithm for the network design model in which genes have the form of general integers instead of binary integers. In computational experiments, it is found that the genetic algorithm can produce very good solution compared to the optimal solution obtained by CPLEX in terms of computation time and solution quality. This algorithm can be used to generate many alternatives of a resource allocation plan for the container terminal and to evaluate the alternatives using various tools such as simulation.

A Study on the Dynamic Export Yard Planning Considering Pattern of Coming-in Containers (반입 패턴을 고려한 동적 수출 장치장 운영 계획에 관한 연구)

  • Lee, Jong-Ho;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.337-339
    • /
    • 2007
  • The productivity of container terminal is usually regarded same as the productivity of quay crane. Operation of quay crane for the export is started from picking up a container in yard block. In doing so, smooth flow of container is vital to maximize the productivity of quay crane. Improvement of quay crane's productivity means improvement of entire productivity in container terminal, which reinforces the competitiveness of terminal consequently. Setting effective plan is essential to improve work flow from yard to quay crane. For optimal plan, it is necessary to gather information about exact time schedule of come-and-go containers for loading, amount of containers that will be come to terminal. Generally, the arrival time of containers and the amount of containers are definite and predictable. However, in the case of export container, the arrival time of containers is random and unpredictable. This study examines the pattern of coming-in containers as time goes in container yard and provides the solution to how to plan export yard considering the change of state in terminal and adapt it to container yard plan

  • PDF

Simulation Study for the Planning Evaluation of Port Container Terminal (컨테이너 터미널 계획 평가를 위한 시뮬레이션 연구)

  • 윤원영;안창근;최용석;김갑환
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1998.10a
    • /
    • pp.117-124
    • /
    • 1998
  • This paper proposes a simulation model which evaluates operation plans of container terminal. The operation plans of container terminal consist of berth plan, load plan, unload plan, yard plan, and equipment plan. It is discussed how to apply the simulation method to evaluate those plans. Simulation analysis is based on data about plans from the operation planning system through an interface program. It is discussed what we should got in the simulation, for example, the statistics about container-handling equipment such as container cranes, transfer cranes, yard tractors, and trailers used in the transportation of containers.

  • PDF

A Shipyard Layout Design System by Simulation (시뮬레이션 기반 조선소 레이아웃 설계 시스템 개발)

  • Song, Young-Joo;Lee, Dong-Kun;Woo, Jong-Hun;Shin, Jong-Gye
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.45 no.4
    • /
    • pp.441-454
    • /
    • 2008
  • Shipyard design and equipments layout problem, which are directly linked with the productivity of ship production, is an important issue serving as reference data of production plan for later massive production of ships. So far in many cases, design of a shipyard has been relying on the experienced engineers in shipbuilding, resulting in sporadic and poorly organized processes. And thus, economic losses as well as trials and errors in that accord have been pointed out as inevitable problems. This paper extracts a checklist of major elements to fine tune the shipbuilding yard designing process and the input/output data based on the simulation based shipbuilding yard layout designing framework and methodology proposed in existing researches, and executed initial architecture to develop software that integrates all the relevant processes and designing tools. In this course, both user request and design data by the steps are arranged and organized in the proposed layout design template form. In addition, simulation is done based on the parent shipbuilding process planning and scheduling data of the ship product, shipbuilding process and work stage facilities that constitute shipbuilding yard, and design items are verified and optimized with the layout and equipment list showing optimal process planning and scheduling effects. All the contents of this paper are based on simulation based shipbuilding yard layout designing methodology, and initial architecture processes are based on object oriented development methodology and system engineering methods.