• Title/Summary/Keyword: Worst Case Bound

Search Result 43, Processing Time 0.021 seconds

ODM: A Neighbor Discovery Protocol Based on Optimal Discovery Model in WSNs

  • Wang, Hao;Wei, Liangxiong;Yuan, Ping;Li, Xiaodi;Luo, Qian;Luo, Xiao;Chen, Liangyin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.12 no.10
    • /
    • pp.4889-4902
    • /
    • 2018
  • It is a challenging issue to improve the energy efficiency of neighbor discovery in WSNs. This paper proposes an optimal discovery model (ODM) for the first time. Based on the model, we investigate the influence of the relative size of two unequal active slots on the energy efficiency. ODM provides the energy optimal value of the length of the larger active slot at a given duty cycle. Other than existing methods, the worst-case latency bound of ODM is only one period. This is a subversive conclusion, because almost all other related methods are based on a wake-up schedule that contains several periods. We theoretically deduce that ODM can reduce worst-case discovery latency by 43.89% compared to Searchlight-Trim when their duty cycles are the same. The simulations verify the advantage of ODM.

A Study on Approximate and Exact Algorithms to Minimize Makespan on Parallel Processors (竝列處理機械상에서 總作業完了時間의 最小化解法에 관한 硏究)

  • Ahn, Sang-Hyung;Lee, Song-Kun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.16 no.2
    • /
    • pp.14-35
    • /
    • 1991
  • The purpose of this study is to develop an efficient exact algorithm for the problem of scheduling n in dependent jobs on m unequal parallel processors to minimize makespan. Efficient solutions are already known for the preemptive case. But for the non-preemptive case, this problem belongs to a set of strong NP-complete problems. Hence, it is unlikely that the polynomial time algorithm can be found. This is the reason why most investigations have bben directed toward the fast approximate algorithms and the worst-case analysis of algorithms. Recently, great advances have been made in mathematical theories regarding Lagrangean relaxation and the subgradient optimization procedure which updates the Lagrangean multipliers. By combining and the subgradient optimization procedure which updates the Lagrangean multipliers. By combining these mathematical tools with branch-and-bound procedures, these have been some successes in constructing pseudo-polynomial time algorithms for solving previously unsolved NP-complete problems. This study applied similar methodologies to the unequal parallel processor problem to find the efficient exact algorithm.

  • PDF

A Study on Approximate and Exact Algorithms to Minimize Makespan on Parallel Processors (병렬처리리례 상에서 동작업완료시간의 최소화해법에 관한 연구)

  • Ahn, Sang-Hyung;Lee, Song-Kun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.16 no.2
    • /
    • pp.13-35
    • /
    • 1991
  • The purpose of this study is to develop an efficient exact algorithm for the problem of scheduling n in dependent jobs on m unequal parallel processors to minimize makespan. Efficient solutions are already known for the preemptive case. But for the non-preemptive case, this problem belongs to a set of strong NP-complete problems. Hence, it is unlikely that the polynomial time algorithm can be found. This is the reason why most investigations have bben directed toward the fast approximate algorithms and the worst-case analysis of algorithms. Recently, great advances have been made in mathematical theories regarding Lagrangean relaxation and the subgradient optimization procedure which updates the Lagrangean multipliers. By combining and the subgradient optimization procedure which updates the Lagrangean multipliers. By combining these mathematical tools with branch-and-bound procedures, these have been some successes in constructing pseudo-polynomial time algorithms for solving previously unsolved NP-complete problems. This study applied similar methodologies to the unequal parallel processor problem to find the efficient exact algorithm.

  • PDF

Complex Permittivity and Linewidth Measurements of Microwave Ferrites Using the Cavity Perturbation Method (공진기 섭동방법을 이용한 마이크로파 페라이트의 복소 유전율과 선폭 측정)

  • 엄동진;오호석;박동철;윤상원
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.30A no.4
    • /
    • pp.11-19
    • /
    • 1993
  • The complex permittivity and the linewidth of microwave ferrites are measured using the well known cavity perturbation method. The cavity perturbation method has been widely used for the measurement of complex permittivity and conductivity of low loss magnetic and dielectric materials at microwave frequencies. TT1-2000, TT73-2200, and G-113 samples ordered from Trans-Tech Inc, are tested. TE$_{103}$ and TE$_{106}$ rectangular waveguide cavities are fabricated and the ferrite sample of cylidrical rod and sphere shapes are prepared. The error between the measurement values and the supplier's data is less than 1 percent in case of $\varepsilon$’ and about 10 percent in case of linewidth ($\Delta$H). Worst case error analysis shows that our measured results are well within the error bound calculated from the accuracy specification of the measuring instruments.

  • PDF

A Special Case of Three Machine Flow Shop Scheduling

  • Yang, Jaehwan
    • Industrial Engineering and Management Systems
    • /
    • v.15 no.1
    • /
    • pp.32-40
    • /
    • 2016
  • This paper considers a special case of a three machine flow shop scheduling problem in which operation processing time of each job is ordered such that machine 1 has the longest processing time, whereas machine 3, the shortest processing time. The objective of the problem is the minimization of the total completion time. Although the problem is simple, its complexity is yet to be established to our best knowledge. This paper first introduces the problem and presents some optimal properties of the problem. Then, it establishes several special cases in which a polynomial-time optimal solution procedure can be found. In addition, the paper proves that the recognition version of the problem is at least binary NP-complete. The complexity of the problem has been open despite its simple structure and this paper finally establishes its complexity. Finally, a simple and intuitive heuristic is developed and the tight worst case bound on relative error of 6/5 is established.

Performance Analysis of UWB Systems in the Presence of Timing Jitter

  • Guvenc, Ismail;Arslan, Huseyin
    • Journal of Communications and Networks
    • /
    • v.6 no.2
    • /
    • pp.182-191
    • /
    • 2004
  • In this paper, performances of different ultra-wideband (UWB) modulation schemes in the presence of timing jitter are evaluated and compared. Static and Rayleigh fading channels are considered. For fading channels, Oat and dispersive channels are assumed. First, bit error rate (BER) performances for each case are derived for a fixed value of timing jitter. Later, a uniform distribution of jitter is assumed to evaluate the performance of the system, and the theoretical results are verified by computer simulations. Finger estimation error is treated as timing jitter and an appropriate model is generated. Furthermore, a worst case distribution that provides an upper bound on the system performance is presented and compared with other distributions. Effects of timing jitter on systems employing different pulse shapes are analyzed to show the dependency of UWB performance on pulse shape. Although our analysis assumes uniform timing jitter, our framework can be used to evaluate the BER performance for any given probability distribution function of the jitter.

A dynamic game approach to robust stabilization of time-varying discrete linear systems via receding horizon control strategy

  • Lee, Jae-Won;Kwon, Wook-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1995.10a
    • /
    • pp.424-427
    • /
    • 1995
  • In this paper, a control law based on the receding horizon concept which robustly stabilizes time-varying discrete linear systems, is proposed. A dynamic game problem minimizing the worst case performance, is adopted as an optimization problem which should be resolved at every current time. The objective of the proposed control law is to guarantee the closed loop stability and the infinite horizon $H^{\infty}$ norm bound. It is shown that the objective can be achieved by selecting the proper terminal weighting matrices which satisfy the inequality conditions proposed in this paper. An example is included to illustrate the results..

  • PDF

An Efficient Algorithm for the Generalized Multiple Choice Linear Knapsack Problem (일반 다중선택 선형배낭문제에 대한 효율적인 해법)

  • Won, J.Y.;Chung, S.J.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.15 no.2
    • /
    • pp.33-44
    • /
    • 1990
  • An efficient algorithm is developed for the linear programming relaxation of generalized multiple choice knaspack problem. The generalized multiple choice knaspack problem is an extension of the multiple choice knaspack problem whose relaxed LP problem has been studied extensively. In the worst case, the computational coimplexity of the proposed algorithm is of order 0(n. $n_{max}$)$^{2}$), where n is the total number of variables and $n_{max}$ denotes the cardinality of the largest multiple choice set. The algorithm can be easily embedded in a branch-and-bound procedure for the generalized multiple choice knapsack problem. A numerical example is presented and computational aspects are discussed.sed.

  • PDF

Special Cases on Two Machine Flow Shop Scheduling with Weighted WIP Costs

  • Yang, Jae-Hwan
    • Management Science and Financial Engineering
    • /
    • v.15 no.2
    • /
    • pp.69-100
    • /
    • 2009
  • In this paper, we consider a relatively new two-machine flow shop scheduling problem where the unit time WIP cost increases as a job passes through various stages in the production process, and the objective is to minimize the total WIP (work-in-process) cost. Specifically, we study three special cases of the problem. First, we consider the problem where processing times on machine 1 are identical. Second, the problem with identical processing times on machine 2 is examined. The recognition version of the both problems is unary NP-complete (or NP-complete in strong sense). For each problem, we suggest two simple and intuitive heuristics and find the worst case bound on relative error. Third, we consider the problem where the processing time of a job on each machine is proportional to a base processing time. For this problem, we show that a known heuristic finds an optimal schedule.

A study on the routing and wavelength assignment in WDM ring (WDM 링에서의 루팅 및 파장할당에 관한 연구)

  • 김후곤;백천현;정용주
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.27 no.4
    • /
    • pp.1-10
    • /
    • 2002
  • The ring routing and wavelength assignment problem arose in the planning of optical communication networks which use WDM rings. Traffic demands are given for each pair of nodes in an ring : each demand must be routed one of the two possible connections round the ring and the wavelength assignments must be made so that there are no conflicts : that is. no two connections whose routes share a link can be assigned the same wavelength along that link. The objective is to minimize the number of used wavelengths. We propose the local optimal routing for the problem and show that there always exists an optimal solution satisfying it. Furthermore we suggest a new lower bound for the problem and show that it is very efficient for the worst case example.