Improvement Plan of Daily Work Accomplishment Index based Process Management based on Lean Construction Principles

  • Yoo, Dong Uk;Hong, Eun Hwa;Choi, Byung Sun;Chae, Myung Jin;Chun, Jae Youl
    • Architectural research
    • /
    • 제20권4호
    • /
    • pp.147-152
    • /
    • 2018
  • As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.

공동주택 공사의 작업간 간섭 감소 방안에 관한 연구 (A Study on the Measures for Work Interference Reduction in Apartment Construction)

  • 안성훈;김준호;강경인
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.117-122
    • /
    • 2006
  • Apartments construction is a one of largest parts in buildings construction. In apartments construction, work interferences are frequently occurred in work processing because workspaces are very various and numerous. However, though work process is important for mainly influencing to the schedule, quality and cost of apartments construction, these work interferences are considered a kind of uncertainty, which is difficult to anticipate at construction planning stage, in work processing. Therefore, this study proposed the measures for work interference reduction in apartment buildings construction and the actual planning for practices. The results can be summarized as follows: (1) the standard of work process is checked regularly. (2) The scope of work and work process is adjusted. (3) The standard of drawings process and cost about work interferences work profess is established.

Work Structuring에 의한 시공 프로세스 개선방안에 관한 연구 (A Study of Improving Construction Process by Work Structuring)

  • 나경철;김창덕;박동식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.422-427
    • /
    • 2001
  • 건설프로젝트에서 현재 사용되고 있는 작업분류체계(Work Breakdown Structure)는 프로세스 내의 세부작업간 선·후행 관계의 불확실성과 작업의 불합리한 상호 연계성에 기인한 문제점을 내포하고 있다. 이를 해결하기 위해서 본 논문에서는 Work Structuring을 제시하여 프로세스간에 투명성을 부여하고 세부작업간의 간섭을 제거시켜 작업신뢰성을 향상할 수 있는 방안을 도출하였고 프로세스를 개선하기 위한 프로세스 디자인 다이어그램을 개발하였다. WS에 의한 프로세스 개선의 목적은 고객에게 가치를 창출시켜주면서 보다 신속하고 신뢰성 있는 작업 흐름을 만드는 것을 목적으로 하고 있으며 비가치 창출작업의 감소, 프로세스의 명료화 및 투명성 향상 등에 의의가 있다.

  • PDF

Hazardous Factors and Accident Severity of Cabling Work in Telecommunications Industry

  • Kim, Yang Rae;Park, Myoung Hwan;Jeong, Byung Yong
    • 대한인간공학회지
    • /
    • 제35권3호
    • /
    • pp.155-163
    • /
    • 2016
  • Objective: This study aims to draw the characteristics of occupational accidents occurred in cabling work, and assess accident severity based on occupational injury data. Background: Accident factors and accident risk are different by the place of work in cabling work. Field managers require information on accident prevention that can be easily understood by workers. However, there has been a lack of studies that focus on cabling work in Korea. Method: This study classifies 450 injured persons caused in cabling work by process, and analyzes the characteristics of occupational injuries from the aspects of age, work experience and accident type. This study also analyzes accident frequency and severity of injury. Results: Results show that preparing/finishing (33.3%) was the most common type of cabling process in injuries, followed by maintenance (28.4%), routing/income (23.1%) and wiring/installation (15.1%) process. The critical incidents in the level of risk management were falls from height in the routing/incoming process, and falls from height in the maintenance process. And, incidents ranked as 'High' level of risk management were slips and trips, fall from height and vehicle incident in the preparing/finishing process, and fall from height in the wiring/installation process. Conclusion and Application: The relative frequency of accident and its severity by working process serve as important information for accident prevention, and are critical for determining priorities in preventive measures.

The Classification of Manufacturing Work Processes to Develop Functional Work Clothes - With a Reference to the Automobile, Machine and Shipbuilding Industries -

  • Park, Ginah;Park, Hyewon;Bae, Hyunsook
    • 패션비즈니스
    • /
    • 제16권6호
    • /
    • pp.21-35
    • /
    • 2012
  • In consideration of the injuries and deaths occurring at manufacturing sites due to the use of inappropriate work clothes or safety devices, this study aims to categorize manufacturing work processes to develop functional work clothes for heavy industries including the automobile, machine and shipbuilding industries in South Korea. Defining the features of the work environments and work postures of these industries provided for a categorization of the work processes which would enable the development of suitable work clothes for each work process' category. The results of the study based on a questionnaire survey are as follows: Work process category 1, including steel panel pressing and auto body assembly, final inspection (in automobile) and inspection (in machine), requires work clothes with upper body and arm mobility and performance to protect from the toxic fume factor. Work process category 2, consisting of welding (in automobile), cutting-and-forming (in machine) and attachment-and-construction (in shipbuilding), requires clothing elasticity, durability and heat and fire resistance. Work process category 3 comprising welding and grinding in the machine and shipbuilding industries, requires work clothes' tear resistance and elasticity, particularly for lateral bending mobility, and work clothes' sleeves' and pants' hemlines with sealed designs to defend against iron filing penetration, as well as incombustible and heat-resistant material performance. Finally, work process category 4, including painting in machine and shipbuilding, requires work clothes with waterproofing, air permeability, thermal performance, elasticity, durability and abrasion resistance.

초고층 골조공사 생산성 향상을 위한 작업 프로세스 개선 (A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building)

  • 장지선;신윤석;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.161-164
    • /
    • 2005
  • According to the trend of tail building, it is essential to improve productivity in tall building construction. However, the study on that is insufficient until now. Therefore, the purpose of this study is to propose a new work process of efficient concrete structural fame work to improve productivity in tall building construction. The results of being applied proposed work process are that the 5day cycle time of concrete structural frame work is cut by 0.5day and the quantity of rebar to be demanded in concrete structural frame work is reduced.

  • PDF

자동차 조립공정에 대한 작업자세 평가도구의 비교 (Comparison of Evaluation Tools of Work Posture in Automobiles Assembly Process)

  • 서승록
    • 대한인간공학회지
    • /
    • 제25권3호
    • /
    • pp.61-66
    • /
    • 2006
  • Awkward work postures in workshop highly affect on work-related musculoskeletal disorders(WMSDs). Especially, in automobiles assembly process, these awkward work postures of workers may cause serious injury and illness. This study is to compare the performance among the evaluation tools which can measure the work-loads caused by the awkward work postures in automobiles assemble process. RULA, REBA and TVAL(Toyota Verification of Assembly Line) are used as the evaluation tools. The 85 jobs selected in the automobiles assembly process are applied to the three tools and their performances are analyzed after the evaluation of the work-load in each job. Through various measures of performance such as statistical test, DUNCAN test, regression test etc., the tendencies and characteristics among them are analyzed in detail.

린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구 (Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles)

  • 김찬헌;김창덕
    • 한국건설관리학회논문집
    • /
    • 제2권4호
    • /
    • pp.48-61
    • /
    • 2001
  • 본 연구에서는 작업 신뢰도 향상의 한 방안으로 기존 공정 관리 기법 상의 한계점을 분석하여 이를 보완하고자 하였다. 그 결과로써 린 생산 원리를 적용한 건설 생산 공정 개선 모델인 CPAM(Construction Process Analysis Model)을 제시하였다. CPAM의 변이 관리 기법을 통해 작업 변이를 최소화시켜 공정계획의 신뢰도 향상 및 생산 효율을 증대시킬 수 있도록 하였고 CPAM에서 제시된 세부작업 일정 계획과 주간작업계획을 통해 건설 현장의 작업 흐름에서 나타날 수 있는 자재, 장비, 인력등의 재고(Inventory or Work In Process, WIP)를 감소시킬 수 있도록 하였다. 또한 본 연구는 건설 생산을 작업 흐름의 관점으로 분석함으로써 기존의 분석에서 놓치기 쉬운 작업 흐름상에서의 불확실성을 최소화시키고 작업 처리량을 최대화시킬 수 있는 대안을 제시하는 데 그 의의가 있다.

  • PDF

울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석 (An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park)

  • 성백진;이재근;최종희
    • 한국조경학회지
    • /
    • 제31권6호
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.

유전자 알고리즘을 이용한 조선 소조립 로봇용접공정의 최적화 (Optimization of Robot Welding Process of Subassembly Using Genetic Algorithm in the Shipbuilding)

  • 박주용;서정진;강현진
    • Journal of Welding and Joining
    • /
    • 제27권2호
    • /
    • pp.57-62
    • /
    • 2009
  • This research was carried out to improve the productivity in the subassembly process of shipbuilding through optimal work planning for the shortest work time. The work time consist of welding time, moving time of gantry, teaching time of robot and robot motion time. The shortest work time is accomplished by even distribution of work and the shortest welding sequence. Even distribution of work was done by appling the simple algorithm. The shortest work sequence was determined by using GA. The optimal work planning decreased the total work time of the subassembly process by 4.1%. The result showed the effectiveness of the suggested simple algorithm for even distribution of work and GA for the shortest welding sequence.