A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스 (Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects)

  • 구교진;조동현;이준호;박상헌;박찬수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

용도지역. 지구 자료간 불부합 해결을 위한 데이터모델링에 관한 연구 (A data modelling for the inconsistency resolving on zoning data)

  • 최병남;김대종;이권한
    • Spatial Information Research
    • /
    • 제8권1호
    • /
    • pp.1-14
    • /
    • 2000
  • 국토이용계획도, 도시계획도, 농업진흥지역도, 산지이용구분도 등 용도지역·지구 자료는 법적·공간적 특성으로 자료간 연관성을 가지고 있다. 그러나 부처별·부서별 제도운용에 따른 자료공유의 어려움, 수작업체계에 의한 용도지역·지구 경계선의 저확성 한P 등으로 자료간의 관계가 일관성이 결여되어 토지 이용에 많은 문제가 발생하고 있다. 이 연구에서는 GIS의 중첩기법을 이용하여 용도지역·지구 자료간 불부합 실태와 원인을 분석하고, 이러한 문제를 해결할 수 있는 방안으로서 자료간 연관성을 고려한 데이터모델링 방안을 제시하였다.

  • PDF

주거시설공사의 하도급 통합발주 프로세스 개발 (Integrating Order Process in Residential Building Construction)

  • 김용원;박형진;정진현;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.84-85
    • /
    • 2013
  • Integrating multi-trade works system helps to reduce to minimize the conflict of subcontract business and improve communication to increase productivity of construction. However it takes such a big risk if subcontract of integrating multi-trade works went bankrupt during the project so some of construction companies executed to only small project and it's not sufficient to adopt overall project. This paper suggested the improvement scheme of work classification integrating multi-trade works, which takes a consideration into work zoning in order to apply current work situation.

  • PDF

Extreme wind prediction and zoning

  • Holmes, J.D.;Kasperski, M.;Miller, C.A.;Zuranski, J.A.;Choi, E.C.C.
    • Wind and Structures
    • /
    • 제8권4호
    • /
    • pp.269-281
    • /
    • 2005
  • The paper describes the work of the IAWE Working Group WGF - Extreme Wind Prediction and Zoning, one of the international codification working groups set up in 2000. The topics covered are: the international database of extreme winds, quality assurance and data quality, averaging times, return periods, probability distributions and fitting methods, mixed wind climates, directionality effects, the influence of orography, rare events and simulation methods, long-term climate change, and zoning and mapping. Recommendations are given to promote the future alignment of international codes and standards for wind loading.

사무공간 구조에 따른 실내공기 중 생물학적 오염분포 특성 (Microbiological Contamination in Office Buildings by Work Space Structure)

  • 원동환;허은혜;정호철;문경환
    • 한국환경보건학회지
    • /
    • 제38권3호
    • /
    • pp.213-222
    • /
    • 2012
  • Objectives: This study was undertaken in order to evaluate by work space zoning and structure the concentrations of biological contaminants in the indoor air of domestic office buildings. Methods: Air samples were collected in the office spaces of 15 office buildings in Seoul from June 28 to July 28, 2011. Prior to the sampling, each office was classified into 'open-plan office', 'cellular office' and 'mixed office' according to the work space zoning. To evaluate the biological contamination of indoor air, total suspended bacteria (TSB), Gram positive bacteria (GPB), Staphylococcus aureus (S.A), Methicillin-resistant Staphylococcus aureus (MRSA), Gram negative bacteria (GNB) and fungi were investigated. During the sampling, temperature, relative humidity and carbon dioxide ($CO_2$) were measured. Results: The TSB concentrations ($GM{\pm}GSD$) were $452({\pm}1.3)cfu/m^3$ in open-plan offices, $366({\pm}1.3)cfu/m^3$ in cellular offices and $287({\pm}1.5)cfu/m^3$ in mixed offices, and there were significant differences between the three groups (p<0.05). The highest concentrations ($GM{\pm}GSD$) of fungi were found in the indoor air of cellular offices $128({\pm}1.0)cfu/m^3$, which was at least three times higher than the concentrations in mixed offices $43({\pm}1.0)cfu/m^3$ (p<0.05). Conclusions: Microbiological contamination in the indoor air of office buildings by work space structure was the highest with the open-plan office layout which includes no high walls or doors separating the occupants.

수치임상도 작업매뉴얼의 개선방안에 관한 연구 (A Study on the Improvement of Guideline in Digital Forest Type Map)

  • 박정묵;도미령;심우담;이정수
    • 한국지리정보학회지
    • /
    • 제22권1호
    • /
    • pp.168-182
    • /
    • 2019
  • 본 연구는 "임상도 현행화 제작(DB구축 작업매뉴얼)" (이하 작업매뉴얼)의 제작과정과 방법을 검토하고, 1:5k 수치임상도(이하 임상도)에 평가항목을 적용하여 제작과정과 방법에 대한 문제점 도출 및 개선방안 제시를 목적으로 하였다. 임상도에 적용되는 평가항목은 구획과 속성에 관한 사항으로 구분하였으며, 행정구역별 임분구조 특성과 파편화 분석을 통하여 작업매뉴얼의 제작과정과 방법의 문제점을 도출하였다. 작업매뉴얼의 구획에 관한 사항은 '인위적변화지와 자연적변화지'의 항목에서 제작과정이 제안되어있고 전국을 5분할하여 자연적변화지는 5년 주기로 인위적 변화지는 매년 갱신하고 있기 때문에 지역 간 구축된 임상도 DB의 일관성을 알아보고자 파편화를 분석하였다. 전국의 산림 패치수(Number of Patches)는 증가하고, 평균패치크기(Mean of Patch Size)가 감소하여 파편화 정도와 형태의 복잡성이 증가하였으며, 17개 광역시 도 중 4개의 지역은 파편화 정도와 형태의 복잡성이 감소하여 지역 간의 편차가 발생하였다. 또한, '산림의 구분' 항목에서 최소구획면적은 0.1ha로 구분하고 있기 때문에 임상도에서 구획된 객체(폴리곤 단위) 면적을 산출하여 최소구회면적 기준을 검토한 결과 전체 객체 중 최소구획면적 기준 미만이 되는 객체의 비율은 약 26%나 차지하였다. 이에 따라 '인위적변화지와 자연적변화지'의 갱신 주기와 정의 확립이 필요하며, 최소구획면적 기준에 대한 구획 기준의 개선이 필요하다. 한편, 작업매뉴얼의 속성에 관한 사항은 '수종변화' 항목에서 지형지물체계를 52종으로 분류하고 있으며, 이 중 입목지는 43종으로 분류하고 있어, 임상도에서 구축된 수종정보를 추출하여 분포비율을 검토하였다. 입목지 수종 중 분포비율이 0.1% 미만인 수종은 23종으로 약 53%를 차지하고 있으며, 상위 3종은 소나무와 기타수종으로 구획되어 있다. 또한, 무립목지의 관목덤불은 지형지물체계에서 분류하고 있지만, '산림의 구분' 항목에서는 정의 및 판독기준이 마련되어 있지 않기 때문에 '수종변화'의 지형지물체계의 재정립과 관목덤불에 대한 정의 정립이 필요하다.

벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究) (The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction)

  • 김준호;김광희;조형근
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

WORK BARGE 선의 냉동.공조 SYSTEM (HVAC & Refrigeration System for Work Barge Vessel)

  • 남임우;정재천;김봉제
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.583-590
    • /
    • 2008
  • 최근 작업자 숙소 및 이송용 외에 작업용으로 사용 가능한 Barge선의 일종인 Accommodation Work Barge 선의 건조량이 증가 추세인 바 현재 중국에서 건조 중인 해당 선박의 HVAC & Refrigeration system에 대하여 정리하였다. 본 시스템은 R404A Direct expansion 냉각방식 (직접팽창방식)이 적용되었으며 HVAC system 중 Air conditioning 부분에 대해서는 선박의 각 Deck 기준으로 Zoning 하여 개별적인 Air handling unit와 Condensing unit를 구성하였으며 (각 unit의 용량은 필요용량의 100%), 냉동 창고의 Refrigeration system은 해당 격실 (육고, 어고, 야채고)에 각각 Unit cooler를 설치하고, Condensing unit를 기계실에 설치하였다. 장비는 전체 용량 100%에 대하여 항시 운전하는 100% 용량의 장비와 비상시에 운전하는 100% 용량의 예비 장비로 구성된다. 냉동 창고에 인접한 Dry provision store는 냉동 창고와는 별개로 중앙 공조기로부터의 냉각 공기를 이용하여 Spot cooling하였다. 본 System의 구성에 대한 장점 및 단점은 아래와 같다. 1. Air conditioning system이 각 Zone에 대하여 구성되므로 각 Zone에 대하여 제어가 가능하다. 2. Air con. 실에 Air handling unit와 Condensing unit가 설치되므로 냉매 배관의 길이가 짧다. 3. Air con. 실에 Air handling unit와 Condensing unit가 설치되므로 실내의 Maintenance space 상에 여유가 없다.

  • PDF

건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로- (The application of tact time at finish work for building construction - Focused on Office Building -)

  • 윤유상;서상욱
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.90-97
    • /
    • 2005
  • 현대의 건축공사는 고층화 추세에 따라 반복공정의 수가 증가하여 작업 연속성에 대한 계획 및 공사관리가 중요하게 인식되고 있다. 특히, 많은 반복공정이 동시에 수행되는 마감공사는 작업흐름의 관리에 따라 전체공사에 큰 영향을 미치므로 작업 연속성에 대한 계획이 필요하다. 마감공사의 합리적 운영을 위해 작업연속성을 확보하여 목표공기를 달성하는 기법인 택트 공정관리에서는 택트타임을 설정하여 반복작업의 작업편차를 일정하게 하여 공사계획을 수립한다. 그러나, 기존 택트공정 관리와 관련된 연구는 작업구역분할, 작업일보, 택트 공정관리 프로세스 등을 수행하였지만 작업 연속성 확보를 위한 택트타임에 대한 연구는 충분히 수행되어 있지 않은 실정이다. 따라서 본 연구에서는 3점추정견적 방법에 의한 택트타임의 설정방법과 작업기간 조정절차를 제시하여 택트타임 기반의 공정계획수립 방법을 제시하였으며, 이와 같은 방법에 의한 택트공정 계획 수립을 통해 목표공기가 지연되지 않음을 입증하였다.