• Title/Summary/Keyword: Work zoning

Search Result 27, Processing Time 0.03 seconds

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects (공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스)

  • Koo, Kyo-Jin;Cho, Dong-Hyun;Lee, Jun-Ho;Park, Sang-Hun;Park, Chan-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

A data modelling for the inconsistency resolving on zoning data (용도지역. 지구 자료간 불부합 해결을 위한 데이터모델링에 관한 연구)

  • 최병남;김대종;이권한
    • Spatial Information Research
    • /
    • v.8 no.1
    • /
    • pp.1-14
    • /
    • 2000
  • Zoning data such as national land use planning map, urban land use planning map, agricultural promotion zoning ap, forest land zoning map has a relationship each other in law and spatial context. But difficulties in data share and the lack of accuracy of manual work makes serious inconsistence son zoning data relationship. This causes many trial and error in land use. For resolving this problem the data modellingmethod is presented as a technical solution.

  • PDF

Integrating Order Process in Residential Building Construction (주거시설공사의 하도급 통합발주 프로세스 개발)

  • Kim, Yongl-Won;Park, Hyung-Jin;Jung, Jin-Hyun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.84-85
    • /
    • 2013
  • Integrating multi-trade works system helps to reduce to minimize the conflict of subcontract business and improve communication to increase productivity of construction. However it takes such a big risk if subcontract of integrating multi-trade works went bankrupt during the project so some of construction companies executed to only small project and it's not sufficient to adopt overall project. This paper suggested the improvement scheme of work classification integrating multi-trade works, which takes a consideration into work zoning in order to apply current work situation.

  • PDF

Extreme wind prediction and zoning

  • Holmes, J.D.;Kasperski, M.;Miller, C.A.;Zuranski, J.A.;Choi, E.C.C.
    • Wind and Structures
    • /
    • v.8 no.4
    • /
    • pp.269-281
    • /
    • 2005
  • The paper describes the work of the IAWE Working Group WGF - Extreme Wind Prediction and Zoning, one of the international codification working groups set up in 2000. The topics covered are: the international database of extreme winds, quality assurance and data quality, averaging times, return periods, probability distributions and fitting methods, mixed wind climates, directionality effects, the influence of orography, rare events and simulation methods, long-term climate change, and zoning and mapping. Recommendations are given to promote the future alignment of international codes and standards for wind loading.

Microbiological Contamination in Office Buildings by Work Space Structure (사무공간 구조에 따른 실내공기 중 생물학적 오염분포 특성)

  • Won, Dong-Hwan;Huh, Eun-Hae;Jeong, Ho-Chul;Moon, Kyong-Whan
    • Journal of Environmental Health Sciences
    • /
    • v.38 no.3
    • /
    • pp.213-222
    • /
    • 2012
  • Objectives: This study was undertaken in order to evaluate by work space zoning and structure the concentrations of biological contaminants in the indoor air of domestic office buildings. Methods: Air samples were collected in the office spaces of 15 office buildings in Seoul from June 28 to July 28, 2011. Prior to the sampling, each office was classified into 'open-plan office', 'cellular office' and 'mixed office' according to the work space zoning. To evaluate the biological contamination of indoor air, total suspended bacteria (TSB), Gram positive bacteria (GPB), Staphylococcus aureus (S.A), Methicillin-resistant Staphylococcus aureus (MRSA), Gram negative bacteria (GNB) and fungi were investigated. During the sampling, temperature, relative humidity and carbon dioxide ($CO_2$) were measured. Results: The TSB concentrations ($GM{\pm}GSD$) were $452({\pm}1.3)cfu/m^3$ in open-plan offices, $366({\pm}1.3)cfu/m^3$ in cellular offices and $287({\pm}1.5)cfu/m^3$ in mixed offices, and there were significant differences between the three groups (p<0.05). The highest concentrations ($GM{\pm}GSD$) of fungi were found in the indoor air of cellular offices $128({\pm}1.0)cfu/m^3$, which was at least three times higher than the concentrations in mixed offices $43({\pm}1.0)cfu/m^3$ (p<0.05). Conclusions: Microbiological contamination in the indoor air of office buildings by work space structure was the highest with the open-plan office layout which includes no high walls or doors separating the occupants.

A Study on the Improvement of Guideline in Digital Forest Type Map (수치임상도 작업매뉴얼의 개선방안에 관한 연구)

  • PARK, Jeong-Mook;DO, Mi-Ryung;SIM, Woo-Dam;LEE, Jung-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.1
    • /
    • pp.168-182
    • /
    • 2019
  • The objectives of this study were to examine the production processes and methods of "Forest Type Map Actualization Production (Database (DB) Construction Work Manual)" (Work Manual) identify issues associated with the production processes and methods, and suggest solutions for them by applying evaluation items to a 1:5k digital forest type map. The evaluation items applied to a forest type map were divided into zoning and attributes, and the issues associated with the production processes and methods of Work Manual were derived through analyzing the characteristics of the stand structure and fragmentation by administrative districts. Korea is divided into five divisions, where one is set as the area changed naturally and the other four areas set as the area changed artificially. The area changed naturally has been updated every five years, and those changed artificially have been updated annually. The fragmentation of South Korea was analyzed in order to examine the consistency of the DB established for each region. The results showed that, in South Korea, the number of patches increased and the mean patch size decreased. As a result, the degree of fragmentation and the complexity of shapes increased. The degree of fragmentation and the complexity of shapes decreased in four regions out of 17 regions (metropolitan cities and provinces). The results indicated that there were spatial variations. The "Forest Classification" defines the minimum area of a zoning as 0.1ha. This study examined the criteria for the minimum area of a zoning by estimating the divided object (polygon unit) in a forest type map. The results of this study revealed that approximately 26% of objects were smaller than the minimum area of a zoning. The results implied that it would be necessary to establish the definition and the regeneration interval of "Areas Changed Artificially and Areas Changed Naturally", and improve the standard for the minimum area of a zoning. Among the attributes of Work Manual, "Species Change" item classifies terrain features into 52 types, and 43 types of them belong to stocking land. This study examined distribution ratios by extracting species information from the forest type map. It was found that each of 23 species, approximately 53% of species, occupied less than 0.1% of Forested land. The top three species were pine and other species. Although undergrowth on unstocked forest land are classified in the terrain feature system, their definition and classification criteria are not established in the "Forest Classification" item. Therefore, it will be needed to reestablish the terrain feature system and set the definitions of undergrowth.

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

HVAC & Refrigeration System for Work Barge Vessel (WORK BARGE 선의 냉동.공조 SYSTEM)

  • Nam, Im-Woo;Jung, Jae-Chun;Kim, Bong-Je
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.583-590
    • /
    • 2008
  • 최근 작업자 숙소 및 이송용 외에 작업용으로 사용 가능한 Barge선의 일종인 Accommodation Work Barge 선의 건조량이 증가 추세인 바 현재 중국에서 건조 중인 해당 선박의 HVAC & Refrigeration system에 대하여 정리하였다. 본 시스템은 R404A Direct expansion 냉각방식 (직접팽창방식)이 적용되었으며 HVAC system 중 Air conditioning 부분에 대해서는 선박의 각 Deck 기준으로 Zoning 하여 개별적인 Air handling unit와 Condensing unit를 구성하였으며 (각 unit의 용량은 필요용량의 100%), 냉동 창고의 Refrigeration system은 해당 격실 (육고, 어고, 야채고)에 각각 Unit cooler를 설치하고, Condensing unit를 기계실에 설치하였다. 장비는 전체 용량 100%에 대하여 항시 운전하는 100% 용량의 장비와 비상시에 운전하는 100% 용량의 예비 장비로 구성된다. 냉동 창고에 인접한 Dry provision store는 냉동 창고와는 별개로 중앙 공조기로부터의 냉각 공기를 이용하여 Spot cooling하였다. 본 System의 구성에 대한 장점 및 단점은 아래와 같다. 1. Air conditioning system이 각 Zone에 대하여 구성되므로 각 Zone에 대하여 제어가 가능하다. 2. Air con. 실에 Air handling unit와 Condensing unit가 설치되므로 냉매 배관의 길이가 짧다. 3. Air con. 실에 Air handling unit와 Condensing unit가 설치되므로 실내의 Maintenance space 상에 여유가 없다.

  • PDF

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.