• Title/Summary/Keyword: Work management system

Search Result 3,472, Processing Time 0.032 seconds

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

A Study on the Service Support Program for the Work-Family Balance in the Community (일-가정 균형을 위한 지역사회의 지원에 대한 고찰)

  • Jeong, Jee-Young;Cho, Seung-Eun
    • Journal of Family Resource Management and Policy Review
    • /
    • v.12 no.1
    • /
    • pp.21-39
    • /
    • 2008
  • The purpose of this study was to investigate service support programs for the work-family balance in the community. Service support programs in the community are at beginning stages of development, because it has taken about 10 years to put a self-governing system into practice in Korea. This study concentrates on service support programs developed by various service organizations in the city and does not include any rural districts. First, the developmental process of the work-family balance model and type of the service support program in the community were studied. Next, the situation of care service support was examined based on written articles. Finally, a few suggestions were made f3r work-family balance in the community. The developmental situation of work-flmily balance in Korea is in a stage which is shifting from the company-leading model to a family-company-community model. The most common type of service support program offered in the community until now has been the informal sector through relatives, neighbors or friends. However, service support programs, in the public sector by the government and in the voluntary sector by nonprofit organizations and corporations, has rapidly been growing and the number of services from each sector has also increased. Profit organizations in the private sector, such as medical and care service centers, are also now rapidly increasing. It appears that service support programs contributing to the work-family balance in the community come from a number of sectors, including public, voluntary, private and informal sectors, to suit consumer needs.

  • PDF

Performance Assesment based Dashboards for Maintenance Management System (설비관리 업무를 위한 성과평가 기반의 대시보드 시스템 개발)

  • Kim, Kwang Man
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.4
    • /
    • pp.417-426
    • /
    • 2014
  • Plant management have a greatest influence on the corporate variety of tasks such as production, quality, environment. So, various performance indices for plant management are operating. But plant management tasks can be carried out effectively, so that all of how to organize and efficiently manage indicators is lacking real condition In this paper, improved profitability, cost savings by applying the concept for the performance assessment, plant management services, such as the key indices for performance according to the objectives of the firm. Dashboard for plant management work using me to develop a system that manage.

A Study On Management Porgocol For Distributed Systems Management (분산시스템관리를 위한 관리 프로토콜에 관한 연구)

  • 박승섭
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.163-175
    • /
    • 1999
  • As the size and complexity of network increase, Distributed Systems Management (DSM) will be significant issue within information network in order to increase the high reliability and to improve the flexibility of network management. The OSI management model has several problems. The key problems are that it does not fully address the problems of how to develop communication protocol in support of DSM, and how to classify the management connection criteria. In this paper, to solve first problem described above, this paper propose the connectionless CMIP(Common Management Information Protocol) to accomplish for effectively managing the distributed management system, and indicate its efficiency; this protocol is available to negotiate among the managing systems, handle the dynamic information. To work out second problem, we introduce the connection criteria in the hierarchy of management systems, and finally evaluate the efficiency of a suggested protocol during cooperative negotiation among the managing systems.

Development of PDA and Web-based System for Quality Inspection and Defect Management of Apartment Housing Project (PDA 및 웹 기반의 공동주택 품질점검 밀 하자관리 시스템의 개발)

  • Oh Se-Wook;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.140-150
    • /
    • 2005
  • Recently, quality inspection and defect management have been considered as one of the major issues for increasing customer satisfaction and corporate image in domestic construction industry. However, the quality inspection and defect management have not been performed systematically because of insufficient field managers, the excessive amount of documents, complicated work process and difficulty in communicating construction information. Therefore, the field manager could not perform the quality inspection and defect management work in time as well as the reliability of recorded quality and defect data was decreased. The primary objective of this study is to propose a quality inspection and defect management system using information technology which enables field managers to efficiently gather the information of defection in apartment housing. It is anticipated that the effective use of the proposed system would be able to imp개ve communication among the related participants and systematically accumulate data that might be used in similar construction projects.

DEVELOPMENT OF A CONTROL SYSTEM FOR AN AUTOMATIC ROAD SIGN REMOVING EQUIPMENT USING HIGH PRESSURE WATER-JET (초고압수를 이용한 노면표시 자동제거 장비개발을 위한 제어시스템 및 노면최적조건에 대한 연구)

  • Kwon Soon-Wook;Kim Kyoon-Tai;Han Jae-Goo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.139-146
    • /
    • 2004
  • Resent removal work for road signs has been labor intensive and required times since it has been done manually using shaving type equipment. While traditional process is conducting, there are traffic jams caused by the passing control, and happened unexpected accidents to workers working at dangerous road circumstance. Besides, in current shaving method, there are high potentialities on the air pollution as well as the explosive accident occurred by using a propane gas. So, as an alternative, we have studied to develop the automatic erasing equipment made up with a high pressure water-jet system and automatic control system, mobile system; Wate-rjet system consists of an intensifier and nozzles to give a high pressure and spray on the sign, and automatic control system is composed of one axis robot using a hydraulic servo actuator controlled by a lever, And as a mobile system, a truck plays an important role for the transport of equipment and the forward movement in a removal process. In this paper, we have analyzed the characteristics of road signs and have investigated current erasing methods in the field. And we have organized and designed automatic erasing equipment, and we have made a basic experiment to find out the optimal spray condition as like the spray distance, spray angle and injection pressure.

Development of Project Management System for Geothermal Well Construction (지열발전 시추공 구축 프로젝트관리시스템 개발)

  • Kim, Kwang-Yeom;Lee, Seung-Soo
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.38-46
    • /
    • 2012
  • Enhanced Geothermal System (EGS) among geothermal system types enables to produce sustainable energy even in non-volcanic region while conventional geothermal energy has been restricted to obtain only from hot and permeable formation such as in volcanic regions. Successful EGS project in terms of economy, however, can be expected only when the project is managed effectively considering most of influencing factors (e.g., tangible and intangible resources, cost, time, risks, etc.). In particular, well construction is of the utmost importance in geothermal project as it dominantly influences on time and cost in the whole project. Therefore, when it comes to viable geothermal project without abundant experience, managing drilling economically and efficiently is inevitable. In this study, a project management system for well construction in geothermal project based on project control system including work breakdown structure and cost account was developed to predict and assess the performance of drilling and to visualize the progress.

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

Time-varying Network Model of Conveyor Systems

  • Kang, Maing-Kyu
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.7 no.2
    • /
    • pp.5-29
    • /
    • 1982
  • This paper presents the network models for general dynamic conveyor systems which are characterized by transporting and storing materials between work stations over time. With an appropriate choice of time-slice the conveyor system can be represented exactly as a dynamic flow network which can be solved by an efficient pure network algorithm.

  • PDF